CleanPermit
HomePermit tools
24 free resources

Permit tools

Find a calculator, checklist or worksheet by the job you need to do.

Tool / Construction coverage

Disturbed acreage calculator

Measure distinct disturbance on your site, then check it against one acre with any additional ground in the same plan of development or sale.

Open tool
Tool / Construction coverage

Operator-role worksheet

Record who can change the plans and who can direct compliance work, one entity and phase at a time.

Open tool
Tool / Construction coverage

Drainage and outfall path worksheet

Follow one drainage area from disturbed ground to its site exit and downstream destination. Keep unknown connections visible.

Open tool
Tool / Field inspections

SWPPP inspection report template

Fill in a same-day construction site inspection and print an unsigned report. For a blank form to take into the field, download EPA’s Word template under Official sources. Dewatering inspections and corrective-action logs are separate records.

Open tool
Tool / Field inspections

Permit-based inspection calendar

Plan the next three fixed-interval routine inspections and, separately, one confirmed storm inspection. Supply the rule from your permit; this tool does not choose it.

Open tool
Tool / Field inspections

Corrective-action register

Match one or more field findings to completion records. Flag open and past-due items against the due dates you supply, and print the register for review.

Open tool
Tool / State filing desks

Texas construction stormwater lookup

Find the official search for a permit number, operator, street or county. After searching, enter what you found to get the next verification step. No live records are retrieved here.

Open tool
Tool / State filing desks

Florida construction NOI filing prep

Turn a start, expiration or takeover date into a filing target. Check the pollution prevention plan, receiving system and separate approvals.

Open tool
Tool / State filing desks

California SMARTS packet builder

Prepare the next handoff for a traditional project under the statewide 2022 construction permit. Match a technical or signing role to the actual filing status.

Open tool
Tool / Wetlands & crossings

Aquatic impact quantity worksheet

Separate temporary-only and permanent footprints on one mapped feature. Reconcile shared ground without counting it twice.

Open tool
Tool / Wetlands & crossings

Wetland permit application packet checker

Identify the office to contact and prepare a cover note with the proposed work, exhibits, and questions the reviewer still needs answered.

Open tool
Tool / Wetlands & crossings

Crossing alternatives comparison

Compare two designs on the same crossing. See which footprints shrink, which grow and which measurements are still missing.

Open tool
Tool / Air & equipment

Potential-to-emit workbook

Build a one-pollutant worksheet from maximum hourly rates. Compare full-year capacity with a documented hours scenario, unit by unit.

Open tool
Tool / Air & equipment

Hazardous air pollutant inventory

Combine annual emitted mass by chemical identity, flag repeated emission streams, and identify the largest individual total.

Open tool
Tool / Air & equipment

Air permit equipment change worksheet

Compare existing and proposed equipment. Get separate questions for the air construction permit decision and the operating permit file.

Open tool
Tool / Industrial stormwater

Industrial stormwater no exposure certification checklist

Check industrial materials and activities across the whole facility, including planned changes. See what blocks certification or where to file if the official checklist also checks out. This is not the certification form.

Open tool
Tool / Industrial stormwater

Industrial stormwater permit issuer and sector finder

Identify a starting agency and look up a federal sector example. This is not a parcel-level jurisdiction check or a list of state permit requirements.

Open tool
Tool / Industrial stormwater

Industrial stormwater outfall sampling planner

Plan a field visit, calculate a collection window from your permit, and decide what to record if you cannot collect.

Open tool
Tool / Oil storage & SPCC

SPCC oil storage capacity inventory

Turn an equipment list into separate aboveground and completely buried totals. Flag unresolved containers before using the totals to screen a non-farm site.

Open tool
Tool / Oil storage & SPCC

SPCC secondary containment calculator for a rectangular berm

Check a flat, rectangular berm around stationary aboveground bulk oil storage. Compare measured space with the largest tank release plus rain, and see the gallons short or left over. This is not the sizing test for a transfer rack or production site.

Open tool
Tool / Oil storage & SPCC

SPCC qualified facility screen

Find the next federal SPCC plan path for an onshore, non-transportation-related oil facility. The screen keeps unknowns open and applies a separate farm branch.

Open tool
Tool / Demolition notices

Find the asbestos demolition notification form for your job site

Get official filing links for Massachusetts and selected California routes. Elsewhere, find the NESHAP contact who can confirm the form. There is no single filing portal for every U.S. job.

Open tool
Tool / Demolition notices

Compare asbestos quantities by unit

Total inspection entries within each unit and compare each subtotal with its federal threshold.

Open tool
Tool / Demolition notices

Asbestos notice deadline planner

Work backward from a proposed start, or check the different steps for a date change, annual notice or urgent project.

Open tool