Tool / Wetlands & crossings

Crossing alternatives comparison

Compare two designs on the same crossing. See which footprints shrink, which grow and which measurements are still missing.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Leave unknowns blank. Enter 0 only for a verified zero.
Leave unknowns blank. Enter 0 only for a verified zero.
Leave unknowns blank. Enter 0 only for a verified zero.
Leave unknowns blank. Enter 0 only for a verified zero.
Leave unknowns blank. Enter 0 only for a verified zero.
Leave unknowns blank. Enter 0 only for a verified zero.

Worked example

A span reduces permanent wetland fill and reach disturbance, but its crane pad needs more temporary wetland access than a culvert.

See the result for the example inputs
  1. Embedded culvert → Clear span (same crossing and study limits):
  2. Permanent wetland footprint: 610 ft² → 140 ft² (470 ft² less).
  3. Temporary-only wetland footprint: 420 ft² → 720 ft² (300 ft² more).
  4. Affected stream reach: 85 linear ft → 20 linear ft (65 linear ft less).
  5. The measured changes trade off; no one design reduces every measured footprint.
  6. Before selecting a design, compare passage, flood capacity, restoration, access and cost against the same project purpose. Areas and lengths are not a permit score.
Next on this task

Guides for this worksheet

All wetlands & crossings resources →