{
  "version": 1,
  "website": "https://cleanpermit.com",
  "api": {
    "path": "/api/evaluate",
    "method": "POST",
    "contentType": "application/json",
    "example": {
      "tool": "disturbed-acreage-calculator",
      "inputs": {
        "a": "0.75",
        "unitA": "Acres",
        "b": "1210",
        "unitB": "Square yards",
        "overlap": "242",
        "otherAcres": "0.15"
      }
    }
  },
  "topics": [
    {
      "id": "area",
      "name": "Construction coverage",
      "url": "https://cleanpermit.com/topics/area/",
      "scope": "U.S. construction stormwater screening, with EPA’s 2022 Construction General Permit as modified in 2025 as the federal example. State, Tribal, territorial and local rules may differ. These worksheets organize site evidence; they do not determine jurisdiction, grant coverage or authorize work."
    },
    {
      "id": "field",
      "name": "Field inspections",
      "url": "https://cleanpermit.com/topics/field/",
      "scope": "U.S. construction stormwater field records. Use your issued permit, current coverage, applicable state, Tribal or local terms and site SWPPP. EPA’s 2022 CGP is an example for its coverage areas, not a nationwide schedule. Drafts do not certify, file or establish compliance."
    },
    {
      "id": "states",
      "name": "State filing desks",
      "url": "https://cleanpermit.com/topics/states/",
      "scope": "Public-record searches, filing preparation and operator handoffs in Texas, Florida and California. These worksheets do not query agency records, file forms or determine permit coverage."
    },
    {
      "id": "aquatic",
      "name": "Wetlands & crossings",
      "url": "https://cleanpermit.com/topics/aquatic/",
      "scope": "U.S. planning worksheets for wetland and stream work. Compare mapped footprints and prepare questions for the reviewing offices; these tools do not establish jurisdiction, permit eligibility or authorization."
    },
    {
      "id": "air",
      "name": "Air & equipment",
      "url": "https://cleanpermit.com/topics/air/",
      "scope": "US stationary-source air permitting. Prepare emissions estimates and equipment records for review under the applicable state, local, tribal or federal program. These tools do not determine eligibility or authorize construction or operation."
    },
    {
      "id": "industrial",
      "name": "Industrial stormwater",
      "url": "https://cleanpermit.com/topics/industrial/",
      "scope": "The federal no exposure exclusion is for qualifying industrial facilities, not construction stormwater. Use the federal NeT-MSGP filing service only where EPA issues the permit. The location and sector examples do not resolve parcel boundaries, state permit terms or deadlines."
    },
    {
      "id": "oil",
      "name": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/topics/oil/",
      "scope": "U.S. federal Spill Prevention, Control, and Countermeasure (SPCC) planning for onshore, non-transportation-related oil operations. Screen capacities and plan choices; document assumptions. These worksheets are not a certified plan, engineering design, emergency reporting decision or state-law determination."
    },
    {
      "id": "notices",
      "name": "Demolition notices",
      "url": "https://cleanpermit.com/topics/notices/",
      "scope": "Plan U.S. demolition and renovation notifications using the federal asbestos air rule and the receiving program’s instructions. These tools organize inspection records and filing questions; they do not classify material, submit notices or authorize work."
    }
  ],
  "resources": [
    {
      "kind": "tools",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/tools/disturbed-acreage-calculator/",
      "slug": "disturbed-acreage-calculator",
      "title": "Disturbed acreage calculator",
      "summary": "Measure distinct disturbance on your site, then check it against one acre with any additional ground in the same plan of development or sale.",
      "sources": [
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        },
        {
          "name": "40 CFR § 122.26(b)(15) · Small construction and designation",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-122/subpart-B/section-122.26#p-122.26(b)(15)"
        },
        {
          "name": "EPA · Frequent questions on the 2022 CGP (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2022-01/cgp-frequent-questions.pdf"
        },
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ],
      "example": "A grading plan shows 0.75 acre. A 1,210-square-yard access strip shares 242 square yards with it. The site footprint is 0.95 acre. Another 0.15 acre of utility work outside these outlines brings the same plan to 1.10 acres.",
      "sample": {
        "a": "0.75",
        "unitA": "Acres",
        "b": "1210",
        "unitB": "Square yards",
        "overlap": "242",
        "otherAcres": "0.15"
      },
      "fields": [
        {
          "key": "a",
          "label": "First footprint area",
          "type": "number",
          "help": "Measure the land to be disturbed, not the lot. For one footprint only, enter 0 for the second area and the overlap."
        },
        {
          "key": "unitA",
          "label": "First footprint unit",
          "type": "select",
          "options": [
            "Square feet",
            "Acres",
            "Square yards"
          ]
        },
        {
          "key": "b",
          "label": "Second footprint area",
          "type": "number",
          "help": "Enter its full area before subtracting any shared ground."
        },
        {
          "key": "unitB",
          "label": "Second footprint and overlap unit",
          "type": "select",
          "options": [
            "Square feet",
            "Acres",
            "Square yards"
          ]
        },
        {
          "key": "overlap",
          "label": "Area common to both footprints",
          "type": "number",
          "help": "Use the second footprint’s unit. Enter 0 only if you know there is no shared area. If unknown, measure it on an overlay first."
        },
        {
          "key": "otherAcres",
          "label": "Additional disturbance in the same common plan (acres or Unknown)",
          "type": "text",
          "help": "Use the plat and grading plans to count only ground outside both outlines, including other lots, roads and later phases. Enter 0 only if those records establish no additional disturbance; enter Unknown if the extent or connection is unresolved."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/tools/operator-role-worksheet/",
      "slug": "operator-role-worksheet",
      "title": "Operator-role worksheet",
      "sources": [
        {
          "name": "EPA · Appendix A: Definitions (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/appendix-a-definitions.pdf"
        },
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ],
      "summary": "Record who can change the plans and who can direct compliance work, one entity and phase at a time.",
      "example": "A grading contractor cannot revise the design but can order a crew to repair sediment controls. Record the two answers separately rather than relying on its subcontractor title.",
      "sample": {
        "entity": "Grading contractor",
        "phase": "East pad · rough grading",
        "plan": "No",
        "field": "Yes",
        "evidence": "Earthwork agreement §4; superintendent directs the erosion-control crew."
      },
      "fields": [
        {
          "key": "entity",
          "label": "Entity being reviewed",
          "type": "text",
          "help": "Use an organization or role rather than a personal name."
        },
        {
          "key": "phase",
          "label": "Area and phase under review",
          "type": "text"
        },
        {
          "key": "plan",
          "label": "Can this entity change construction plans and specifications?",
          "type": "select",
          "options": [
            "Yes",
            "No",
            "Unclear"
          ]
        },
        {
          "key": "field",
          "label": "Can it direct day-to-day activities needed for permit compliance?",
          "type": "select",
          "options": [
            "Yes",
            "No",
            "Unclear"
          ]
        },
        {
          "key": "evidence",
          "label": "Evidence or open question",
          "type": "textarea",
          "help": "Cite a contract clause, site instruction or handoff record. If absent, identify what you need to request."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/tools/drainage-outfall-worksheet/",
      "slug": "drainage-outfall-worksheet",
      "title": "Drainage and outfall path worksheet",
      "sources": [
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA · Construction mapping tools and SWPPP templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ],
      "summary": "Follow one drainage area from disturbed ground to its site exit and downstream destination. Keep unknown connections visible.",
      "example": "Runoff from the south pad enters inlet I-4. A utility sketch shows pipe P-6 but not its outlet. Keep the receiving water unknown until the connection is checked.",
      "sample": {
        "start": "South pad, DA-2",
        "exit": "South curb inlet I-4",
        "kind": "Pipe or storm sewer",
        "links": "Pipe P-6; outlet not shown",
        "water": "Unknown",
        "status": "Partially traced",
        "basis": "Utility sketch sheet 3; request downstream as-built from storm sewer owner."
      },
      "fields": [
        {
          "key": "start",
          "label": "Starting drainage area",
          "type": "text"
        },
        {
          "key": "exit",
          "label": "Site discharge point or last known feature",
          "type": "text",
          "help": "Use a map ID and location. For an unverified exit, say where the trace stops."
        },
        {
          "key": "kind",
          "label": "Route from the site",
          "type": "select",
          "options": [
            "Pipe or storm sewer",
            "Ditch or swale",
            "Overland flow",
            "Connection unknown"
          ]
        },
        {
          "key": "links",
          "label": "Downstream links in order",
          "type": "textarea",
          "help": "List pipes, swales, basins and outlets. Put each segment on its own line or separate them with arrows. Use “Unknown” for a missing segment."
        },
        {
          "key": "water",
          "label": "Receiving water, or Unknown",
          "type": "text",
          "help": "A storm drain inlet is not the receiving water. Do not guess a stream name from proximity."
        },
        {
          "key": "status",
          "label": "How far is the route supported by evidence?",
          "type": "select",
          "options": [
            "Traced to receiving water",
            "Partially traced",
            "Not yet checked"
          ]
        },
        {
          "key": "basis",
          "label": "Evidence and follow-up",
          "type": "textarea",
          "help": "Identify a dated plan, observation or asset record and the next check."
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/under-one-acre-common-plan/",
      "slug": "under-one-acre-common-plan",
      "title": "Do I need a SWPPP for less than one acre?",
      "answer": "Possibly. For a lot under one acre, first ask how much land the whole common plan of development or sale will ultimately disturb. If that total reaches one acre, a construction stormwater discharge can require coverage even for a small lot. Where the EPA Construction General Permit (CGP) applies, an operator seeking coverage prepares a SWPPP before filing a Notice of Intent. If the entire plan is smaller, check for an agency designation and separate local requirements rather than assuming an exemption.",
      "steps": [
        "Start with the recorded plat, grading drawings, sales materials and utility plans. Note dates and identifiers that link the work. A common street address or the same owner alone does not show the intended extent.",
        "Draw separate outlines for your lot, shared infrastructure and other planned ground disturbance. Distinguish disturbance from preserved land; do not add up entire parcel areas.",
        "Ask the developer which portions were built, are active or remain planned and who controls each. Request existing permit records, but do not assume a developer’s authorization names or covers a later builder.",
        "Present the dated plan and your own role to the issuing authority. If only an old plat links the work, document whether earlier construction ended and the ground was finally stabilized. EPA’s common-plan FAQ distinguishes new work after completion from an unfinished buildout; do not count or discard an old phase based only on its date."
      ],
      "example": "A builder plans to disturb 0.38 acre on Lot 7. The recorded subdivision plan shows 0.72 acre of distinct disturbance for a road and utilities outside the lot. Together the mapped areas already total 1.10 acres before other lots. The useful question is how the lot relates to that plan, not whether 0.38 rounds up to one.",
      "next": "Bring the plat, combined footprint and existing coverage records to the authority. Ask how this lot and its operator fit within the larger plan.",
      "sources": [
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        },
        {
          "name": "40 CFR § 122.26(b)(15) · Small construction and designation",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-122/subpart-B/section-122.26#p-122.26(b)(15)"
        },
        {
          "name": "EPA · Frequent questions on the 2022 CGP (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2022-01/cgp-frequent-questions.pdf"
        },
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/count-staging-and-access-disturbance/",
      "slug": "count-staging-and-access-disturbance",
      "title": "Do staging yards and access roads count as disturbed land?",
      "answer": "Look at what happens to the ground, not what the plan calls the space. Stripping a temporary equipment pad or grading a new haul road changes the footprint even if it is restored later. Using existing pavement without altering it presents a different acreage question; materials stored there can still affect runoff.",
      "steps": [
        "Walk the logistics plan with the superintendent. Mark new entrances, trailer pads, utility trenches, stockpiles, borrow areas and disposal areas; include off-site locations in the review.",
        "For each area record the existing surface, proposed work, dimensions and any overlap with grading already measured. Show an unchanged paved lot separately from soil stripped along its shoulder.",
        "Separate acreage from discharge coverage. For a support yard, EPA CGP Part 1.2.1(c) asks whether it directly serves this work, is noncommercial, does not serve multiple unrelated sites, ends with the project and has the required stormwater controls.",
        "Give a reviewer both the acreage overlay and a list of support facilities with operators and drainage destinations. Do not assume a commercial supplier or an off-site yard shares the main site’s authorization."
      ],
      "example": "A temporary gravel entrance is 20 by 160 feet on previously vegetated ground. Its first 40 feet are inside the original grading outline. The addition is 20 × 120 = 2,400 square feet, not the full 3,200. An adjacent unchanged asphalt loading area stays on the pollution-source map, without counting its entire paved surface as new soil disturbance.",
      "next": "Add the measured new ground to the disturbance worksheet and show the paved loading area as a separate runoff-management question.",
      "sources": [
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA · Appendix A: Definitions (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/appendix-a-definitions.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/measure-overlapping-construction-phases/",
      "slug": "measure-overlapping-construction-phases",
      "title": "How do you measure overlapping phases without counting land twice?",
      "answer": "Measure the ground disturbed at least once over the plan’s life. This combined footprint differs from both the sum of all phase totals and the largest area exposed at one time. Keep those figures separate: temporary stabilization or a repeat excavation changes the work history, not the location of the ground.",
      "steps": [
        "Put each phase outline on a common scaled base. Include later access or grading beyond an earlier limit. Reconcile design revisions before measuring the overlap.",
        "Start with Phase A. For each later phase, add only its area outside everything already counted. For three or more phases, compare to the combined earlier outline, not each earlier phase independently.",
        "Retain the original outlines and a merged outline without internal boundaries. Label units and plan revision; keep full precision until the final display, especially near a reporting threshold.",
        "If the team also needs peak exposed area, use a separate timeline showing stabilization and reopening dates. A schedule by itself does not show how much of two phases occupies the same ground."
      ],
      "example": "A disturbs 0.80 acre. B disturbs 0.50 acre, including 0.30 inside A, so the combined outline is 1.00 acre. C disturbs 0.25 acre, of which 0.20 is already inside that combined outline. The project footprint becomes 1.05 acres, not 1.55, even if no two phases are open together.",
      "next": "Save both the merged footprint and the phase-by-phase exposure schedule so the next reviewer knows which number they are using.",
      "sources": [
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA · Appendix A: Definitions (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/appendix-a-definitions.pdf"
        },
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/who-controls-construction-stormwater-work/",
      "slug": "who-controls-construction-stormwater-work",
      "title": "Who is the operator when the owner, builder and contractor differ?",
      "answer": "Under EPA’s construction permit, either of two kinds of control matters: authority to change construction plans and specifications, or day-to-day authority over the activities needed to meet permit conditions. More than one entity can have control. A job title, inspection assignment or promise to pay a fee does not settle the question.",
      "steps": [
        "List legal entities by phase and area. Ask who can authorize a grading revision, not just who draws it. Read the approval and change-order clauses and identify any reserved authority.",
        "Use a field example: after an inlet control fails, who can actually order a crew and equipment to repair it today? Separate that authority from reporting the problem or carrying out someone else’s instruction.",
        "For a shared basin or entrance, record whose crews work there, who can direct repairs and who coordinates across operators. Check both contracts and actual practice for gaps.",
        "Compare those facts to the applicable permit’s operator definition. Under the EPA CGP each operator seeking coverage submits its own NOI, even where multiple operators use a shared SWPPP; confirm the procedure for your issuer."
      ],
      "example": "The developer approves grading revisions; the general contractor orders all field repairs. An inspection firm photographs damaged silt fence but can only recommend repair. Record the first two authorities separately and the inspector’s reporting limit. Do not list the inspector as the sole operator simply because it signed inspection reports.",
      "next": "Complete an operator-role worksheet for each entity, then resolve any control assigned to nobody or claimed by two parties.",
      "sources": [
        {
          "name": "EPA · Appendix A: Definitions (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/appendix-a-definitions.pdf"
        },
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        },
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/trace-a-storm-drain-to-receiving-water/",
      "slug": "trace-a-storm-drain-to-receiving-water",
      "title": "Where does runoff go after it enters a storm drain?",
      "answer": "An inlet is a waypoint, not proof of the receiving water. Follow each drainage area through its site discharge point, pipes, ditches or ponds to the water that receives the discharge. A municipal separate storm sewer system (MS4) can carry runoff well beyond the nearest stream.",
      "steps": [
        "Use pre- and post-grading contours to sketch flow arrows. Give each site exit a distinct ID. Check low points, overflow paths and temporary diversions; one site can drain in opposite directions.",
        "At each pipe or ditch, record the inlet and outlet IDs and match them to the drainage plan or the storm sewer owner’s asset records. Observe only from a safe, authorized surface location; never enter a structure to complete the trace.",
        "Record the last supported link and the source for it. Mark missing connections as unknown. Ask the system owner for the outfall sheet rather than drawing a straight line to the closest waterbody.",
        "Once the route is supported, check receiving-water names, impairments and designations against official records. Keep the map edition and verification date; a mapped route is not a determination of federal jurisdiction."
      ],
      "example": "The nearest creek lies west of a parking lot. The city asset map shows inlet I-4 flows east through pipe P-6 to outfall O-12 at a different brook. Label I-4 and O-12 separately and save the map reference. If the sheet ends at P-6, record “receiving water unknown” until the next link is found.",
      "next": "Complete a drainage worksheet for each site exit and send the unresolved asset IDs to the storm sewer owner.",
      "sources": [
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA · Construction mapping tools and SWPPP templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/noi-swppp-and-authorization-differences/",
      "slug": "noi-swppp-and-authorization-differences",
      "title": "What is the difference between a SWPPP, an NOI and authorization?",
      "answer": "The Stormwater Pollution Prevention Plan (SWPPP) describes site conditions, controls and who will implement them. A Notice of Intent (NOI) is an operator’s filing for general permit coverage. Authorization is the effective coverage under the issuing agency’s rules. A finished plan or submission receipt is not the same thing as an effective authorization.",
      "steps": [
        "Identify the permitting authority first. The EPA CGP applies only where EPA issues it; a state-issued permit may use different forms, review periods and posting requirements.",
        "For the EPA CGP, prepare the SWPPP before submitting the NOI. Match operator, acreage, receiving waters and project limits across the plan and filing; resolve discrepancies rather than copying stale values.",
        "Save the signed filing, evidence of complete receipt, any agency correspondence, the tracking number and the effective date as distinct records. For an ordinary new EPA site, the usual review is 14 calendar days after EPA notifies the operator that it received a complete NOI, unless delayed or denied.",
        "Before scheduling earthwork, compare the intended start with the actual authorization record and applicable conditions. A local grading approval is a separate record, not a substitute for the stormwater coverage check."
      ],
      "example": "A SWPPP is signed Monday, the NOI is sent Tuesday and EPA requests a correction Friday. The team has a plan and a submission history, but Tuesday’s upload is not evidence the review period started. File the corrected NOI and look for EPA’s complete-receipt notice and any delay before recording an effective date.",
      "next": "Keep the plan, the filing history and the effective-coverage record together, with a different date and owner for each.",
      "sources": [
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        },
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/evidence-for-small-construction-waiver/",
      "slug": "evidence-for-small-construction-waiver",
      "title": "What evidence supports a small construction waiver?",
      "answer": "A dry forecast or short grading schedule is not a waiver. First check whether the issuing authority offers one and which rules apply to the whole common plan. EPA Appendix C describes distinct low rainfall erosivity, approved TMDL and equivalent-analysis routes for small construction; the evidence for one does not establish another.",
      "steps": [
        "Document the unique disturbed acreage and larger plan, operator, coordinates and expected construction period. For the federal small-construction size screen, distinguish at least one but less than five acres from a larger plan that will disturb five or more.",
        "For low erosivity, retain the official R-factor result, coordinates and dates from initial disturbance through final stabilization. EPA’s test is R less than 5, not a local rain total. Appendix C sets specific conditions for using interim nonvegetative stabilization as the end date.",
        "For the TMDL route, identify the receiving water, drainage area and EPA-established or approved analysis concluding that small-construction controls are unnecessary. For non-impaired waters, the equivalent-analysis route needs an actual pollutant allocation analysis, not simply a clean water listing.",
        "Keep the certification and its submission date. EPA requires submission before construction and approval for the TMDL and equivalent-analysis requests. If the schedule slips, check Appendix C before the original end date: a new calculation can change the next filing step."
      ],
      "example": "A crew expects to finish grading a 1.6-acre site on June 10, but its stabilization schedule extends through July 15. A calculator printout ending June 10 does not document that full exposure period. Use the supportable end date and retain the revised result; a worksheet or printout does not file a certification.",
      "next": "Take the full schedule, common-plan acreage and proposed evidence to the issuer; verify its process before relying on a waiver.",
      "sources": [
        {
          "name": "EPA · Appendix C: Small construction waivers and instructions (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2022-01/2022-cgp-final-appendix-c-waivers.pdf"
        },
        {
          "name": "EPA · Rainfall erosivity factor calculator",
          "url": "https://lew.epa.gov/"
        },
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/build-a-construction-stormwater-site-map/",
      "slug": "build-a-construction-stormwater-site-map",
      "title": "What should a construction stormwater site map show?",
      "answer": "A useful site map lets a new inspector locate disturbed ground, follow runoff and find the control that protects each discharge point. An architectural plot plan alone rarely answers those questions. EPA CGP Part 7.2.4 provides a detailed list; use the applicable permit’s list as the final check.",
      "steps": [
        "Start with a legible base showing property limits, construction limits and phase boundaries as different lines. Add a scale, north arrow, revision date, preconstruction cover, slopes before and after grading, stockpiles, paved exits and support areas.",
        "Show drainage arrows, water crossings, discharge points and any storm sewer connections. Use an inset for downstream waters: EPA Part 7.2.4 calls for receiving waters on site and within one mile downstream of discharge points, including applicable impairment and tier designations.",
        "Plot controls, buffers and pollutant sources using IDs shared with the SWPPP and inspection forms. Include washout and waste areas where applicable. Use layers or a second sheet if the labels obscure the field locations.",
        "Walk a route with the printed drawing. Can a substitute inspector find control C-3 and tell which discharge it protects? Record the verification date and revise the map and plan when field changes make them inaccurate."
      ],
      "example": "The grading sheet labels one basin, but a field walk finds two inlets and an overflow swale. On the site sheet, label I-1, I-2 and overflow D-2; use a downstream inset for the pipe connection. If D-2’s destination is unverified, draw that segment dashed and assign someone to confirm it.",
      "next": "Give the field team the revised map and record who will verify the dashed connection.",
      "sources": [
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA · Construction mapping tools and SWPPP templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Construction coverage",
      "url": "https://cleanpermit.com/guides/document-construction-coverage-changes/",
      "slug": "document-construction-coverage-changes",
      "title": "What changes when the footprint, operator or receiving water changes?",
      "answer": "Keep three records in view: what changed in the field, what the current SWPPP shows and what the operator reported on its NOI. Updating one does not automatically update the others. Replacing an operator is different from correcting the same entity’s name.",
      "steps": [
        "Make a dated before-and-after record: revised work limits, added acreage, changed flow route, affected controls and the entities controlling each area. Attach the marked-up map and planned effective date.",
        "For the same operator, check whether the SWPPP must change and whether an NOI field changed. EPA CGP Part 1.4.4 lists changes, including disturbed acreage and receiving-water changes, that trigger a 14-day review; affected work must wait as specified there.",
        "For a replacement operator under the EPA CGP, coordinate a new NOI ahead of transfer. The outgoing operator cannot rely on the transfer route for termination until it has transferred all areas under its control and the successor has obtained coverage. Keep both parties’ records.",
        "For a partial sale, mark transferred versus retained areas, who maintains shared controls and when control actually shifts. Check the permit’s update and termination procedures; do not close the entire site record simply because one lot changed hands."
      ],
      "example": "An operator adds a 0.25-acre laydown pad that drains to a second brook. Compare the revised acreage and receiving water to the NOI and update the site map and controls. If a new legal entity later takes over the whole job, start a separate operator handoff; renaming the old operator in the plan is not that handoff.",
      "next": "Set a handoff meeting around the effective records and unresolved shared controls, not just the closing date.",
      "sources": [
        {
          "name": "EPA · 2022 Construction General Permit, as modified (Parts 1–9, PDF)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA · Getting coverage and small construction waivers",
          "url": "https://www.epa.gov/npdes/getting-coverage-under-epas-construction-general-permit-waivers"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/tools/swppp-inspection-report/",
      "slug": "swppp-inspection-report",
      "title": "SWPPP inspection report template",
      "sources": [
        {
          "name": "EPA · Download the blank Site Inspection Report Template (Word)",
          "url": "https://www.epa.gov/system/files/documents/2022-01/site-inspection-report-template.docx"
        },
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ],
      "summary": "Fill in a same-day construction site inspection and print an unsigned report. For a blank form to take into the field, download EPA’s Word template under Official sources. Dewatering inspections and corrective-action logs are separate records.",
      "example": "A rain inspection reaches outlet 1, but a flooded bank blocks outlet 2. Keep the observed discharge and the inspection gap in separate sections.",
      "sample": {
        "site": "Cedar Yard • North Lots LLC • east grading area",
        "permitId": "Training permit EX-14 (illustrative)",
        "day": "2026-04-14",
        "start": "08:10",
        "end": "09:05",
        "inspector": "J. Lee, site inspector; training file Q-4",
        "schedule": "EX-14 §4B: 14 calendar days plus qualifying storms, east grading area.",
        "reason": "Rain event",
        "weather": "Gauge G1: 0.32 in between Apr 13 07:00 and Apr 14 07:00 local. Overcast at arrival.",
        "route": "Rough grading; map rev 3: east slope, fuel pad, stabilized entrance, I-3 and outlet 1.",
        "findings": "I-3: fabric separated from frame; bypass to outlet 1 (photo E14-2, CA-04).\nFuel pad: containment intact; no leaks observed at walk. Entrance: no track-out on road.",
        "stabilization": "East slope: grading paused Apr 8; blanket installed Apr 9. No bare patches or lifted edges observed.",
        "outfalls": "Outlet 1 flowing toward east ditch: tan water and fresh deposit at apron. Outlet 2 not observed.",
        "access": "Outlet 2: flooded bank; no safe line of sight. Foreman to reassess from upper path at 12:00.",
        "actions": "CA-04: foreman assigned to contain bypass now and replace damaged control; due Apr 15 at 16:00 local under EX-14 §5. Photos E14-1 to E14-3."
      },
      "fields": [
        {
          "key": "site",
          "label": "Project, operator and location",
          "type": "text"
        },
        {
          "key": "permitId",
          "label": "Permit authority and coverage ID",
          "type": "text"
        },
        {
          "key": "day",
          "label": "Inspection date",
          "type": "date"
        },
        {
          "key": "start",
          "label": "Local start time (HH:MM)",
          "type": "text"
        },
        {
          "key": "end",
          "label": "Local finish time (HH:MM)",
          "type": "text"
        },
        {
          "key": "inspector",
          "label": "Inspectors, titles and qualification reference",
          "type": "text"
        },
        {
          "key": "schedule",
          "label": "Inspection frequency and permit clause",
          "type": "text",
          "help": "Name the schedule that applies to the area walked, not just the reason for today’s walk."
        },
        {
          "key": "reason",
          "label": "Inspection basis",
          "type": "select",
          "options": [
            "Routine",
            "Rain event",
            "Snowmelt discharge",
            "Follow-up"
          ]
        },
        {
          "key": "weather",
          "label": "Weather and trigger evidence",
          "type": "textarea",
          "help": "For an event, enter readings, times, units and gauge/station. For snowmelt, also describe discharge."
        },
        {
          "key": "route",
          "label": "Phase, areas checked and control IDs",
          "type": "textarea",
          "help": "Use the map revision and the route actually walked. Identify material storage, exits and control locations."
        },
        {
          "key": "findings",
          "label": "Control findings and observed noncompliance",
          "type": "textarea",
          "help": "One line per location: control ID, whether it worked, what you saw, and any photo or action ID. Include spill or leak risks and places needing a new or changed control."
        },
        {
          "key": "stabilization",
          "label": "Stabilized and exposed areas",
          "type": "textarea",
          "help": "Identify the area, cover and condition. For a paused area include when work stopped and when cover began or was completed. If none applied to this walk, say why."
        },
        {
          "key": "outfalls",
          "label": "Discharge points, receiving waters and sediment observations",
          "type": "textarea",
          "help": "One line per outlet: map ID, flowing, dry or not observed; visible color, solids, sheen, erosion or deposits; and downstream observations visible from a safe location."
        },
        {
          "key": "access",
          "label": "Uninspected areas, hazards and follow-up",
          "type": "textarea",
          "help": "If the entire route was checked, say so; do not mark an inaccessible point dry."
        },
        {
          "key": "actions",
          "label": "Maintenance, corrective actions and attachments",
          "type": "textarea",
          "help": "Link the control to its action ID, immediate steps, owner, due time and photo or log. For repeated maintenance, record earlier fixes and why the chosen response fits."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/tools/permit-inspection-calendar/",
      "slug": "permit-inspection-calendar",
      "title": "Permit-based inspection calendar",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ],
      "summary": "Plan the next three fixed-interval routine inspections and, separately, one confirmed storm inspection. Supply the rule from your permit; this tool does not choose it.",
      "example": "If the confirmed routine interval is 14 days after April 1, plan for April 15. A qualifying event on April 14 at 16:20 with a 24-hour elapsed window creates a separate April 15 time limit.",
      "sample": {
        "basis": "Training permit EX-14 §4B, east grading area: every 14 calendar days plus 24 elapsed hours after a qualifying event.",
        "last": "2026-04-01",
        "interval": "14",
        "storm": "Qualifying event confirmed; elapsed-hour window applies",
        "event": "2026-04-14T16:20-05:00",
        "hours": "24"
      },
      "fields": [
        {
          "key": "basis",
          "label": "Permit and confirmed inspection clause",
          "type": "textarea",
          "help": "Identify the actual permit, site area, frequency and any storm clause. Do not enter a proposed rule."
        },
        {
          "key": "last",
          "label": "Last completed routine inspection",
          "type": "date"
        },
        {
          "key": "interval",
          "label": "Confirmed interval in calendar days",
          "type": "number",
          "help": "Use only a fixed interval that applies to this site area. Not for calendar-month or business-day rules."
        },
        {
          "key": "storm",
          "label": "Confirmed storm-clause status",
          "type": "select",
          "options": [
            "No storm clause applies to this schedule",
            "Storm clause applies; no qualifying event confirmed",
            "Qualifying event confirmed; elapsed-hour window applies"
          ]
        },
        {
          "key": "event",
          "label": "Trigger timestamp, or a dash",
          "type": "text",
          "help": "For a confirmed event use YYYY-MM-DDTHH:MM with numeric UTC offset, e.g. 2026-04-14T16:20-05:00. Use the trigger defined in your permit, not the forecast time."
        },
        {
          "key": "hours",
          "label": "Confirmed elapsed hours, or a dash",
          "type": "text",
          "help": "Enter whole elapsed hours only for a confirmed event. Otherwise enter a dash (– or -)."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/tools/corrective-action-register/",
      "slug": "corrective-action-register",
      "title": "Corrective-action register",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ],
      "summary": "Match one or more field findings to completion records. Flag open and past-due items against the due dates you supply, and print the register for review.",
      "example": "One outlet repair is complete; an inlet repair still lacks a completion record. Both stay in the register, but only the open repair is flagged for follow-up.",
      "sample": {
        "project": "Cedar Yard • Training permit EX-14",
        "asof": "2026-04-16",
        "issues": "CA-03 | 2026-04-10 10:00 | Outlet 1 apron displaced | Protected exposed edge | Grading lead | 2026-04-15 | EX-14 §5; due 10:00 local\nCA-04 | 2026-04-14 08:30 | I-3 fabric separated; flow bypassed inlet | Contained bypass | Site foreman | 2026-04-15 | EX-14 §5; due 16:00 local",
        "done": "CA-03 | 2026-04-13 15:00 | Rebuilt apron per detail D-3 | Photo P-7; no scour at April 14 recheck | No plan change; restored approved detail"
      },
      "fields": [
        {
          "key": "project",
          "label": "Project and permit",
          "type": "text"
        },
        {
          "key": "asof",
          "label": "Register status as of (site date)",
          "type": "date"
        },
        {
          "key": "issues",
          "label": "Actions: one per line, seven columns separated by |",
          "type": "textarea",
          "help": "ID | identified YYYY-MM-DD HH:MM | location and specific condition | immediate steps taken | accountable person | confirmed due YYYY-MM-DD | permit basis and any exact due time"
        },
        {
          "key": "done",
          "label": "Completion records: one per line, or a dash",
          "type": "textarea",
          "help": "ID | completed YYYY-MM-DD HH:MM | repair performed | effectiveness evidence / follow-up | SWPPP change or reason none. Omit unfinished actions."
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/inspection-report-data/",
      "slug": "inspection-report-data",
      "title": "What belongs in a construction inspection report?",
      "answer": "Someone who missed the walk should be able to retrace it: who inspected what, when and why, what they actually saw, and who is dealing with each finding. A checked box alone cannot distinguish a dry outlet from one nobody reached.",
      "steps": [
        "Start with the permit ID, inspector names and titles, date, times, construction phase and reason for the inspection. For event inspections, attach the actual measurements and source used.",
        "Use the current map to identify disturbed areas, controls, exits, discharge points and material storage areas. Describe both functioning controls and specific problems. Identify observed noncompliance; mark areas not observed and why.",
        "Cross-reference photo IDs, routine maintenance and corrective action entries. Use the applicable report deadline and authorized signature process. Under EPA Part 4.7.1, complete the report within 24 hours after finishing the inspection. Keep it accessible and retain it for at least three years after coverage expires or terminates (Parts 4.7.3–4). Part 4.6.3 addresses separate dewatering reports."
      ],
      "example": "“I-3 fabric separated at northwest corner; sediment fan on pavement beyond inlet; see photo 12 and CA-04” tells the foreman where to go. “Inlets checked” does not.",
      "next": "Use the inspection report template to draft today’s record. For a paper walk, download EPA’s blank Word template; check your issuer’s form and signature requirements before using either.",
      "sources": [
        {
          "name": "EPA · Download the blank Site Inspection Report Template (Word)",
          "url": "https://www.epa.gov/system/files/documents/2022-01/site-inspection-report-template.docx"
        },
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/rainfall-inspection-triggers/",
      "slug": "rainfall-inspection-triggers",
      "title": "When does measured rain trigger a site inspection?",
      "answer": "Start with the schedule that applies to this drainage area, not a generic rainfall threshold. Find the measured quantity, accumulation period, clock start and response window in the issued permit. Keep storm and routine deadlines visible separately.",
      "steps": [
        "Record the gauge or representative station, units, reading times and time zone. A forecast may justify mobilizing the crew but does not establish that a measured threshold was reached.",
        "As an example only, EPA Part 4.2.2 pairs a 14-day schedule with event inspections: 0.25 inches or more of rain in 24 hours triggers a 24-hour window. Smaller storms can add up; the permit separately addresses consecutive qualifying days, normal working hours and snowmelt discharge. Other schedules and authorities differ.",
        "If the gauge failed, note the gap rather than entering zero. Locate a representative source allowed by the permit and record the basis. If timing cannot be resolved, escalate rather than assuming there is no inspection due."
      ],
      "example": "For a site using EPA Part 4.2.2, 0.12 in followed by 0.15 in within the same 24-hour period totals 0.27 in. Determine when the cumulative amount first reached 0.25 in, not when the rain finally stopped.",
      "next": "Enter the confirmed interval and trigger timestamp in the inspection calendar; keep the readings with the report.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/inspector-and-signatory/",
      "slug": "inspector-and-signatory",
      "title": "Who can inspect the site and who can sign the report?",
      "answer": "Field competence and signature authority are two different checks. Under the EPA CGP the operator must use a qualified inspector, while the report signature must meet Appendix G. A training certificate alone is not a delegation of signature authority.",
      "steps": [
        "Check the permit’s training and qualification standard before assigning the walk. For EPA coverage review Parts 4.1 and 6.3; retain evidence of the actual inspector’s qualifications.",
        "List everyone who performed the inspection and their title. Check the operator’s legally authorized signatory or the applicable written authorization, its scope and any filing requirements before routing the report.",
        "Have the authorized person review the findings, attachments and required certification. Preserve the signed version and record later corrections as revisions rather than overwriting the original."
      ],
      "example": "A trained subcontract inspector can record a failed check dam. Unless separately authorized under the permit, that inspector does not certify the report simply because the superintendent is away.",
      "next": "Place the training reference and current signing authorization in the site file, and identify a qualified backup before the next walk.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA permit documents, including coverage areas and Appendix G signatory rules",
          "url": "https://www.epa.gov/npdes/2022-construction-general-permit-cgp"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/unsafe-outfall-inspection/",
      "slug": "unsafe-outfall-inspection",
      "title": "How do I record an outfall that is unsafe to reach?",
      "answer": "Do not enter floodwater or an unstable bank to fill a box. Document the specific area you could not inspect and the reason; the limitation is not evidence that the outlet was dry, clear or compliant.",
      "steps": [
        "Name the map location, time and physical hazard (for example, an overtopped crossing). Record what was visible from a safe location, with its viewpoint, and what remained out of view.",
        "Inspect other areas that can safely be reached. EPA Parts 4.5 and 4.7 address unsafe areas and recording the reason and location. Check your permit for follow-up or notification instructions.",
        "Notify the site lead of unresolved conditions and assign a safe reassessment. If pollution is observed elsewhere, act on that evidence without waiting for access to the outfall."
      ],
      "example": "“09:15, OF-2: crossing overtopped. From upper road saw flow into culvert, not the outlet face. West ditch inspected; foreman to reevaluate access at noon.” Do not write “OF-2: no discharge.”",
      "next": "Add the access limitation to the report and keep the subsequent observation dated separately.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/sediment-observations/",
      "slug": "sediment-observations",
      "title": "How should I describe sediment at an outlet?",
      "answer": "Describe location, flow and appearance in words another inspector can verify. A visual observation can identify a problem but cannot establish a numeric turbidity value or prove the discharge meets a water-quality standard.",
      "steps": [
        "Name the outlet and receiving feature, whether water was flowing during the observation, and where you stood. Distinguish fresh deposits on pavement from suspended solids in moving water.",
        "Record color, visible solids, foam, sheen or odor as applicable, and visible conditions in the receiving feature attributable to the discharge. Note uncertainty about the source rather than assigning blame.",
        "Photograph the path and check upstream controls safely for bypass, overtopping or scour. Start the appropriate response and check separate sampling, dewatering or reporting duties; an image is not a meter reading."
      ],
      "example": "“At 10:20, tan flow leaving OF-1 formed a visible plume below the apron; deposited sand extended about 2 ft onto the apron. No meter reading taken.” Avoid “50 NTU” or “harmless silt” based on color.",
      "next": "Attach the images with time and map IDs, link any action taken, and schedule a check of the affected control.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/maintenance-or-corrective-action/",
      "slug": "maintenance-or-corrective-action",
      "title": "Is this routine maintenance or a corrective action?",
      "answer": "Decide from the condition, not how quickly the crew can fix it. Minor upkeep that keeps a functioning control effective differs from a missing control, major repair, replacement or another permit-defined trigger.",
      "steps": [
        "Record the damage, original design, evidence of discharge, and previous fixes to the same control at that location. Check the exact maintenance and corrective-action clauses.",
        "EPA Parts 2.1.4c and 5.1.1 address three or more of the same fixes at the same control and location. EPA’s inspection template counts the current occurrence. Record the repair history and use Part 5 corrective action unless you document in the inspection report why this specific recurrence should still be routine maintenance.",
        "For corrective action, take the required immediate steps, assign an owner and deadline, and record completion, verification and whether the SWPPP must change. Under EPA Part 5.4 the discovery and completion entries each have their own 24-hour documentation window; that is not the repair deadline."
      ],
      "example": "Removing ordinary sediment from an intact inlet filter can be upkeep. Discovering that a required inlet control was never installed is an EPA Part 5.1 trigger even if a crew can install it that afternoon.",
      "next": "Link the decision to the inspection and use the corrective-action register for findings that meet the trigger.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA inspection report and corrective action log templates",
          "url": "https://www.epa.gov/npdes/construction-general-permit-resources-tools-and-templates"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/temporary-stabilization-records/",
      "slug": "temporary-stabilization-records",
      "title": "What should be recorded when grading pauses?",
      "answer": "Track stabilization by disturbed area, not just by project. The key dates are when work stopped, when the expected pause became known, when protection began, and when it was installed. Work may continue elsewhere.",
      "steps": [
        "Mark the boundary on the current map. Record the last disturbance, anticipated restart and who confirmed the schedule. Check whether the area discharges to a sensitive water or has a shorter site-specific deadline.",
        "Under EPA Part 2.2.14 the trigger can arise when you know a temporary pause will last at least 14 days; do not wait until the fourteenth day to start. Initiation and completion are separate obligations with conditions and exceptions.",
        "Record cover installed, extent, date and any gaps. Revisit after weather to check for movement, bare soil or rills; document repairs and any change to the planned restart."
      ],
      "example": "On May 4 the grading lead parks work on the east bench until May 27. Record the bench boundary and that decision on May 4, not the date a delivery ticket arrives. Photograph the installed cover and inspect the downslope edge.",
      "next": "Record the condition and dates in the inspection report’s stabilization section; do not reduce inspections merely because seed was delivered.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/final-stabilization-and-termination/",
      "slug": "final-stabilization-and-termination",
      "title": "Does final stabilization automatically terminate coverage?",
      "answer": "No. Field evidence supports the applicable termination condition; it does not itself end authorization. Determine whether completion, operator transfer or replacement coverage is the actual basis, then follow the issuing authority’s notice process.",
      "steps": [
        "For the EPA completion route, check each disturbed area against Part 2.2.14c and Part 8.2.1. Vegetation is evaluated relative to local undisturbed cover, not simply by whether seed was applied. Check nonvegetative cover, exceptions and remaining exposed areas.",
        "Capture the required representative before-and-after photos with dates, locations and descriptions. Check removal of materials, waste, equipment, temporary controls and pollutant sources against the permit’s exceptions for items that remain.",
        "Have the authorized operator file the required notice. Continue compliance until termination is effective, save the submission and effective-date evidence, and calculate record retention from the correct permit milestone."
      ],
      "example": "A parking lot is paved but its disturbed verge still has bare rills. The paving receipt does not establish final stabilization of the verge. Keep the project in inspection rotation while the gap is addressed.",
      "next": "Use the inspection report to record which mapped areas meet stabilization criteria and which still need work. Keep the supporting photos; the report is not a notice of termination.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA instructions for notices of intent and termination",
          "url": "https://www.epa.gov/npdes/submitting-notice-intent-noi-notice-termination-not-or-low-erosivity-waiver-lew-under"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Field inspections",
      "url": "https://cleanpermit.com/guides/contractor-records-transfer/",
      "slug": "contractor-records-transfer",
      "title": "Which records should move when a contractor changes?",
      "answer": "Separate a crew handoff from a change of permit operator. Share the working file so controls are not missed, but do not treat handing over a binder, keys or a contract as transferring regulatory coverage.",
      "steps": [
        "Identify who will exercise operational control and over which mapped areas. Check the permit’s operator definition and coverage/notice requirements. Under EPA Part 8.2.2 the transfer route requires transfer of all areas for which the departing operator is responsible and the incoming operator obtaining coverage.",
        "Index the current SWPPP and map revisions, coverage documents, signed inspections, rainfall records, monitoring results, open and closed action logs, stabilization evidence, training and authorized signers. Include upcoming deadlines and safe access details.",
        "Use a dated inventory and acknowledgment: name departing and receiving custodians, list file versions, assign open actions and schedule the next inspection. Preserve the departing operator’s retained copies; the receiving party’s possession does not fulfill every retention duty."
      ],
      "example": "The grading subcontractor leaves Friday; the permit operator remains. Transfer the OF-2 access note and Monday inspection assignment without filing a termination just because the subcontract ended.",
      "next": "Print the open items from the corrective-action register. Have the receiving lead acknowledge each owner and due date, and verify agency authorization separately if the permit operator changes.",
      "sources": [
        {
          "name": "EPA 2022 Construction General Permit, as modified (Parts 2, 4–8)",
          "url": "https://www.epa.gov/system/files/documents/2025-04/2022-cgp-permit-as-modified.pdf"
        },
        {
          "name": "EPA instructions for notices of intent and termination",
          "url": "https://www.epa.gov/npdes/submitting-notice-intent-noi-notice-termination-not-or-low-erosivity-waiver-lew-under"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/tools/texas-stormwater-record-finder/",
      "slug": "texas-stormwater-record-finder",
      "title": "Texas construction stormwater lookup",
      "summary": "Find the official search for a permit number, operator, street or county. After searching, enter what you found to get the next verification step. No live records are retrieved here.",
      "example": "With only a road name, search TCEQ’s Construction Notice of Intent records by Street Name. If a nearby phase is terminated, check the current operator and phase rather than reusing its number.",
      "sample": {
        "kind": "Site name or street",
        "identifier": "Cedar Ridge Road",
        "observed": "Multiple possible matches"
      },
      "fields": [
        {
          "key": "kind",
          "label": "What do you have?",
          "type": "select",
          "options": [
            "Permit or waiver number",
            "Site number (RN)",
            "Customer number (CN)",
            "Site name or street",
            "Operator name",
            "City or county",
            "EPA-issued construction record"
          ]
        },
        {
          "key": "identifier",
          "label": "Number, name or location",
          "type": "text",
          "help": "Use a public identifier or distinctive part of the name. For a county, use its name without “County”."
        },
        {
          "key": "observed",
          "label": "What did the official search show? (optional)",
          "type": "select",
          "options": [
            "Not searched yet",
            "Matching active authorization",
            "Application only",
            "Terminated or expired authorization",
            "Multiple possible matches",
            "No matching record"
          ]
        }
      ],
      "sources": [
        {
          "name": "TCEQ · Search construction records by street, operator or county",
          "url": "https://www2.tceq.texas.gov/wq_dpa/index.cfm?fuseaction=home.permit_info_search"
        },
        {
          "name": "TCEQ · Water Quality General Permits Search",
          "url": "https://www2.tceq.texas.gov/wq_dpa/"
        },
        {
          "name": "TCEQ · Central Registry site search",
          "url": "https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.newSearch"
        },
        {
          "name": "TCEQ · Central Registry customer search",
          "url": "https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=cust.CustSearch"
        },
        {
          "name": "TCEQ · Construction permit and current site notice forms",
          "url": "https://www.tceq.texas.gov/permitting/stormwater/construction"
        },
        {
          "name": "EPA · Construction and industrial stormwater coverage areas",
          "url": "https://www.epa.gov/npdes/authorization-status-epas-construction-and-industrial-stormwater-programs"
        },
        {
          "name": "EPA · Search EPA-issued stormwater permit records",
          "url": "https://permitsearch.epa.gov/epermit-search/ui/search"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/tools/florida-cgp-filing-prep/",
      "slug": "florida-cgp-filing-prep",
      "title": "Florida construction NOI filing prep",
      "summary": "Turn a start, expiration or takeover date into a filing target. Check the pollution prevention plan, receiving system and separate approvals.",
      "example": "A new phase starts July 12 and drains to a county inlet. July 10 is the two-calendar-day filing target; an unfinished plan must be completed first.",
      "sample": {
        "filing": "New construction",
        "event": "2027-07-12",
        "plan": "Not ready or unknown",
        "outlet": "Into an MS4",
        "erp": "Issued for this phase"
      },
      "fields": [
        {
          "key": "filing",
          "label": "What filing are you preparing?",
          "type": "select",
          "options": [
            "New construction",
            "Renewal",
            "New operator taking control"
          ]
        },
        {
          "key": "event",
          "label": "Start, expiration or takeover date",
          "type": "date",
          "help": "Use the milestone that matches the filing above."
        },
        {
          "key": "plan",
          "label": "Is the SWPPP ready to implement?",
          "type": "select",
          "options": [
            "Ready",
            "Not ready or unknown"
          ]
        },
        {
          "key": "outlet",
          "label": "Where does runoff go?",
          "type": "select",
          "options": [
            "Into an MS4",
            "Direct to surface water only",
            "Unknown or mixed"
          ]
        },
        {
          "key": "erp",
          "label": "Individual ERP status",
          "type": "select",
          "options": [
            "Issued for this phase",
            "Not issued or unknown"
          ]
        }
      ],
      "sources": [
        {
          "name": "Florida DEP · Construction activity and filing instructions",
          "url": "https://floridadep.gov/water/stormwater/content/construction-activity"
        },
        {
          "name": "Florida DEP · Construction Generic Permit, parts 2 and 3 (PDF)",
          "url": "https://floridadep.gov/sites/default/files/Construction_Generic_Permit_0.pdf"
        },
        {
          "name": "Florida DEP · Construction NOI and instructions (PDF)",
          "url": "https://floridadep.gov/sites/default/files/62-621.300_4b.pdf"
        },
        {
          "name": "Florida DEP · Current permits, forms and portal guidance",
          "url": "https://floridadep.gov/water/stormwater/content/npdes-stormwater-permits-and-forms"
        },
        {
          "name": "Florida DEP · District Environmental Resource Permit contacts",
          "url": "https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/dep-district-erp-contacts"
        },
        {
          "name": "Florida DEP · MS4 permits and contacts",
          "url": "https://floridadep.gov/water/stormwater/content/municipal-separate-storm-sewer-systems-ms4"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/tools/california-smarts-packet-builder/",
      "slug": "california-smarts-packet-builder",
      "title": "California SMARTS packet builder",
      "summary": "Prepare the next handoff for a traditional project under the statewide 2022 construction permit. Match a technical or signing role to the actual filing status.",
      "example": "A QSP preparing termination gathers the final inspection, dated photos and final site map. The LRP or authorized DAR certifies the request; approval is a separate step.",
      "sample": {
        "role": "QSP · field practitioner",
        "stage": "Preparing termination"
      },
      "fields": [
        {
          "key": "role",
          "label": "Your part in the packet",
          "type": "select",
          "options": [
            "QSD · plan developer",
            "QSP · field practitioner",
            "LRP · responsible person",
            "DAR · authorized representative",
            "DEP · data entry person"
          ]
        },
        {
          "key": "stage",
          "label": "SMARTS record status",
          "type": "select",
          "options": [
            "Preparing an NOI",
            "Submitted; no WDID yet",
            "Active WDID",
            "Preparing termination",
            "Termination submitted; awaiting approval"
          ]
        }
      ],
      "sources": [
        {
          "name": "California Water Boards · SMARTS Notice of Intent guide (PDF)",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/docs/cgp_noi_help_guide.pdf"
        },
        {
          "name": "California Water Boards · Traditional project registration documents (PDF)",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/docs/2022-0057-dwq-with-attachments/cgp2022_att_d2.pdf"
        },
        {
          "name": "California Water Boards · 2022 permit termination guide (PDF)",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/docs/cgp_2022_not_help_guide.pdf"
        },
        {
          "name": "California Water Boards · SMARTS construction help guides",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/const_help_guides.html"
        },
        {
          "name": "California Water Boards · 2022 construction permit FAQ",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/cgp-faq.html"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/texas-find-construction-authorization/",
      "slug": "texas-find-construction-authorization",
      "title": "How do I look up a Texas construction stormwater record?",
      "answer": "Start with the site-specific authorization, if available. TXR150000 identifies the statewide permit. An RN identifies a site and a CN identifies a customer; neither is itself an authorization.",
      "steps": [
        "Read the posted notice or acknowledgment. Copy the number, exact operator name, physical location and project phase.",
        "For a number, use Water Quality General Permits Search. For a name or street, open Advanced Search, select Construction Notice of Intent (TXR15), authorization status ALL, and enter part of the street, site or permittee name. Narrow by city or county; repeat with Construction Waiver (TXRCW) or application status if appropriate.",
        "If the operator name changed, use Central Registry to recover the RN or CN and search again. For an EPA-issued construction permit, such as in Texas Indian country, use EPA Permit Lookup instead.",
        "Compare the returned construction record, location, operator, dates and status. Note whether it is an application or an authorization. Keep the dated record with the field notice."
      ],
      "example": "Two phases share “Cedar Ridge” in their name. The result for Phase I lists a different operator and entrance from the Phase II notice. Search the Phase II operator’s CN and match the RN rather than using the first result.",
      "next": "If no entry matches, ask for the signed notice and filing acknowledgment, if applicable. Under the small-site notice option there may be no NOI to find.",
      "sources": [
        {
          "name": "TCEQ · Water Quality General Permits Search",
          "url": "https://www2.tceq.texas.gov/wq_dpa/"
        },
        {
          "name": "TCEQ · Search construction records by street, operator or county",
          "url": "https://www2.tceq.texas.gov/wq_dpa/index.cfm?fuseaction=home.permit_info_search"
        },
        {
          "name": "TCEQ · Central Registry site search",
          "url": "https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.newSearch"
        },
        {
          "name": "TCEQ · Central Registry customer search",
          "url": "https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=cust.CustSearch"
        },
        {
          "name": "TCEQ · Small construction site notice steps",
          "url": "https://www.tceq.texas.gov/permitting/stormwater/construction/TXR15_site_notice_steps.html"
        },
        {
          "name": "EPA · Construction and industrial stormwater coverage areas",
          "url": "https://www.epa.gov/npdes/authorization-status-epas-construction-and-industrial-stormwater-programs"
        },
        {
          "name": "EPA · Search EPA-issued stormwater permit records",
          "url": "https://permitsearch.epa.gov/epermit-search/ui/search"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/texas-small-site-notice-or-noi/",
      "slug": "texas-small-site-notice-or-noi",
      "title": "Texas small site notice or Notice of Intent?",
      "answer": "Texas separates the site notice posted in the field from the Notice of Intent (NOI) filed with TCEQ. The ordinary small-site notice route does not require an NOI, but site size alone does not select the route.",
      "steps": [
        "Mark all proposed soil disturbance on a plan. Check plats, roads, utilities and other phases for a common plan of development or sale; compare disturbance, not parcel size.",
        "For the ordinary small-site route (at least one but less than five disturbed acres, including the common plan), review eligibility and prepare and implement the SWP3. Follow TCEQ’s posting instructions and send the signed notice to any receiving MS4 at least two days before construction.",
        "For five or more disturbed acres under the project or common plan, review primary versus secondary operational control. A primary operator’s large-site route includes an NOI and a posted notice; a secondary operator uses its own notice under the permit’s conditions."
      ],
      "example": "A builder disturbs 0.8 acre inside a subdivision with six acres of planned disturbance. Before choosing a form, compare the plat to the disturbance limits and identify who controls the work. Do not treat the lot as an isolated small site.",
      "next": "Confirm eligibility and any special erosion or waiver provisions in TXR150000 before selecting the form. Use the current notice for the route: 20963 for ordinary small sites, 20961 for large-site primary operators or 20962 for secondary operators. Keep the signed notice and MS4 delivery record with the SWP3.",
      "sources": [
        {
          "name": "TCEQ · Small construction site notice steps",
          "url": "https://www.tceq.texas.gov/permitting/stormwater/construction/TXR15_site_notice_steps.html"
        },
        {
          "name": "TCEQ · Large construction steps",
          "url": "https://www.tceq.texas.gov/permitting/stormwater/construction/TXR15_5_plus_steps.html"
        },
        {
          "name": "TCEQ · 2023 permit TXR150000 (PDF)",
          "url": "https://www.tceq.texas.gov/downloads/permitting/stormwater/general/construction/2023-cgp-txr150000.pdf"
        },
        {
          "name": "TCEQ · Construction permit and current site notice forms",
          "url": "https://www.tceq.texas.gov/permitting/stormwater/construction"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/texas-residential-lot-sale-handoff/",
      "slug": "texas-residential-lot-sale-handoff",
      "title": "What happens to Texas stormwater records when a lot is sold?",
      "answer": "A deed changes ownership, not the name on an NOI authorization. Separate an unfinished lot changing operators from a completed home being handed to its buyer. Keep common areas and remaining lots in view.",
      "steps": [
        "Map the sold area, unfinished disturbance and shared controls. List who directs work and maintains each inlet, fence and basin before and after the handoff.",
        "For a large-site primary operator transfer, read Part II.F.4 before scheduling closing: the new operator’s NOI is due at least ten days before transfer, and the original operator’s NOT within the ten days prior to its responsibility ending. Check conditions and copies to receiving MS4s; notice-only operators have a different notice replacement process.",
        "For an individual residential home, check the Part I definition of final stabilization. Document final stabilization or the specified temporary stabilization and homeowner notification route in the builder’s SWP3; use the state homeowner notice to identify remaining work."
      ],
      "example": "A developer sells two unfinished pads but still runs the shared basin on eight unsold lots. Map the pads and basin separately, identify who services their controls, and check the operator-change steps for the pads. The sale is not a reason to close coverage for the entire subdivision.",
      "next": "Record possession and control dates, incoming operator documentation, stabilization evidence and notices. Resolve uncertain boundaries with TCEQ before removing controls.",
      "sources": [
        {
          "name": "TCEQ · 2023 permit TXR150000 (PDF)",
          "url": "https://www.tceq.texas.gov/downloads/permitting/stormwater/general/construction/2023-cgp-txr150000.pdf"
        },
        {
          "name": "TCEQ · Notice to homeowner (PDF)",
          "url": "https://www.tceq.texas.gov/downloads/assistance/water/stormwater/cgp/cgp-homeowner-notice.pdf"
        },
        {
          "name": "TCEQ · Large construction steps",
          "url": "https://www.tceq.texas.gov/permitting/stormwater/construction/TXR15_5_plus_steps.html"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/florida-construction-cgp-versus-erp/",
      "slug": "florida-construction-cgp-versus-erp",
      "title": "What is the difference between a Florida CGP and an ERP?",
      "answer": "The construction generic permit (CGP) addresses stormwater discharges during construction. Environmental Resource Permitting (ERP) addresses a different question, such as authorization for the proposed stormwater system or work affecting wetlands. One approval does not establish the other.",
      "steps": [
        "For the CGP review, identify disturbance over the common plan, runoff routes, operator and proposed controls. Use the construction NOI and SWPPP, not the pond design approval, to document this track.",
        "For ERP, give the project location, plans, existing permit number and phase to the issuing DEP office, water management district or delegated local agency. Ask about the proposed footprint, system and any modification.",
        "Check city or county grading, connection and erosion-control requirements separately. Record each authority, number and conditions in its own file."
      ],
      "example": "A phase has an individual ERP for its pond. The CGP NOI allows an optional commencement notice for work already authorized by that individual ERP. Checking the box does not authorize an enlarged pond or establish CGP coverage by itself.",
      "next": "Before mobilization, compare the approved ERP phase limits with the disturbance map and confirm the CGP filing and local approvals independently.",
      "sources": [
        {
          "name": "Florida DEP · Construction NOI and instructions (PDF)",
          "url": "https://floridadep.gov/sites/default/files/62-621.300_4b.pdf"
        },
        {
          "name": "Florida DEP · District Environmental Resource Permit contacts",
          "url": "https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/dep-district-erp-contacts"
        },
        {
          "name": "Florida DEP · Construction activity and filing instructions",
          "url": "https://floridadep.gov/water/stormwater/content/construction-activity"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/florida-construction-noi-packet/",
      "slug": "florida-construction-noi-packet",
      "title": "What goes into a Florida construction NOI packet?",
      "answer": "Build the packet around the actual operator, the mapped work and a stormwater pollution prevention plan ready to implement. DEP’s NOI asks for the plan location; a draft plan is not ready to certify.",
      "steps": [
        "Collect the operator’s legal name, responsible authority, project contact, county, coordinates and water management district. Add the facility ID on renewal, and any relevant ERP number, issuer and phase.",
        "Record total disturbed acreage from start to finish, the common-plan context, construction dates, receiving waters, MS4 and dewatering details. Reconcile these with the SWPPP and map, and document the plan’s location.",
        "Use the current NOI and fee from DEP’s forms page. Prepare the portal PIN or signed-mail route. For a new project, submit a complete NOI and fee at least two calendar days before first disturbance. Save the acknowledgment and check its coverage term."
      ],
      "example": "For a July 12 clearing date the two-day planning target is July 10. If the SWPPP is still missing the discharge route on July 10, finish the plan and revisit scheduling rather than marking it ready or assuming a payment receipt authorizes work.",
      "next": "Keep submission and fee evidence, acknowledgment and posted copy. Check whether the receiving MS4 also needs copies.",
      "sources": [
        {
          "name": "Florida DEP · Current permits, forms and portal guidance",
          "url": "https://floridadep.gov/water/stormwater/content/npdes-stormwater-permits-and-forms"
        },
        {
          "name": "Florida DEP · Construction NOI and instructions (PDF)",
          "url": "https://floridadep.gov/sites/default/files/62-621.300_4b.pdf"
        },
        {
          "name": "Florida DEP · Construction Generic Permit, parts 2 and 3 (PDF)",
          "url": "https://floridadep.gov/sites/default/files/Construction_Generic_Permit_0.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/florida-ms4-and-local-discharge/",
      "slug": "florida-ms4-and-local-discharge",
      "title": "Who gets the Florida construction notice when runoff enters a drain?",
      "answer": "Trace the conveyance, not just the city boundary. A publicly operated ditch, inlet or pipe may be part of a municipal separate storm sewer system (MS4). The operator receiving runoff may be a county or district rather than the city.",
      "steps": [
        "Draw a route for each outfall, from the site to the first conveyance and the receiving surface water. Use drainage plans and confirm ownership with public works or the relevant district.",
        "Check the DEP MS4 contacts and ask the receiving operator for its delivery address. Permit Part 2.6.4 says NOI or acknowledgment within seven calendar days of receipt; DEP’s filing page asks for both. Send both and keep the delivery receipt.",
        "Ask separately about local erosion inspections, grading approval and permission to connect or pump. Evaluate construction dewatering against its own CGP conditions; a copied NOI is not approval to pump."
      ],
      "example": "A site inside city limits drains through a county roadside ditch before reaching a creek. The superintendent confirms ditch ownership with the county, records its MS4 contact, and asks the city separately about a grading inspection.",
      "next": "Put the confirmed route, receiving contacts, copies sent and receipt dates in the site file. If ownership is unresolved, document who is checking it rather than guessing.",
      "sources": [
        {
          "name": "Florida DEP · MS4 permits and contacts",
          "url": "https://floridadep.gov/water/stormwater/content/municipal-separate-storm-sewer-systems-ms4"
        },
        {
          "name": "Florida DEP · Construction activity and filing instructions",
          "url": "https://floridadep.gov/water/stormwater/content/construction-activity"
        },
        {
          "name": "Florida DEP · Construction Generic Permit, parts 2 and 3 (PDF)",
          "url": "https://floridadep.gov/sites/default/files/Construction_Generic_Permit_0.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/california-find-wdid-and-coverage-letter/",
      "slug": "california-find-wdid-and-coverage-letter",
      "title": "Where do I find a California WDID and proof of coverage?",
      "answer": "A SMARTS Application ID tracks an application. A Waste Discharge Identification number (WDID) is issued after the registration is processed. A saved draft, fee payment or submitted application is not the same record.",
      "steps": [
        "Use the SMARTS public report “Search for Owners/Operators or Facilities/Sites” or open the linked record in your SMARTS account. Match the owner, location and construction project.",
        "If there is only an Application ID, check the certified submission, fee and linked-user messages for unresolved items. Ask the Water Boards about the existing record rather than starting another application.",
        "Once a WDID is issued, use the Print tab for the Notice of Intent Receipt Letter. Compare the WDID, owner and location and check current status; keep the dated letter with the site records."
      ],
      "example": "A bid packet contains an Application ID and a fee receipt. The coordinator locates the submission but cannot find an issued WDID. They report “application submitted; WDID not verified,” not “active.”",
      "next": "Resolve discrepancies with the Water Boards. For construction subject to the statewide permit, do not use the draft or fee receipt to release work before the WDID is issued.",
      "sources": [
        {
          "name": "California Water Boards · SMARTS public reports",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/databases.html"
        },
        {
          "name": "California Water Boards · 2022 construction permit FAQ",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/cgp-faq.html"
        },
        {
          "name": "California Water Boards · Traditional project registration documents (PDF)",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/docs/2022-0057-dwq-with-attachments/cgp2022_att_d2.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/california-qsd-qsp-lrp-roles/",
      "slug": "california-qsd-qsp-lrp-roles",
      "title": "Who prepares, implements and signs a California stormwater packet?",
      "answer": "The Qualified SWPPP Developer (QSD) develops the plan. The Qualified SWPPP Practitioner (QSP) oversees its implementation in the field. A Legally Responsible Person (LRP) or properly authorized representative handles SMARTS certification. Technical qualifications and signing authority are separate.",
      "steps": [
        "Have the QSD reconcile the risk assessment, site map, SWPPP and applicable post-construction plans with the disturbance limits and drainage design.",
        "Identify the QSP responsible for implementation, inspections and monitoring. Keep a documented path for field changes and follow-up. A QSD can perform QSP duties; a QSP qualification alone does not qualify the practitioner as a QSD.",
        "Identify the LRP and any duly authorized representative (DAR) linked to the project. A data entry person can assemble uploads but cannot certify. Verify authority, then retain the certification and application reference."
      ],
      "example": "The consultant preparing the SWPPP has a QSD credential but only data entry access in SMARTS. They upload the plan and ask the linked LRP or authorized DAR to review and certify, while the QSP receives the current field copy.",
      "next": "Write down the name for each role, the current plan revision, where field records go and who will certify. Do not use another person’s sign-in.",
      "sources": [
        {
          "name": "California Water Boards · 2022 construction permit FAQ",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/cgp-faq.html"
        },
        {
          "name": "California Water Boards · SMARTS Notice of Intent guide (PDF)",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/docs/cgp_noi_help_guide.pdf"
        },
        {
          "name": "California Water Boards · SMARTS construction help guides",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/const_help_guides.html"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "State filing desks",
      "url": "https://cleanpermit.com/guides/california-request-construction-termination/",
      "slug": "california-request-construction-termination",
      "title": "How do I close a California construction stormwater record?",
      "answer": "Use a Notice of Termination (NOT) for the correct active WDID. A last day of grading, sale or submitted request does not by itself end the statewide permit obligations.",
      "steps": [
        "Check the applicable reason in the 2022 NOT guide: for completed or suspended construction, verify final stabilization. For a transfer or other basis, collect evidence specific to that reason; coverage does not simply transfer to a new owner.",
        "Open the active record and select File NOT. For a completed traditional project, assemble final map, QSP final inspection, photographs and applicable long-term maintenance and final post-construction plans. Check the permit for reason-specific attachments.",
        "Have the LRP or authorized DAR certify in SMARTS. Track Regional Water Board questions and approval. The discharger remains responsible for compliance and accrued annual fees until approval."
      ],
      "example": "A site is paved, but the final QSP inspection shows an unstabilized slope. Mark the slope on the map, document the corrective work and take follow-up photos. Do not use the paving invoice as proof that the whole site is stabilized.",
      "next": "Keep the submitted packet, board correspondence and approval showing the effective termination date. Confirm the status of the WDID before marking the record closed.",
      "sources": [
        {
          "name": "California Water Boards · 2022 permit termination guide (PDF)",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/docs/cgp_2022_not_help_guide.pdf"
        },
        {
          "name": "California Water Boards · SMARTS construction help guides",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/const_help_guides.html"
        },
        {
          "name": "California Water Boards · 2022 construction permit FAQ",
          "url": "https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/cgp-faq.html"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/tools/aquatic-impact-worksheet/",
      "slug": "aquatic-impact-worksheet",
      "title": "Aquatic impact quantity worksheet",
      "summary": "Separate temporary-only and permanent footprints on one mapped feature. Reconcile shared ground without counting it twice.",
      "sources": [
        {
          "name": "USACE Fort Worth District · Sample fill, wetland and road crossing drawings",
          "url": "https://www.swf.usace.army.mil/Missions/Regulatory/Permitting/Application-Submittal-Forms/"
        },
        {
          "name": "USACE · Regulatory forms and online filing instructions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Regulatory-Program-Forms/"
        }
      ],
      "example": "A mat route covers 1,200 ft² of Wetland W-2. Of that, 150 ft² will also lie beneath the 400 ft² permanent approach.",
      "fields": [
        {
          "key": "feature",
          "label": "Mapped feature or drawing ID",
          "type": "text",
          "help": "Use one resource and one plan revision per worksheet."
        },
        {
          "key": "unit",
          "label": "Units for all three footprint entries",
          "type": "select",
          "options": [
            "Square feet",
            "Acres"
          ]
        },
        {
          "key": "temporary",
          "label": "Temporary work footprint, including overlap",
          "type": "number",
          "help": "Area inside the mapped resource, not the whole work site. Use 0 only if confirmed absent."
        },
        {
          "key": "permanent",
          "label": "Permanent footprint",
          "type": "number",
          "help": "Include the permanent area even where temporary work occurs first."
        },
        {
          "key": "overlap",
          "label": "Area shared by both footprints",
          "type": "number",
          "help": "Use 0 for verified separate footprints; leave blank if not measured."
        },
        {
          "key": "depth",
          "label": "Uniform permanent fill thickness (feet), if known",
          "type": "number",
          "help": "Only use if fill of this thickness covers the entire permanent footprint. Not for excavation or variable slopes."
        }
      ],
      "sample": {
        "feature": "W-2 · approach revision B",
        "unit": "Square feet",
        "temporary": "1200",
        "permanent": "400",
        "overlap": "150",
        "depth": "1.5"
      }
    },
    {
      "kind": "tools",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/tools/wetland-application-packet-checker/",
      "slug": "wetland-application-packet-checker",
      "title": "Wetland permit application packet checker",
      "summary": "Identify the office to contact and prepare a cover note with the proposed work, exhibits, and questions the reviewer still needs answered.",
      "example": "For a Michigan road crossing, start with EGLE’s joint application. If mats are on sheet C-4 but missing from the impact table, identify that sheet and the missing quantity before handing the packet to the signer.",
      "fields": [
        {
          "key": "region",
          "label": "Where is the work?",
          "type": "select",
          "options": [
            "Michigan",
            "New Jersey",
            "Florida",
            "Another U.S. state or territory",
            "Tribal lands or uncertain boundary"
          ],
          "help": "For Tribal lands or an uncertain boundary, select that option rather than the surrounding state."
        },
        {
          "key": "location",
          "label": "Project and discharge location",
          "type": "text",
          "help": "Give a project label, county/state and nearest public crossing or coordinates."
        },
        {
          "key": "request",
          "label": "What are you preparing?",
          "type": "select",
          "options": [
            "Not sure — ask for scoping",
            "Corps standard individual permit application",
            "Corps nationwide permit notification",
            "State or joint application",
            "Review changes to an existing verification"
          ]
        },
        {
          "key": "applicant",
          "label": "Applicant organization and signer or agent role",
          "type": "text",
          "help": "A role or organization is enough for this draft; add official contact details in the agency form."
        },
        {
          "key": "office",
          "label": "Confirmed office and agency file number, if known",
          "type": "text"
        },
        {
          "key": "work",
          "label": "Purpose, work and aquatic impacts",
          "type": "textarea",
          "help": "Name the resource. Include dimensions, duration, material, and temporary versus permanent impacts; mark unmeasured quantities unknown."
        },
        {
          "key": "exhibits",
          "label": "Attachment names and revisions",
          "type": "textarea",
          "help": "List the actual files or sheets; for example: W-2 survey, sheet C-4 rev B, impact table dated June 4."
        },
        {
          "key": "map",
          "label": "Resource boundaries and site location",
          "type": "select",
          "options": [
            "Not checked",
            "Missing",
            "Draft",
            "Assembled"
          ]
        },
        {
          "key": "plans",
          "label": "Existing and proposed drawings",
          "type": "select",
          "options": [
            "Not checked",
            "Missing",
            "Draft",
            "Assembled"
          ]
        },
        {
          "key": "amounts",
          "label": "Impact and fill quantities",
          "type": "select",
          "options": [
            "Not checked",
            "Missing",
            "Draft",
            "Assembled"
          ]
        },
        {
          "key": "design",
          "label": "Purpose and design alternatives",
          "type": "select",
          "options": [
            "Not checked",
            "Missing",
            "Draft",
            "Assembled"
          ]
        },
        {
          "key": "method",
          "label": "Construction and restoration sequence",
          "type": "select",
          "options": [
            "Not checked",
            "Missing",
            "Draft",
            "Assembled"
          ]
        },
        {
          "key": "route",
          "label": "Agency forms and local instructions",
          "type": "select",
          "options": [
            "Not checked",
            "Missing",
            "Draft",
            "Assembled"
          ]
        }
      ],
      "sample": {
        "region": "Michigan",
        "location": "Mill Road crossing, Ingham County, MI (example)",
        "request": "State or joint application",
        "applicant": "Example road department; signer to confirm",
        "office": "",
        "work": "Restore road access at W-2. Place 400 ft² of permanent approach fill. Temporary mat limits are on C-4; temporary-only area and duration not yet confirmed.",
        "exhibits": "W-2 field survey; plan C-4 rev B; restoration sequence rev B.",
        "map": "Assembled",
        "plans": "Draft",
        "amounts": "Missing",
        "design": "Draft",
        "method": "Assembled",
        "route": "Not checked"
      },
      "sources": [
        {
          "name": "USACE · Find the regulatory office by address or map pin",
          "url": "https://regulatory.ops.usace.army.mil/offices/"
        },
        {
          "name": "EPA · Current Section 404 assumption status by state",
          "url": "https://www.epa.gov/cwa404g/tribal-and-state-section-404-assumption-efforts"
        },
        {
          "name": "USACE · Regulatory Request System (RRS)",
          "url": "https://rrs.usace.army.mil/rrs"
        },
        {
          "name": "USACE · Regulatory forms and online filing instructions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Regulatory-Program-Forms/"
        },
        {
          "name": "Michigan EGLE · Joint Permit Application in MiEnviro",
          "url": "https://www.michigan.gov/egle/about/organization/water-resources/joint-permit-application"
        },
        {
          "name": "NJDEP · Land use permit application process",
          "url": "https://dep.nj.gov/wlm/the-permit-process/"
        },
        {
          "name": "Florida DEP · State 404 program status",
          "url": "https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/state-404-program"
        },
        {
          "name": "EPA · Section 401 water quality certification",
          "url": "https://www.epa.gov/cwa-401/overview-cwa-section-401-certification"
        },
        {
          "name": "USACE Fort Worth District · Sample fill, wetland and road crossing drawings",
          "url": "https://www.swf.usace.army.mil/Missions/Regulatory/Permitting/Application-Submittal-Forms/"
        },
        {
          "name": "USACE · Nationwide permits, conditions and definitions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/tools/crossing-alternatives-comparison/",
      "slug": "crossing-alternatives-comparison",
      "title": "Crossing alternatives comparison",
      "summary": "Compare two designs on the same crossing. See which footprints shrink, which grow and which measurements are still missing.",
      "sources": [
        {
          "name": "EPA · Avoidance, minimization and compensation",
          "url": "https://www.epa.gov/cwa-404/types-mitigation-under-cwa-section-404-avoidance-minimization-and-compensatory-mitigation"
        },
        {
          "name": "USFWS Alaska · Culvert design and passage considerations (regional example)",
          "url": "https://www.fws.gov/alaska-culvert-design-guidelines"
        },
        {
          "name": "USACE Fort Worth District · Sample fill, wetland and road crossing drawings",
          "url": "https://www.swf.usace.army.mil/Missions/Regulatory/Permitting/Application-Submittal-Forms/"
        }
      ],
      "example": "A span reduces permanent wetland fill and reach disturbance, but its crane pad needs more temporary wetland access than a culvert.",
      "fields": [
        {
          "key": "a",
          "label": "Option A name",
          "type": "text"
        },
        {
          "key": "apermanent",
          "label": "Permanent wetland footprint (ft²) · A",
          "type": "number",
          "help": "Leave unknowns blank. Enter 0 only for a verified zero."
        },
        {
          "key": "atemporary",
          "label": "Temporary-only wetland footprint (ft²) · A",
          "type": "number",
          "help": "Leave unknowns blank. Enter 0 only for a verified zero."
        },
        {
          "key": "achannel",
          "label": "Affected stream reach (linear ft) · A",
          "type": "number",
          "help": "Leave unknowns blank. Enter 0 only for a verified zero."
        },
        {
          "key": "b",
          "label": "Option B name",
          "type": "text"
        },
        {
          "key": "bpermanent",
          "label": "Permanent wetland footprint (ft²) · B",
          "type": "number",
          "help": "Leave unknowns blank. Enter 0 only for a verified zero."
        },
        {
          "key": "btemporary",
          "label": "Temporary-only wetland footprint (ft²) · B",
          "type": "number",
          "help": "Leave unknowns blank. Enter 0 only for a verified zero."
        },
        {
          "key": "bchannel",
          "label": "Affected stream reach (linear ft) · B",
          "type": "number",
          "help": "Leave unknowns blank. Enter 0 only for a verified zero."
        }
      ],
      "sample": {
        "a": "Embedded culvert",
        "apermanent": "610",
        "atemporary": "420",
        "achannel": "85",
        "b": "Clear span",
        "bpermanent": "140",
        "btemporary": "720",
        "bchannel": "20"
      }
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/measure-aquatic-impact-quantities/",
      "slug": "measure-aquatic-impact-quantities",
      "title": "How do I measure impact where a temporary mat overlaps permanent fill?",
      "answer": "Measure both work footprints inside the aquatic resource, then measure their intersection. Keep the gross temporary area for construction planning, but subtract the overlap when reporting temporary-only area. A unique disturbance footprint is not necessarily a permanent loss.",
      "steps": [
        "Label each wetland or reach on the plan. Clip work polygons to those boundaries; do not use the entire construction easement.",
        "For each resource, record permanent area, gross temporary area and shared area. Unique area = permanent + (gross temporary − shared). Divide ft² by 43,560 for acres.",
        "List reach length in linear feet rather than adding it to acreage. Tabulate material placed and removed separately in cubic yards. Keep dimensions and plan revision with the figures."
      ],
      "example": "In W-2, 1,200 ft² of mats overlap 150 ft² of a 400 ft² permanent approach. Temporary-only is 1,050 ft² and unique disturbance is 1,450 ft², not 1,600 ft².",
      "next": "Mark the intersection on the plan and check the worksheet against the district’s requested impact categories.",
      "sources": [
        {
          "name": "USACE Fort Worth District · Sample fill, wetland and road crossing drawings",
          "url": "https://www.swf.usace.army.mil/Missions/Regulatory/Permitting/Application-Submittal-Forms/"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/desktop-delineation-or-jd/",
      "slug": "desktop-delineation-or-jd",
      "title": "What does a desktop wetland screen tell me that a delineation or JD does not?",
      "answer": "A desktop screen tells you where to investigate. A delineation maps resources using site evidence. A Corps approved jurisdictional determination (JD) addresses federal jurisdiction for the area it describes. None of these is permission to build.",
      "steps": [
        "Compare imagery, soils, terrain and inventory layers. Note coverage and image dates; a blank map polygon is not evidence of dry ground.",
        "Have a qualified practitioner document field boundaries and methods, including wetland vegetation, soils and hydrology under the appropriate regional methods. Retain data sheets, photographs and survey limits.",
        "Ask the district which product answers your question. A boundary concurrence addresses location, not jurisdiction. A preliminary JD is advisory and does not establish that a feature is nonjurisdictional; an approved JD is the formal determination."
      ],
      "example": "An inventory map is blank beside a proposed loading bay, but a low swale is visible on the grading survey. Put the swale in the field study area instead of labeling it upland.",
      "next": "Send the district the study boundary and the decision you need before commissioning a specific type of request.",
      "sources": [
        {
          "name": "USACE Charleston District · Delineations and jurisdiction",
          "url": "https://www.sac.usace.army.mil/Missions/Regulatory/Jurisdictional-Determinations-and-Delineations/"
        },
        {
          "name": "USACE Philadelphia District · Preliminary and approved determinations",
          "url": "https://www.nap.usace.army.mil/Missions/Regulatory/Jurisdictional-Determinations/"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/draw-wetland-permit-plans/",
      "slug": "draw-wetland-permit-plans",
      "title": "Which drawings let a reviewer reconstruct my wetland impact table?",
      "answer": "Use a vicinity map to locate the site, a scaled plan to show the footprint, and sections to show what changes vertically. Carry one feature ID from plan to section to quantity table.",
      "steps": [
        "Show site coordinates, access, waterbody names and a north arrow. On the site plan, label existing resource boundaries, their source and the date they were mapped.",
        "Distinguish existing and proposed features. Hatch temporary work separately from permanent fill; dimension what lies inside each resource and label section cut lines.",
        "At each cut, show existing ground or streambed, proposed grade, reference elevation and datum, material and thickness. Note scale, units and revision on each sheet; test readability at submission size."
      ],
      "example": "Table row W-3 lists 32 yd³ of rock. Section B–B shows the keyed toe below the bank surface; the plan ties B–B to the shaded 40 ft bank segment. A reviewer can now check what the estimate includes.",
      "next": "Have someone trace one table row back to its plan and section without the designer’s help.",
      "sources": [
        {
          "name": "USACE Fort Worth District · Sample fill, wetland and road crossing drawings",
          "url": "https://www.swf.usace.army.mil/Missions/Regulatory/Permitting/Application-Submittal-Forms/"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/section-404-and-401/",
      "slug": "section-404-and-401",
      "title": "Why does one crossing raise both Section 404 and Section 401 questions?",
      "answer": "Section 404 addresses discharges of dredged or fill material into waters of the United States. Section 401 addresses water quality certification for a federal license or permit for an activity that may result in a discharge. A certification is not a fill permit.",
      "steps": [
        "Describe where fill, bedding or rock would be placed, how much and for how long. Identify the federal license or permit under discussion rather than assuming every project has one.",
        "Ask which certifying authority serves the discharge location: generally the state or authorized Tribe, or EPA where neither has authority. Check whether an existing certification covers the proposed federal permit and on what terms.",
        "Track the certification decision or documented waiver separately from the federal action. Carry relevant conditions into the plans; do not treat filing a request as a waiver."
      ],
      "example": "A bridge plan adds rock at an abutment. The 404 discussion tracks placement and footprint; the 401 discussion might also address how turbidity from that work will be controlled.",
      "next": "Give both offices the same drawing revision and ask how they want the two records cross-referenced.",
      "sources": [
        {
          "name": "EPA · Section 404 permit program",
          "url": "https://www.epa.gov/cwa-404/permit-program-under-cwa-section-404"
        },
        {
          "name": "EPA · Section 401 water quality certification",
          "url": "https://www.epa.gov/cwa-401/overview-cwa-section-401-certification"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/nationwide-permit-and-pcn/",
      "slug": "nationwide-permit-and-pcn",
      "title": "Is a pre-construction notification the same thing as a nationwide permit?",
      "answer": "No. A nationwide permit (NWP) is a general permit for a described category of activities. A pre-construction notification (PCN) supplies project information for district review when the applicable terms or conditions require it. Filing the notice does not by itself authorize work.",
      "steps": [
        "For new work, start with the 2026 NWPs, effective March 15, 2026. Read the activity description, limits, definitions and general conditions together. A familiar permit number or an acreage figure alone does not answer the question.",
        "Check the district’s regional conditions, suspensions and certification conditions for the location. Trace each possible notice trigger to the actual text.",
        "For a required PCN, use General Condition 32(b) and the proposed NWP’s notification section. Supply a map, aquatic boundaries, direct and indirect effects, mitigation information as applicable and a description of the whole project. Follow the district’s joint process, RRS or ENG 6082 instructions. Do not send ENG 4345 just because the project involves fill."
      ],
      "example": "A trail crossing looks smaller than a neighboring project, but sits in a different district. The old project’s notification checklist cannot resolve the new district’s conditions.",
      "next": "Save the dated permit and regional conditions beside a short list of unresolved triggers for the district.",
      "sources": [
        {
          "name": "USACE · Nationwide permits, conditions and definitions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/"
        },
        {
          "name": "Federal Register · 2026 nationwide permit text and effective dates",
          "url": "https://www.federalregister.gov/documents/2026/01/08/2026-00121/reissuance-and-modification-of-nationwide-permits"
        },
        {
          "name": "USACE · Regulatory forms and online filing instructions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Regulatory-Program-Forms/"
        },
        {
          "name": "USACE · Find the regulatory office by address or map pin",
          "url": "https://regulatory.ops.usace.army.mil/offices/"
        },
        {
          "name": "EPA · Section 401 water quality certification",
          "url": "https://www.epa.gov/cwa-401/overview-cwa-section-401-certification"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/document-avoidance-minimization/",
      "slug": "document-avoidance-minimization",
      "title": "How can a design log show avoidance rather than just mitigation promises?",
      "answer": "Show where an option moves work out of a resource, then show how the remaining work becomes smaller or less harmful. Compensation addresses residual effects; it does not replace that comparison.",
      "steps": [
        "Describe the project purpose in terms of the need being met. Compare feasible locations, layouts and construction approaches on the same base map, including a no-build baseline where useful.",
        "Document both the reason for changing or rejecting an option and the evidence: site restrictions, logistics, cost assumptions, access or safety. Compare equivalent resource types, units and study limits.",
        "For the retained concept, tie each minimization measure to a revised measurement or a construction detail. Discuss residual effects and any compensation with the reviewing authority; do not subtract proposed credits from the physical footprint."
      ],
      "example": "Moving a lift station uphill avoids W-1 entirely. Narrowing its access into W-2 reduces the remaining footprint from 800 to 500 ft². Those are two different design decisions worth recording separately.",
      "next": "Attach before-and-after drawings to the alternatives log so that another reviewer can reproduce each change.",
      "sources": [
        {
          "name": "EPA · Avoidance, minimization and compensation",
          "url": "https://www.epa.gov/cwa-404/types-mitigation-under-cwa-section-404-avoidance-minimization-and-compensatory-mitigation"
        },
        {
          "name": "EPA · Section 404 permit program",
          "url": "https://www.epa.gov/cwa-404/permit-program-under-cwa-section-404"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/replace-stream-crossing-culvert/",
      "slug": "replace-stream-crossing-culvert",
      "title": "What should I survey before proposing a replacement culvert?",
      "answer": "Survey the crossing and the stream on both sides, not just the pipe diameter. Reviewers need to see the existing barrier, proposed bed profile and the temporary work needed to install the replacement.",
      "steps": [
        "Map inlet and outlet, bed elevations, banks, substrate, visible scour, debris and outlet drop. Record photo direction, date, datum and where each measurement was taken.",
        "Put the existing and proposed inverts and streambed on the same profile. Compare an embedded or open-bottom structure and a span where practicable; ask the design team to check passage, hydraulics and sediment continuity.",
        "Draw the installation stages: isolation or diversion, access pads, excavation and spoil destination, permanent protection and restoration. Show affected lengths and areas for each stage."
      ],
      "example": "An outlet sits above a downstream scour pool. Replacing the barrel at the same elevations could retain the passage barrier. A profile extending beyond the pool gives the designer a reference for comparing options.",
      "next": "Take the survey and options to the reviewing office and fisheries staff. Use the Alaska passage guide as a design example, not a nationwide sizing rule. Replacement in place does not establish eligibility as maintenance.",
      "sources": [
        {
          "name": "USFWS Alaska · Culvert design and passage considerations (regional example)",
          "url": "https://www.fws.gov/alaska-culvert-design-guidelines"
        },
        {
          "name": "USACE Fort Worth District · Sample fill, wetland and road crossing drawings",
          "url": "https://www.swf.usace.army.mil/Missions/Regulatory/Permitting/Application-Submittal-Forms/"
        },
        {
          "name": "USACE · Nationwide permits, conditions and definitions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/state-versus-federal-wetland-review/",
      "slug": "state-versus-federal-wetland-review",
      "title": "Where do I send a wetland permit application: the Corps or the state?",
      "answer": "Start with the discharge location, not the applicant’s address. The Corps generally handles federal fill permits; Michigan and New Jersey handle Section 404 for assumed waters, but the Corps retains others. Independent wetland, shoreline or buffer approvals may apply even where no federal fill permit is needed.",
      "steps": [
        "Locate the work, access and discharge points. Ask the relevant offices about independent wetland and buffer rules, floodplain or shoreland review, and whether local approvals are separate.",
        "Pin the proposed discharge on the Corps regulatory office map. In Michigan start with EGLE’s joint application in MiEnviro; in New Jersey ask NJDEP Land Resource Protection which checklist and which waters apply. In Florida the federal Section 404 inquiry currently goes to the Corps; the state ERP is separate.",
        "Record the office, named water, plan revision, application route and reference number for each review. For a federal permit, check the Section 401 certification separately. Ask what the joint process forwards rather than filing the same exhibits twice."
      ],
      "example": "A federal letter addresses the wetland in a proposed driveway footprint. It says nothing about the equipment turnaround in a locally regulated buffer. Keep the turnaround on the local review map.",
      "next": "Request written confirmation of each office’s scope and record which parts of the plan its response actually covers.",
      "sources": [
        {
          "name": "USACE · Find the regulatory office by address or map pin",
          "url": "https://regulatory.ops.usace.army.mil/offices/"
        },
        {
          "name": "EPA · Current Section 404 assumption status by state",
          "url": "https://www.epa.gov/cwa404g/tribal-and-state-section-404-assumption-efforts"
        },
        {
          "name": "Michigan EGLE · Joint Permit Application in MiEnviro",
          "url": "https://www.michigan.gov/egle/about/organization/water-resources/joint-permit-application"
        },
        {
          "name": "NJDEP · Land use permit application process",
          "url": "https://dep.nj.gov/wlm/the-permit-process/"
        },
        {
          "name": "Florida DEP · State 404 program status",
          "url": "https://floridadep.gov/water/submerged-lands-environmental-resources-coordination/content/state-404-program"
        },
        {
          "name": "EPA · Section 401 water quality certification",
          "url": "https://www.epa.gov/cwa-401/overview-cwa-section-401-certification"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Wetlands & crossings",
      "url": "https://cleanpermit.com/guides/read-verification-conditions-expiration/",
      "slug": "read-verification-conditions-expiration",
      "title": "Can I use an older verification letter after the design or schedule changes?",
      "answer": "Read the letter with its referenced plan, permit edition and conditions. The verified activity and relevant dates matter; the presence of a letter or a date on an old plan does not settle whether revised work is covered.",
      "steps": [
        "Match project number, location, permittee, quantities, footprint and plan revision to the planned work. Mark any changed feature, access route or construction method.",
        "Make a condition register: note the action, responsible person, evidence and due date for work windows, notices, inspections, restoration, monitoring and closeout where specified.",
        "Separate completion or expiration dates from reporting deadlines. If timing slips, the NWP changes, or the design differs, send the district the dated record and revised schedule before relying on the letter. Do not assume an extension or transition period applies."
      ],
      "example": "A verification references a 24 ft approach, but the bid set widens it to 30 ft and moves the mat route. Highlight both changes and ask for written direction before mobilizing.",
      "next": "Keep the agency response, referenced drawing set and condition register together in the field copy.",
      "sources": [
        {
          "name": "USACE · Nationwide permits, conditions and definitions",
          "url": "https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/"
        },
        {
          "name": "EPA · Section 401 water quality certification",
          "url": "https://www.epa.gov/cwa-401/overview-cwa-section-401-certification"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/tools/pte-workbook/",
      "slug": "pte-workbook",
      "sources": [
        {
          "name": "40 CFR § 70.2 — Potential to emit and major source",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.2"
        },
        {
          "name": "EPA — Practical enforceability of permit limits (1995 guidance)",
          "url": "https://www.epa.gov/sites/default/files/2015-07/documents/potoem.pdf"
        },
        {
          "name": "EPA — Choosing and interpreting emission factors",
          "url": "https://www.epa.gov/air-emissions-factors-and-quantification/basic-information-air-emissions-factors-and-quantification"
        }
      ],
      "title": "Potential-to-emit workbook",
      "summary": "Build a one-pollutant worksheet from maximum hourly rates. Compare full-year capacity with a documented hours scenario, unit by unit.",
      "example": "At 1.5 lb/h, a curing oven emits 6.57 short tons at 8,760 hours, or 2.25 short tons at a documented 3,000-hour cap.",
      "fields": [
        {
          "key": "pollutant",
          "label": "Pollutant (use one per worksheet)",
          "type": "text"
        },
        {
          "key": "boundary",
          "label": "Which units and emission points are included?",
          "type": "text",
          "help": "Count independent emissions once. Do not list both a stack and the same emissions at its inlet."
        },
        {
          "key": "sheet",
          "label": "Maximum emission rates and hours",
          "type": "textarea",
          "help": "One line per unit: unit ID | rate | lb/h or kg/h | hours/year | rate source and control basis | hours basis. Enter “full year” for 8760 hours; for fewer hours use “limit: condition; averaging period” for a restriction assumed enforceable. Do not enter expected shifts."
        }
      ],
      "sample": {
        "pollutant": "VOC",
        "boundary": "Oven 1 and independent flash-off station; no control credit.",
        "sheet": "OV-1 | 1.5 | lb/h | 3000 | Rated feed × maximum VOC content; uncontrolled | limit: Illustrative permit condition A4; rolling 12 months\nFL-1 | 0.4 | lb/h | 8760 | Maximum material balance; uncontrolled | full year"
      }
    },
    {
      "kind": "tools",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/tools/hap-inventory/",
      "slug": "hap-inventory",
      "sources": [
        {
          "name": "EPA — Hazardous air pollutant list with modifications",
          "url": "https://www.epa.gov/haps/initial-list-hazardous-air-pollutants-modifications"
        },
        {
          "name": "40 CFR § 70.2 — Potential to emit and major source",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.2"
        }
      ],
      "title": "Hazardous air pollutant inventory",
      "summary": "Combine annual emitted mass by chemical identity, flag repeated emission streams, and identify the largest individual total.",
      "example": "Toluene emitted by a booth (800 lb/yr) and an independent wash station (0.3 short ton/yr) adds to 1,400 lb/yr. Two copies of the booth entry need reconciliation, not addition.",
      "fields": [
        {
          "key": "basis",
          "label": "Inventory basis",
          "type": "select",
          "options": [
            "Estimated actual emissions",
            "Potential emissions scenario"
          ]
        },
        {
          "key": "scope",
          "label": "Source boundary and annual period",
          "type": "text"
        },
        {
          "key": "sheet",
          "label": "Annual HAP emissions",
          "type": "textarea",
          "help": "One line per independent stream and HAP: stream ID | HAP name | CAS number or group: listed name | amount | lb/yr or short ton/yr. Use emitted mass, not total product purchased. Reuse the same stream ID for alternate estimates of the same emissions."
        }
      ],
      "sample": {
        "basis": "Estimated actual emissions",
        "scope": "Fabrication building, calendar year 2025",
        "sheet": "Booth | Toluene | 108-88-3 | 800 | lb/yr\nWash | Methylbenzene | 108-88-3 | 0.3 | short ton/yr\nWash | Methanol | 67-56-1 | 240 | lb/yr"
      }
    },
    {
      "kind": "tools",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/tools/equipment-change-intake/",
      "slug": "equipment-change-intake",
      "sources": [
        {
          "name": "EPA — New Source Review: major and minor construction permits",
          "url": "https://www.epa.gov/nsr/new-source-review-basics"
        },
        {
          "name": "EPA — Which sources need Title V operating permits?",
          "url": "https://www.epa.gov/title-v-operating-permits/basic-information-about-operating-permits"
        },
        {
          "name": "40 CFR § 70.7 — Operating permit revisions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.7"
        },
        {
          "name": "EPA — Minor New Source Review",
          "url": "https://www.epa.gov/nsr/minor-nsr-basic-information"
        }
      ],
      "title": "Air permit equipment change worksheet",
      "summary": "Compare existing and proposed equipment. Get separate questions for the air construction permit decision and the operating permit file.",
      "example": "Replacing a 70-gal/h booth with a 95-gal/h booth adds 25 gal/h of nameplate capacity. That is not a 25 lb/h emissions increase; the reviewer also needs composition, capture and operating data.",
      "fields": [
        {
          "key": "unit",
          "label": "Unit ID and project location",
          "type": "text"
        },
        {
          "key": "change",
          "label": "Change type",
          "type": "select",
          "options": [
            "New unit",
            "Replacement",
            "Modify existing unit",
            "Change fuel or material only (same equipment rating)"
          ]
        },
        {
          "key": "family",
          "label": "Equipment category",
          "type": "select",
          "options": [
            "Combustion engine or generator",
            "Coating or solvent process",
            "Other process equipment"
          ]
        },
        {
          "key": "metric",
          "label": "Capacity basis (same basis before and after)",
          "type": "select",
          "options": [
            "MMBtu/h heat input",
            "hp engine output",
            "kW electrical output",
            "gal/h material throughput",
            "lb/h material throughput"
          ]
        },
        {
          "key": "before",
          "label": "Existing nameplate capacity",
          "type": "number",
          "help": "Enter 0 only for a new unit."
        },
        {
          "key": "after",
          "label": "Proposed nameplate capacity",
          "type": "number"
        },
        {
          "key": "hours",
          "label": "Expected annual operating hours",
          "type": "number",
          "help": "For planning only; an expected schedule is not an enforceable limit."
        },
        {
          "key": "operatingStatus",
          "label": "What do the site’s operating permit records show?",
          "type": "select",
          "options": [
            "Current Title V permit",
            "No Title V permit on file",
            "Not yet verified"
          ]
        },
        {
          "key": "permit",
          "label": "Existing air permits or rules to check",
          "type": "text",
          "help": "List relevant conditions, or enter “not yet identified”."
        },
        {
          "key": "details",
          "label": "Basis and open questions",
          "type": "textarea",
          "help": "Identify the source of the ratings, fuel/materials, controls, and any other affected units."
        }
      ],
      "sample": {
        "unit": "Coating bay CB-2, east fabrication hall",
        "change": "Replacement",
        "family": "Coating or solvent process",
        "metric": "gal/h material throughput",
        "before": "70",
        "after": "95",
        "hours": "2400",
        "operatingStatus": "Current Title V permit",
        "permit": "Operating permit, coating table; construction file under review",
        "details": "Vendor spray delivery ratings. Solventborne coating, same booth filters; old booth removal timing not confirmed."
      }
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/pte-vs-actual/",
      "slug": "pte-vs-actual",
      "title": "Potential to emit versus actual emissions",
      "answer": "Actual emissions describe what happened during a stated period. Potential to emit (PTE) asks how much the source could emit under its physical and operational design, considering only limits that qualify under the applicable program. A quiet year changes the first number, not necessarily the second.",
      "steps": [
        "Draw a boundary around the units contributing to this pollutant. Identify shared exhausts so the same release is not counted at both the process and the stack.",
        "For actuals, match production, fuel or material records to the period and use emission data representative of those operations. Explain missing records rather than treating them as zero.",
        "For PTE, assemble maximum feasible throughput, emitting modes and hours. Flag any bottleneck, control or permit limit separately with evidence of its effect and enforceability."
      ],
      "example": "A line emitted VOC at an estimated 2 lb/h for 900 recorded hours: 1,800 lb, or 0.9 short ton actual. Its maximum rate is 3 lb/h. With no qualifying restriction and continuous capacity, 3 × 8,760 ÷ 2,000 gives 13.14 short tons/yr, not 0.9.",
      "next": "Put the records-based inventory and the maximum-capacity worksheet side by side; label the basis of every rate.",
      "sources": [
        {
          "name": "40 CFR § 70.2 — Potential to emit and major source",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.2"
        },
        {
          "name": "EPA — Minor NSR application worked examples (tribal program)",
          "url": "https://www.epa.gov/system/files/documents/2025-09/completing_a_minornsr_permitapplicationcorrectly_03-10-2025.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/pounds-per-hour-to-tons-per-year/",
      "slug": "pounds-per-hour-to-tons-per-year",
      "title": "Convert pounds per hour to short tons per year",
      "answer": "Multiply an emission rate in pounds per hour by operating hours per year, then divide by 2,000 pounds per US short ton. The conversion is simple; choosing a rate and time period that belong together is the important part.",
      "steps": [
        "Read the numerator and denominator on the source sheet. A lb/h rate can be annualized directly; lb/MMBtu needs heat input in MMBtu/h first. A short ton is not a metric tonne.",
        "Choose hours for the question: meter records for actuals, or maximum operating hours supported by the design and qualifying restrictions for a potential scenario.",
        "For a changing rate, multiply each operating mode by its own hours before summing. Verify the modes do not overlap and retain unrounded values until the total."
      ],
      "example": "A dryer ran 300 h at 4 lb/h and 900 h at 1 lb/h. Its estimate is (1,200 + 900) ÷ 2,000 = 1.05 short tons for the period. Using the 4 lb/h rate for every hour instead would answer a different question.",
      "next": "Record the rate source and hours source next to each multiplication so a reviewer can reproduce it.",
      "sources": [
        {
          "name": "EPA — Minor NSR application worked examples (tribal program)",
          "url": "https://www.epa.gov/system/files/documents/2025-09/completing_a_minornsr_permitapplicationcorrectly_03-10-2025.pdf"
        },
        {
          "name": "EPA — Choosing and interpreting emission factors",
          "url": "https://www.epa.gov/air-emissions-factors-and-quantification/basic-information-air-emissions-factors-and-quantification"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/choose-an-emission-factor/",
      "slug": "choose-an-emission-factor",
      "title": "Choose an emission factor that fits the process",
      "answer": "An emission factor relates pollutant mass to an activity such as heat input or material processed. EPA notes that AP-42 factors generally describe averages across sources, not guaranteed maximums, permit limits, or proof of compliance.",
      "steps": [
        "Start with the permit or inventory instructions: they may specify a test, material balance, or factor. Compare any candidate factor with source-specific performance data.",
        "Match the pollutant, process, fuel, operating load, measurement boundary, and control status. Record the table, version, units and limitations. Do not apply a removal percentage to a factor already measured after control.",
        "Cancel the activity units explicitly. If a permit decision depends on a maximum rather than an average, ask what maximum-rate evidence is acceptable."
      ],
      "example": "An illustrative uncontrolled factor of 0.08 lb/MMBtu times 15 MMBtu/h yields 1.2 lb/h. Multiplying that factor by 15 cubic feet/h would leave mismatched units; obtain the fuel heating value first. The example factor is not a recommended value.",
      "next": "Attach the exact factor entry and the activity data, not just a link to the AP-42 homepage.",
      "sources": [
        {
          "name": "EPA — Choosing and interpreting emission factors",
          "url": "https://www.epa.gov/air-emissions-factors-and-quantification/basic-information-air-emissions-factors-and-quantification"
        },
        {
          "name": "EPA — Minor NSR application worked examples (tribal program)",
          "url": "https://www.epa.gov/system/files/documents/2025-09/completing_a_minornsr_permitapplicationcorrectly_03-10-2025.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/enforceable-hours-limits/",
      "slug": "enforceable-hours-limits",
      "title": "When can an hours limit change a PTE estimate?",
      "answer": "A production forecast, staffing plan, or verbal promise is not an enforceable operating restriction. Under Part 70, a restriction counted as part of design must meet the definition in § 70.2. Practical enforceability also depends on whether compliance can be determined from the terms and records.",
      "steps": [
        "Find the effective instrument and quote the condition, unit IDs, covered operating modes, hours cap, and averaging period. A calendar-year limit is not interchangeable with a rolling 12-month limit.",
        "Check the meter or log specified by the condition, how readings are reconciled, and how shared caps work. Identify who calculates the total and how missing readings are handled.",
        "Show both the unrestricted calculation and the condition-based alternative. A proposed cap stays a scenario until effective and accepted for the relevant program."
      ],
      "example": "A hypothetical condition caps two pumps together at 2,000 pump-hours per rolling 12 months. At equal emission rates of 1.8 lb/h, the cap corresponds to 1.8 short tons/yr combined, not 1.8 tons for each. One hour with both running uses two pump-hours under that wording.",
      "next": "Have the reviewing authority confirm how the condition counts concurrent operation before using it to limit source-wide PTE.",
      "sources": [
        {
          "name": "40 CFR § 70.2 — Potential to emit and major source",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.2"
        },
        {
          "name": "EPA — Practical enforceability of permit limits (1995 guidance)",
          "url": "https://www.epa.gov/sites/default/files/2015-07/documents/potoem.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/aggregate-hazardous-air-pollutants/",
      "slug": "aggregate-hazardous-air-pollutants",
      "title": "Aggregate hazardous air pollutants without double counting",
      "answer": "Track each listed hazardous air pollutant (HAP) across independent releases, then combine nonoverlapping HAP totals. Under the usual federal section 112 major-source definition, 10 short tons/yr of one HAP and 25 short tons/yr combined are separate, inclusive screens: either can matter. Neither is an exemption test.",
      "steps": [
        "Agree on the source boundary, inventory period and emissions basis before adding. Review common control and contiguous source areas, applicable special aggregation rules, and any lower pollutant-specific threshold.",
        "Match chemical names and synonyms to the EPA list and its modifications. Use CAS numbers where available and follow category definitions where there is no single CAS; identify overlap between group totals and individually reported constituents.",
        "Use emitted mass by stream rather than purchased mass unless the documented balance supports that assumption. Reconcile alternate estimates for the same release rather than adding both."
      ],
      "example": "A booth emits 6,000 lb/yr of toluene and a separate cleaning line emits 2,000 lb/yr of methylbenzene (the same substance). That is 4 short tons/yr of toluene. A further 1,000 lb/yr of methanol makes 4.5 short tons/yr combined; a second estimate from the booth stack adds nothing unless it covers a distinct release.",
      "next": "Give the reviewer a species-by-stream table with identifiers, listed-group definitions, and separate actual and potential inventories.",
      "sources": [
        {
          "name": "EPA — Hazardous air pollutant list with modifications",
          "url": "https://www.epa.gov/haps/initial-list-hazardous-air-pollutants-modifications"
        },
        {
          "name": "40 CFR § 70.2 — Potential to emit and major source",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.2"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/title-v-and-new-equipment/",
      "slug": "title-v-and-new-equipment",
      "title": "Air construction permit vs. operating permit: adding equipment",
      "answer": "A construction permit answers “what may we build or change?” It can also set limits that last through operation. A Title V operating permit brings the site’s applicable requirements together and spells out how the operator demonstrates compliance. Having one does not authorize a project under the other; not every facility needs Title V.",
      "steps": [
        "Before installation: identify the new unit, connected equipment and any overlap with a retiring unit. Give the air agency the process diagram, maximum rates by pollutant and first planned construction activity.",
        "Ask which construction approval or documented exemption applies, and which work must wait. Read any issued approval for requirements at startup—such as a notice, a control check or a test deadline—not just permission to install.",
        "For the operating file, mark the pages affected: equipment table, emission limits and monitoring terms. Ask the issuing agency whether and when a notice, amendment or modification is required. If the site has no Title V permit, ask whether the changed source now needs one or a state operating permit."
      ],
      "example": "An additional dryer shares a stack with the original dryer. The stack ID has not changed, but the project may increase heat input and two dryers could run together. A reviewer needs the combined capacity and permit wording, not just the unchanged equipment list.",
      "next": "Ask the authority which steps must occur before construction, startup and operation; put each response on the project schedule.",
      "sources": [
        {
          "name": "EPA — New Source Review: major and minor construction permits",
          "url": "https://www.epa.gov/nsr/new-source-review-basics"
        },
        {
          "name": "EPA — Which sources need Title V operating permits?",
          "url": "https://www.epa.gov/title-v-operating-permits/basic-information-about-operating-permits"
        },
        {
          "name": "40 CFR § 70.7 — Operating permit revisions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-70/section-70.7"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/emergency-generator-data/",
      "slug": "emergency-generator-data",
      "title": "What data should an emergency generator file contain?",
      "answer": "The “standby” label on a generator describes a product, not necessarily its regulatory use. A reviewer needs the engine configuration, dates, location, applicable source category and actual dispatch purposes to evaluate stationary engine requirements.",
      "steps": [
        "Photograph the engine and generator nameplates. Distinguish mechanical brake horsepower from electrical kW; obtain the engine family, model year, build and installation dates, fuel, ignition type and certification documents.",
        "Separate outage response, maintenance/testing and any other dispatch. Save dispatch requests, dates, start/end meter readings and reasons; check applicable meter and record requirements. Do not assume a testing allowance covers paid dispatch or all non-emergency use.",
        "Check applicable provisions of Part 63 Subpart ZZZZ and Part 60 engine standards, local construction rules, and existing permit terms. Match emission rates to the actual engine and load, not a similarly sized generator."
      ],
      "example": "A log shows 7.5 h during a utility outage, 4 h of scheduled tests and 2 h shaving peak demand. The meter change is 13.5 h, but presenting it all as “emergency hours” would conceal a use the reviewer must assess separately.",
      "next": "Send the nameplate photos, engine spec sheet and purpose-coded hour log together; flag proposed dispatch arrangements before agreeing to them.",
      "sources": [
        {
          "name": "40 CFR Part 63, Subpart ZZZZ — Stationary engines",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-63/subpart-ZZZZ"
        },
        {
          "name": "EPA — Minor New Source Review",
          "url": "https://www.epa.gov/nsr/minor-nsr-basic-information"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/coating-solvent-substitution/",
      "slug": "coating-solvent-substitution",
      "title": "Evaluate a coating or solvent substitution",
      "answer": "A lower VOC label does not establish a lower HAP rate or compliance with the existing permit. Compare the old and new systems as applied, including thinning, hardeners and cleanup, on the same production basis.",
      "steps": [
        "Obtain dated safety and technical data sheets plus supplier composition or test data. Check whether each value is as supplied, as mixed, per gallon of material, or on a less-water/exempt-compounds basis.",
        "For an ingredient mass balance, multiply gallons by product density and ingredient weight fraction. Identify retained, recovered or destroyed material only with support; assess VOC and each listed HAP separately. A Method 24 result is not HAP speciation.",
        "Check the application rate required for equivalent production, mix ratios, cleanup frequency, approved materials, control performance and permit notification or approval conditions."
      ],
      "example": "At 100 gal/month, 8 lb/gal and 5% toluene by weight, the old mix contains 40 lb/month of toluene. A substitute at 120 gal/month, 9 lb/gal and 2% contains 21.6 lb/month. Those are input masses, and estimates of emitted mass only if the toluene all evaporates with no recovery or control.",
      "next": "For a substitution on unchanged equipment, enter the same nameplate rating on both sides of the change worksheet. Attach the as-applied VOC and HAP comparison; zero capacity change does not mean zero emissions change.",
      "sources": [
        {
          "name": "EPA — Method 24 for surface coatings",
          "url": "https://www.epa.gov/emc/method-24-surface-coatings"
        },
        {
          "name": "EPA — Hazardous air pollutant list with modifications",
          "url": "https://www.epa.gov/haps/initial-list-hazardous-air-pollutants-modifications"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Air & equipment",
      "url": "https://cleanpermit.com/guides/exemption-permit-by-rule-or-individual-permit/",
      "slug": "exemption-permit-by-rule-or-individual-permit",
      "title": "Exemption, permit by rule, or individual permit?",
      "answer": "These routes depend on the jurisdiction and its approved program. An exemption can relieve a specified permitting obligation under stated conditions. A permit by rule can authorize a defined class subject to its terms; it is not a universal self-approval. An individual permit sets project-specific conditions through agency review.",
      "steps": [
        "Identify the authority for the site, including whether a state, local, tribal or federal program applies. Retrieve the current rule text, local forms and existing site permits.",
        "Test each candidate route clause by clause: equipment category, site and project emissions, location exclusions, capacity, control requirements and any restrictions on linked projects. Record the authority and evidence for each clause.",
        "Check notices, registration, written coverage or approval, fees, timing, monitoring and record retention. An exception from one construction permit requirement does not remove an applicable equipment standard or operating permit condition."
      ],
      "example": "A rule written for one coating booth might include both a material-use ceiling and a restriction on nearby receptors. Meeting the gallons limit answers only one clause. If the site plan cannot establish the required distance, mark it unresolved rather than selecting the rule by default.",
      "next": "Where any criterion is unresolved, take the clause matrix and site plan to the authority and ask what route and timing it requires before work starts.",
      "sources": [
        {
          "name": "EPA — Minor New Source Review",
          "url": "https://www.epa.gov/nsr/minor-nsr-basic-information"
        },
        {
          "name": "EPA — Minor NSR application worked examples (tribal program)",
          "url": "https://www.epa.gov/system/files/documents/2025-09/completing_a_minornsr_permitapplicationcorrectly_03-10-2025.pdf"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/tools/industrial-no-exposure-walkthrough/",
      "slug": "industrial-no-exposure-walkthrough",
      "title": "Industrial stormwater no exposure certification checklist",
      "sources": [
        {
          "name": "EPA: Conditional no exposure exclusion",
          "url": "https://www.epa.gov/npdes/stormwater-discharges-industrial-activities-conditional-no-exposure-exclusion"
        },
        {
          "name": "EPA: Stormwater permitting authority by location",
          "url": "https://www.epa.gov/npdes/authorization-status-epas-construction-and-industrial-stormwater-programs"
        },
        {
          "name": "EPA: Find the NPDES program for your state or territory",
          "url": "https://www.epa.gov/npdes-permits"
        },
        {
          "name": "EPA-issued sites: sign in to NeT-MSGP to file a certification",
          "url": "https://cdxnodengn.epa.gov/net-msgp/action/login"
        },
        {
          "name": "EPA: Filing instructions and CDX registration",
          "url": "https://www.epa.gov/npdes/stormwater-discharges-industrial-activities-electronic-reporting"
        },
        {
          "name": "EPA: Appendix K certification questions (2021 reference PDF)",
          "url": "https://www.epa.gov/sites/default/files/2021-01/documents/2021_msgp_-_appendix_k_-_no_exposure_certification_nec_form.pdf"
        },
        {
          "name": "EPA: Who can use the administratively continued 2021 permit?",
          "url": "https://www.epa.gov/npdes/administrative-continuance-epas-2021-msgp"
        }
      ],
      "summary": "Check industrial materials and activities across the whole facility, including planned changes. See what blocks certification or where to file if the official checklist also checks out. This is not the certification form.",
      "example": "The day shift unloads indoors. The afternoon pickup leaves metal turnings on the waste pad, and nobody has checked the roof drains.",
      "fields": [
        {
          "key": "status",
          "label": "Why are you walking the site?",
          "type": "select",
          "options": [
            "Screening for the first time",
            "Already relying on no exposure",
            "Expecting a layout or operating change"
          ]
        },
        {
          "key": "authority",
          "label": "Who issues industrial stormwater permits at this site?",
          "type": "select",
          "options": [
            "EPA confirmed for this facility",
            "State or territorial program confirmed",
            "Not yet confirmed"
          ],
          "help": "Use the program for the facility and operator. If unsure, choose “Not yet confirmed”."
        },
        {
          "key": "dock",
          "label": "Loading and transfer areas",
          "type": "select",
          "options": [
            "Checked: protected or absent",
            "Exposed to weather or runoff",
            "Not yet verified",
            "Checked: only outdoor items meet a documented shelter exception"
          ],
          "help": "Follow a delivery from the trailer to storage. Look for spilled powder, wet pallet staging and wind-driven rain."
        },
        {
          "key": "waste",
          "label": "Waste and scrap storage",
          "type": "select",
          "options": [
            "Checked: protected or absent",
            "Exposed to weather or runoff",
            "Not yet verified",
            "Checked: only outdoor items meet a documented shelter exception"
          ],
          "help": "Check lids, seams and the pad after pickup. Covered, nonleaking dumpsters do not protect loose material on the ground."
        },
        {
          "key": "yard",
          "label": "Machinery, storage and maintenance",
          "type": "select",
          "options": [
            "Checked: protected or absent",
            "Exposed to weather or runoff",
            "Not yet verified",
            "Checked: only outdoor items meet a documented shelter exception"
          ],
          "help": "Inspect outdoor equipment, raw stock and maintenance work. A drum left outside under the federal sealed-container exception must be secured, sound, nonleaking and without operational taps or valves."
        },
        {
          "key": "other",
          "label": "Remaining areas and shifts",
          "type": "select",
          "options": [
            "Checked: protected or absent",
            "Exposed to weather or runoff",
            "Not yet verified",
            "Checked: only outdoor items meet a documented shelter exception"
          ],
          "help": "Follow deposits from roof vents to drains and check truck routes, winter storage and planned work. A finished product that can wash away, such as rock salt, is not protected by the federal final-product exception."
        }
      ],
      "sample": {
        "status": "Already relying on no exposure",
        "authority": "Not yet confirmed",
        "dock": "Checked: protected or absent",
        "waste": "Exposed to weather or runoff",
        "yard": "Checked: protected or absent",
        "other": "Not yet verified"
      }
    },
    {
      "kind": "tools",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/tools/industrial-issuer-sector-navigator/",
      "slug": "industrial-issuer-sector-navigator",
      "title": "Industrial stormwater permit issuer and sector finder",
      "sources": [
        {
          "name": "EPA: Stormwater permitting authority by location",
          "url": "https://www.epa.gov/npdes/authorization-status-epas-construction-and-industrial-stormwater-programs"
        },
        {
          "name": "EPA: Find the NPDES program for your state or territory",
          "url": "https://www.epa.gov/npdes-permits"
        },
        {
          "name": "EPA: Industrial sectors and activity codes, Appendix D (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2021-01/documents/2021_msgp_-_appendix_d_-_facilities_and_activities_covered.pdf"
        },
        {
          "name": "EPA: Who can use the administratively continued 2021 permit?",
          "url": "https://www.epa.gov/npdes/administrative-continuance-epas-2021-msgp"
        }
      ],
      "summary": "Identify a starting agency and look up a federal sector example. This is not a parcel-level jurisdiction check or a list of state permit requirements.",
      "example": "A Colorado federal operator runs a sawmill and a second industrial operation on the same parcel. Both the operator and the second activity affect the lookup.",
      "fields": [
        {
          "key": "place",
          "label": "State or territory",
          "type": "select",
          "options": [
            "Alabama",
            "Alaska",
            "Arizona",
            "Arkansas",
            "California",
            "Colorado",
            "Connecticut",
            "Delaware",
            "District of Columbia",
            "Florida",
            "Georgia",
            "Hawaii",
            "Idaho",
            "Illinois",
            "Indiana",
            "Iowa",
            "Kansas",
            "Kentucky",
            "Louisiana",
            "Maine",
            "Maryland",
            "Massachusetts",
            "Michigan",
            "Minnesota",
            "Mississippi",
            "Missouri",
            "Montana",
            "Nebraska",
            "Nevada",
            "New Hampshire",
            "New Jersey",
            "New Mexico",
            "New York",
            "North Carolina",
            "North Dakota",
            "Ohio",
            "Oklahoma",
            "Oregon",
            "Pennsylvania",
            "Rhode Island",
            "South Carolina",
            "South Dakota",
            "Tennessee",
            "Texas",
            "Utah",
            "Vermont",
            "Virginia",
            "Washington",
            "West Virginia",
            "Wisconsin",
            "Wyoming",
            "American Samoa",
            "Guam",
            "Northern Mariana Islands",
            "Puerto Rico",
            "U.S. Virgin Islands",
            "Other U.S. area"
          ]
        },
        {
          "key": "setting",
          "label": "Site setting",
          "type": "select",
          "options": [
            "Ordinary non-federal site",
            "Industrial activity by a federal operator",
            "Indian country or tribal land status to verify",
            "Special location or activity; jurisdiction uncertain"
          ],
          "help": "Use the facility location and operator, not the mailing address."
        },
        {
          "key": "activity",
          "label": "Activity to look up",
          "type": "select",
          "options": [
            "General sawmill or planing mill",
            "Paperboard mill",
            "Auto salvage yard",
            "Scrap or waste recycling",
            "Bakery products manufacturing",
            "Other or not sure"
          ],
          "help": "Selected federal examples; use “Other” for the full lookup."
        },
        {
          "key": "mix",
          "label": "How many industrial activities are on site?",
          "type": "select",
          "options": [
            "One activity identified",
            "Two or more activities",
            "Activities not fully inventoried"
          ]
        }
      ],
      "sample": {
        "place": "Colorado",
        "setting": "Industrial activity by a federal operator",
        "activity": "General sawmill or planing mill",
        "mix": "Two or more activities"
      }
    },
    {
      "kind": "tools",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/tools/industrial-outfall-sampling-planner/",
      "slug": "industrial-outfall-sampling-planner",
      "sources": [
        {
          "name": "EPA: Industrial stormwater monitoring and sampling guide (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2015-11/documents/msgp_monitoring_guide.pdf"
        },
        {
          "name": "EPA: 2021 industrial permit, Parts 1–7 (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2021-07/2021-msgp-permit-parts-1-7.pdf"
        }
      ],
      "title": "Industrial stormwater outfall sampling planner",
      "summary": "Plan a field visit, calculate a collection window from your permit, and decide what to record if you cannot collect.",
      "example": "Discharge starts at OF-02 at 23:50. For this example the permit calls for collection within 30 minutes, so the window closes at 00:20 the next day.",
      "fields": [
        {
          "key": "outfall",
          "label": "Monitoring point ID",
          "type": "text",
          "help": "Use one ID from your current permit or site map, such as OF-02."
        },
        {
          "key": "event",
          "label": "Field condition",
          "type": "select",
          "options": [
            "Discharge observed; safe access",
            "No discharge observed",
            "Unsafe to approach",
            "Forecast only; discharge not confirmed"
          ]
        },
        {
          "key": "purpose",
          "label": "Purpose of this visit",
          "type": "select",
          "options": [
            "Lab analysis: benchmark",
            "Lab analysis: numeric effluent limit",
            "Visual assessment"
          ]
        },
        {
          "key": "clock",
          "label": "Discharge start (24-hour local time)",
          "type": "text",
          "help": "HH:MM. Only needed for an observed discharge; use the outfall start, not the first raindrop."
        },
        {
          "key": "window",
          "label": "Collection window in minutes",
          "type": "number",
          "help": "Only for an observed discharge. Copy the window from your applicable permit and method; do not guess."
        }
      ],
      "sample": {
        "outfall": "OF-02",
        "event": "Discharge observed; safe access",
        "purpose": "Lab analysis: benchmark",
        "clock": "23:50",
        "window": "30"
      }
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/no-exposure-versus-no-discharge/",
      "slug": "no-exposure-versus-no-discharge",
      "title": "No exposure certification or no discharge: which record do you need?",
      "answer": "No exposure asks what stormwater touches across the facility. No discharge asks where the water goes. A building can release clean roof drainage and still be a no-exposure candidate; an uncovered yard cannot claim no exposure just because its basin looks empty.",
      "steps": [
        "For exposure, inventory material handling, storage, equipment and waste, including deposits left after work ends.",
        "For discharge, trace surface flow, pipes, overflow structures and storm sewer connections. Verify where they lead rather than stopping at the fence.",
        "Take drainage evidence to the issuer if relying on no discharge. For no exposure, verify the entire facility against the issuer’s certification; one clean outfall is not enough. This industrial exclusion does not cover construction stormwater."
      ],
      "example": "A print shop keeps ink, deliveries and spent rags inside. Its downspout connects to a city storm sewer: that connection rules out calling the roof drainage “retained on site,” but it does not by itself expose ink to rain.",
      "next": "If the facility meets the criteria, have an authorized signer file a No Exposure Certification (NEC). Use NeT-MSGP where EPA issues the permit or the state program’s instructions where it does not. Keep the receipt with the site inventory.",
      "sources": [
        {
          "name": "EPA: Conditional no exposure exclusion",
          "url": "https://www.epa.gov/npdes/stormwater-discharges-industrial-activities-conditional-no-exposure-exclusion"
        },
        {
          "name": "EPA: Stormwater permitting authority by location",
          "url": "https://www.epa.gov/npdes/authorization-status-epas-construction-and-industrial-stormwater-programs"
        },
        {
          "name": "EPA-issued sites: sign in to NeT-MSGP to file a certification",
          "url": "https://cdxnodengn.epa.gov/net-msgp/action/login"
        },
        {
          "name": "EPA: Find the NPDES program for your state or territory",
          "url": "https://www.epa.gov/npdes-permits"
        },
        {
          "name": "EPA: Appendix K certification questions (2021 reference PDF)",
          "url": "https://www.epa.gov/sites/default/files/2021-01/documents/2021_msgp_-_appendix_k_-_no_exposure_certification_nec_form.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/loading-dock-weather-exposure/",
      "slug": "loading-dock-weather-exposure",
      "title": "Does the loading dock keep materials out of the rain?",
      "answer": "A canopy is useful only if it actually protects transfers and residue from precipitation and run-on. Walk the gap between the trailer and dock, and the route pallets take while staff free up indoor space.",
      "steps": [
        "Watch an entire unloading cycle, including the wait before storage. Check both the first and last pallets.",
        "Look for rain blowing under the roof, meltwater entering from the yard and forklift tracks carrying spilled material outside.",
        "Change where goods wait, repair covers or seals and remove residue. Recheck under the conditions that caused the exposure."
      ],
      "example": "Bagged pigment stays dry during unloading, but a torn bag leaves a blue trail past the canopy edge. Moving the staging line indoors alone does not solve the residue already in the gutter.",
      "next": "Record the gap, the cleanup and a wet-weather check before using the dock as evidence of no exposure.",
      "sources": [
        {
          "name": "EPA: No exposure guidance manual (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2016-02/documents/noxguide.pdf"
        },
        {
          "name": "EPA: Conditional no exposure exclusion",
          "url": "https://www.epa.gov/npdes/stormwater-discharges-industrial-activities-conditional-no-exposure-exclusion"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/dumpsters-and-scrap-storage/",
      "slug": "dumpsters-and-scrap-storage",
      "title": "Check what leaves the dumpster, not just its lid",
      "answer": "Covered, nonleaking waste containers are different from exposed industrial waste. Inspect the bottom seam, drain plugs, pad and pickup area. An open scrap pile beside a sound container is a separate source.",
      "steps": [
        "Check the lid during normal operations and after pickup. Look for pooled liquid under seams and debris around the wheels.",
        "Identify industrial refuse, metal chips and residues, including material that falls out when the bin is tipped.",
        "Replace or shelter leaking containers, relocate uncovered scrap and remove escaped material. Verify the new arrangement with staff on pickup day."
      ],
      "example": "A machine shop closes its chip-bin lid every night, but oily turnings spill during Friday’s bin exchange. The overlooked exposure is on the pad after pickup, not under the closed lid.",
      "next": "Walk from the bin pad to the first inlet and document what you find.",
      "sources": [
        {
          "name": "EPA: No exposure guidance manual (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2016-02/documents/noxguide.pdf"
        },
        {
          "name": "EPA: Conditional no exposure exclusion",
          "url": "https://www.epa.gov/npdes/stormwater-discharges-industrial-activities-conditional-no-exposure-exclusion"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/mixed-industrial-activities/",
      "slug": "mixed-industrial-activities",
      "title": "What if two kinds of industrial work share one yard?",
      "answer": "A facility’s primary business does not erase other covered industrial activities. Identify who operates each activity, which drainage area it uses and what the applicable permit calls a co-located activity.",
      "steps": [
        "List actual processes separately; note whether the same operator controls them and their stormwater controls.",
        "Check each activity against the issuer’s sector and eligibility tables. Distinguish an independent operation from an incidental task.",
        "Overlay confirmed activities on drainage areas. Build the outfall monitoring list from applicable sector, receiving-water and site-specific conditions."
      ],
      "example": "A sawmill receives logs at the west gate. Its operator also buys and processes outside scrap on an east pad. The mill’s timber classification is not an answer for the separate scrap business or its east drain.",
      "next": "Give the issuer your activity list and marked-up map if the two operations overlap.",
      "sources": [
        {
          "name": "EPA: Industrial sectors and activity codes, Appendix D (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2021-01/documents/2021_msgp_-_appendix_d_-_facilities_and_activities_covered.pdf"
        },
        {
          "name": "EPA: 2021 industrial permit, Parts 1–7 (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2021-07/2021-msgp-permit-parts-1-7.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/identify-an-industrial-sector/",
      "slug": "identify-an-industrial-sector",
      "title": "Identify a sector from what the facility actually does",
      "answer": "Match the facility’s process to the classification used in the issuing permit. In EPA’s 2021 permit, Appendix D pairs four-digit SIC or activity codes with sectors and subsectors. A corporate NAICS code alone is not that match.",
      "steps": [
        "Write a short process description: what arrives, what changes on site and what leaves.",
        "Read the full candidate table row, including qualifiers and exclusions. Compare close alternatives, not just words in the business name.",
        "Save the matched wording and code in your file. Read the sector conditions in the permit actually issued for this location."
      ],
      "example": "Two businesses ship paperboard. One makes paperboard at a mill (SIC 2631, federal B1); the other converts purchased board into boxes. They should not copy the same subsector from a shared customer’s records.",
      "next": "Use the issuer and sector navigator, then keep the table citation behind your choice.",
      "sources": [
        {
          "name": "EPA: Stormwater permitting authority by location",
          "url": "https://www.epa.gov/npdes/authorization-status-epas-construction-and-industrial-stormwater-programs"
        },
        {
          "name": "EPA: Industrial sectors and activity codes, Appendix D (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2021-01/documents/2021_msgp_-_appendix_d_-_facilities_and_activities_covered.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/map-industrial-drainage/",
      "slug": "map-industrial-drainage",
      "title": "Map the route from a work area to receiving water",
      "answer": "A useful site map lets a new sampler follow water from an activity through controls to a numbered discharge point. An inlet is only one step along that route.",
      "steps": [
        "Start with the property outline, contours and known pipes. Draw drainage boundaries and arrows; distinguish incoming runoff from site drainage.",
        "Label each industrial area, pollutant source, control, outlet, sampling point and receiving water or municipal storm sewer. Flag unknown downstream connections.",
        "Walk the arrows during safe wet conditions. Reconcile field observations with utility records; date the revised map and match IDs to field sheets."
      ],
      "example": "A plan sends both roof leaders north, but water from the east leader crosses the scrap pad before entering a trench drain. Redrawing that arrow changes which source the south outfall inspection needs to cover.",
      "next": "Have someone who did not draw the map locate one sampling point without directions.",
      "sources": [
        {
          "name": "EPA: Industrial stormwater planning guidance",
          "url": "https://www.epa.gov/npdes/industrial-stormwater-guidance"
        },
        {
          "name": "EPA: Industrial stormwater monitoring and sampling guide (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2015-11/documents/msgp_monitoring_guide.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/substantially-identical-industrial-outfalls/",
      "slug": "substantially-identical-industrial-outfalls",
      "title": "When can one outfall represent another?",
      "answer": "Similar-looking pipes are not enough. The permit must allow representative monitoring for the requirement in question, and you need evidence that the runoff is substantially identical.",
      "steps": [
        "Compare the activities, exposed materials, controls and estimated runoff coefficients of the drainage areas. Record meaningful differences.",
        "Document the representative and represented point IDs and rationale in the stormwater pollution prevention plan. Check approval and rotation rules.",
        "Under EPA’s 2021 permit, numeric effluent limits require each affected point to be monitored; representative visual assessments rotate among grouped points. Check the actual issuer’s rules."
      ],
      "example": "Two paved yards have the same area and inlet design. Only the west yard receives oily scrap. Matching pavement does not overcome the different pollutant source; keep the west point separate.",
      "next": "Revisit the grouping whenever storage, activities, paving or controls change.",
      "sources": [
        {
          "name": "EPA: 2021 industrial permit, Parts 1–7 (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2021-07/2021-msgp-permit-parts-1-7.pdf"
        },
        {
          "name": "EPA: Industrial stormwater monitoring and sampling guide (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2015-11/documents/msgp_monitoring_guide.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/stormwater-benchmarks-versus-limits/",
      "slug": "stormwater-benchmarks-versus-limits",
      "title": "Is the lab result above a benchmark or an effluent limit?",
      "answer": "Read the heading on the permit table before interpreting the number. Under EPA’s 2021 permit, a benchmark exceedance is not itself a numeric effluent limit violation, but can require additional action. Exceeding an applicable enforceable numeric limit on its stated comparison basis is a violation.",
      "steps": [
        "Match the outfall, pollutant, units and sample type; confirm whether the criterion is a single-event value or an average.",
        "For a benchmark, apply the permit’s trigger rules, then document the required review, controls, monitoring and deadlines.",
        "For a numeric limit, evaluate the applicable period and promptly follow noncompliance reporting and corrective-action instructions; do not wait for a benchmark review."
      ],
      "example": "A coordinator sees 0.18 mg/L in the lab report and 0.15 mg/L in a worksheet. If 0.15 is an averaging-based benchmark, a single comparison does not establish a limit violation. If it is the applicable daily maximum, it is a different response. These are illustrative numbers, not standards.",
      "next": "Attach the permit table row to the lab report so the next reviewer sees which response applies.",
      "sources": [
        {
          "name": "EPA: 2021 industrial permit, Parts 1–7 (PDF)",
          "url": "https://www.epa.gov/system/files/documents/2021-07/2021-msgp-permit-parts-1-7.pdf"
        },
        {
          "name": "EPA: Industrial stormwater monitoring and sampling guide (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2015-11/documents/msgp_monitoring_guide.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Industrial stormwater",
      "url": "https://cleanpermit.com/guides/revisit-industrial-no-exposure/",
      "slug": "revisit-industrial-no-exposure",
      "title": "Which changes should reopen a no-exposure review?",
      "answer": "Recheck before moving materials outside, changing transfer routes, adding a shift or modifying drainage. No exposure depends on conditions continuing at the entire facility, not just on the date of the last certification.",
      "steps": [
        "Compare the proposed work and routes to the last walkthrough, including snow storage, waste pickup and temporary staging.",
        "Keep the planned activity protected, or obtain required permit coverage before the resulting discharge. Do not wait for the renewal date.",
        "If exposure is unexpected, stop or contain the source where safe, document what happened and contact the permitting authority promptly about coverage and reporting."
      ],
      "example": "During a roof repair, a warehouse plans to move damaged-goods sorting to the parking lot for two weeks. Its certification still has years left, but the sorting move calls for a new exposure check before the first pallet goes outside.",
      "next": "Add a stormwater review to the work order and assign a person to verify the temporary layout.",
      "sources": [
        {
          "name": "EPA: Conditional no exposure exclusion",
          "url": "https://www.epa.gov/npdes/stormwater-discharges-industrial-activities-conditional-no-exposure-exclusion"
        },
        {
          "name": "EPA: No exposure guidance manual (PDF)",
          "url": "https://www.epa.gov/sites/default/files/2016-02/documents/noxguide.pdf"
        },
        {
          "name": "EPA: Who can use the administratively continued 2021 permit?",
          "url": "https://www.epa.gov/npdes/administrative-continuance-epas-2021-msgp"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/tools/spcc-container-inventory/",
      "slug": "spcc-container-inventory",
      "sources": [
        {
          "name": "40 CFR 112.1 — General applicability",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.1"
        },
        {
          "name": "40 CFR 112.2 — Definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.2"
        }
      ],
      "title": "SPCC oil storage capacity inventory",
      "summary": "Turn an equipment list into separate aboveground and completely buried totals. Flag unresolved containers before using the totals to screen a non-farm site.",
      "example": "A 1,000 gal diesel tank plus six 55 gal oil drums gives 1,330 gal aboveground. Twelve 5 gal pails do not count. That is 10 gal over the ordinary aboveground cutoff, not proof that a plan is required.",
      "sample": {
        "rows": "Diesel tank, 1, 1000, above\nOil drums, 6, 55, above\nPails, 12, 5, above"
      },
      "fields": [
        {
          "key": "rows",
          "label": "Container groups (one per line)",
          "type": "textarea",
          "help": "Enter label, quantity, shell US gal each (up to 3 decimal places), category. Use above, buried, exempt or unknown. No thousands separators. Use exempt only for a verified exclusion; do not include water volume or current fill."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/tools/spcc-net-containment/",
      "slug": "spcc-net-containment",
      "sources": [
        {
          "name": "40 CFR 112.8 — Onshore bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-B/section-112.8"
        },
        {
          "name": "40 CFR 112.12 — Animal fats and vegetable oil bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-C/section-112.12"
        },
        {
          "name": "EPA — Secondary containment worksheets",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/secondary-containment-calculation-worksheets"
        },
        {
          "name": "EPA — Sufficient freeboard for precipitation",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/what-are-specifications-bulk-storage-secondary"
        },
        {
          "name": "NOAA — Precipitation Frequency Data Server",
          "url": "https://hdsc.nws.noaa.gov/pfds/"
        }
      ],
      "title": "SPCC secondary containment calculator for a rectangular berm",
      "summary": "Check a flat, rectangular berm around stationary aboveground bulk oil storage. Compare measured space with the largest tank release plus rain, and see the gallons short or left over. This is not the sizing test for a transfer rack or production site.",
      "example": "A 20 × 15 ft berm with 2 ft of usable height has about 4,488 gal gross. Subtract 40 ft³ of obstructions, 100 gal of standing water and 3 in of rain over 300 ft²: about 3,528 gal remains for a 3,500 gal release.",
      "sample": {
        "length": "20",
        "width": "15",
        "height": "2",
        "displaced": "40",
        "water": "100",
        "depth": "3",
        "area": "300",
        "tank": "3500"
      },
      "fields": [
        {
          "key": "length",
          "label": "Inside length (ft)",
          "type": "number",
          "help": "Measure wall to wall inside the berm; do not subtract tank widths here if you enter their displacement below."
        },
        {
          "key": "width",
          "label": "Inside width (ft)",
          "type": "number",
          "help": "Use a level, rectangular footprint."
        },
        {
          "key": "height",
          "label": "Usable wall height (ft)",
          "type": "number",
          "help": "Measure floor to the lowest overflow point, not the tallest wall."
        },
        {
          "key": "displaced",
          "label": "Displaced volume below overflow (ft³)",
          "type": "number",
          "help": "Include surviving tank portions, foundations and supports that occupy space in the release scenario. Enter 0 only if verified."
        },
        {
          "key": "water",
          "label": "Standing liquid already present (US gal)",
          "type": "number",
          "help": "Enter measured existing liquid, or 0 if dry."
        },
        {
          "key": "depth",
          "label": "Design precipitation (in)",
          "type": "number",
          "help": "Use storm depth in inches, not an hourly rate. Record the source, location, duration and recurrence interval in the plan file. Zero assumes precipitation and run-on are excluded."
        },
        {
          "key": "area",
          "label": "Contributing catchment (ft²)",
          "type": "number",
          "help": "Typically the inside footprint plus any run-on or roof area draining into it; do not count the same area twice."
        },
        {
          "key": "tank",
          "label": "Largest single tank shell capacity (US gal)",
          "type": "number",
          "help": "For this shared containment area, not the volume normally delivered."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/tools/spcc-qualified-facility-screen/",
      "slug": "spcc-qualified-facility-screen",
      "sources": [
        {
          "name": "EPA — Is my facility a qualified facility?",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/my-facility-qualified-facility-under-spcc-rule"
        },
        {
          "name": "40 CFR 112.6 — Qualified facility plans",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.6"
        },
        {
          "name": "40 CFR 112.1 — General applicability",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.1"
        },
        {
          "name": "EPA — SPCC for agriculture",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/spill-prevention-control-and-countermeasure-spcc"
        },
        {
          "name": "WRRDA §1049 as amended — farm thresholds and exclusions",
          "url": "https://uscode.house.gov/us/usc/119-121/t33/s1361/#miscellaneous-note"
        }
      ],
      "title": "SPCC qualified facility screen",
      "summary": "Find the next federal SPCC plan path for an onshore, non-transportation-related oil facility. The screen keeps unknowns open and applies a separate farm branch.",
      "example": "A service yard with 8,200 gal aboveground, a largest tank of 6,000 gal, a route to a creek and no qualifying discharges screens toward Tier II—not the Tier I template.",
      "sample": {
        "kind": "Non-farm",
        "route": "Yes",
        "above": "8200",
        "buried": "0",
        "largest": "6000",
        "history": "No qualifying events"
      },
      "fields": [
        {
          "key": "kind",
          "label": "Facility type",
          "options": [
            "Unknown",
            "Non-farm",
            "Farm"
          ],
          "help": "Use Farm only for the §112.2 definition. For mixed operations or an uncertain boundary, choose Unknown.",
          "type": "select"
        },
        {
          "key": "route",
          "label": "Could a harmful oil discharge reasonably reach navigable waters or adjoining shorelines?",
          "options": [
            "Unknown",
            "Yes",
            "No"
          ],
          "help": "Evaluate geography, terrain and drainage without credit for dikes, equipment or other manmade containment.",
          "type": "select"
        },
        {
          "key": "above",
          "label": "Counted aboveground capacity (US gal)",
          "type": "text",
          "help": "Type a number or unknown. Farms: first apply the farm-specific aggregate exclusions described in the farm guide."
        },
        {
          "key": "buried",
          "label": "Counted completely buried capacity (US gal)",
          "type": "text",
          "help": "Type 0 for none, or unknown. Exclude tanks subject to all technical requirements of 40 CFR part 280 or a state program approved under part 281."
        },
        {
          "key": "largest",
          "label": "Largest counted aboveground tank/container (US gal)",
          "type": "text",
          "help": "Type 0 for none, or unknown. Use shell capacity, not current contents."
        },
        {
          "key": "history",
          "label": "Discharges to navigable waters or adjoining shorelines",
          "options": [
            "Unknown",
            "No qualifying events",
            "Qualifying event or pair"
          ],
          "help": "Three years before certification (since becoming subject if operating less than three years): one discharge over 1,000 US gal, or two each over 42 US gal within any 12 months. Exclude natural disasters, acts of war and terrorism. Count what reached water or shoreline, not all oil released.",
          "type": "select"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-counted-containers/",
      "slug": "spcc-counted-containers",
      "title": "Which containers belong in the oil inventory?",
      "answer": "Start with every location that stores or uses oil, not just the tank farm. A 55 US gal drum counts at exactly 55; twenty 5 gal pails do not become a 100 gal container. Classify each item before adding its shell capacity.",
      "steps": [
        "Walk each operating area. Record the identifier, location, oil, number of identical units, shell gallons and evidence for each capacity. Include used oil, vegetable oil, standby equipment and oil-filled operating equipment unless an exclusion applies.",
        "Put bunkered, partially buried and vaulted tanks in the aboveground column. Keep completely buried tanks separate and verify whether all technical requirements of 40 CFR part 280 or a state program approved under part 281 cover the tank before excluding it.",
        "Record exclusions individually. A vehicle’s motive-power fuel tank is different from a storage tank that supplies vehicles. An empty seasonal tank is not necessarily permanently closed. Put disputed items in an unresolved column."
      ],
      "example": "A depot has four 275 gal oil totes, four 55 gal used-oil drums and twenty 5 gal pails. The totes and drums total 1,320 gal, exactly the ordinary aboveground cutoff. One more 55 gal drum takes it to 1,375 gal. Check the buried total and location test separately.",
      "next": "Take the counted aboveground total, buried total and largest single aboveground shell into the pathway screen; keep the exclusion register with the site map.",
      "sources": [
        {
          "name": "40 CFR 112.1 — General applicability",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.1"
        },
        {
          "name": "40 CFR 112.2 — Definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.2"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-shell-versus-fill/",
      "slug": "spcc-shell-versus-fill",
      "title": "Use shell capacity, not today’s oil level",
      "answer": "Storage capacity is what the shell can hold, not the delivery limit, dipstick reading or amount left after a shift. A low-fill policy does not reduce the capacity entered in the inventory or the largest-tank containment check.",
      "steps": [
        "Read the manufacturer’s plate or tank record for shell gallons. Identify separate containers rather than adding today’s delivery tickets. If the plate is illegible, obtain a drawing or verified capacity before using the number.",
        "Keep current contents in the operating log, separate from the SPCC capacity register. Include in-service, standby and seasonal containers even when they are temporarily empty.",
        "Remove a permanently closed tank from the counted register only with evidence of the §112.2 closure conditions: remove liquid and sludge, disconnect and blank piping, close and lock non-vent valves, and post a dated closure sign."
      ],
      "example": "A shop normally stops filling its 2,000 gal tank at 1,500 gal. The gauge shows 380 gal today. Enter 2,000 gal for the screen and the bulk storage containment comparison; keep 380 gal for the operational record.",
      "next": "Replace fill estimates in the inventory with documented shell ratings and rerun any earlier calculation that used working volume.",
      "sources": [
        {
          "name": "40 CFR 112.2 — Definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.2"
        },
        {
          "name": "40 CFR 112.1 — General applicability",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.1"
        },
        {
          "name": "40 CFR 112.8 — Onshore bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-B/section-112.8"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-discharge-evidence/",
      "slug": "spcc-discharge-evidence",
      "title": "What discharge evidence changes the plan path?",
      "answer": "Two decisions need different evidence: could oil reasonably reach water, and how much oil actually reached water in past events? A dry incident record does not rule out a future path to water. A large release kept on land is not automatically a disqualifying discharge.",
      "steps": [
        "Trace surface slope, storm drains and ditches to navigable waters or adjoining shorelines without counting dikes or other manmade barriers as protection. Save the drainage sketch and the basis for your determination.",
        "Review the three years before the intended certification date, or since becoming subject if operating less than three years. Record incident dates, quantities reaching water or shoreline, how they were estimated, and the evidence for any natural-disaster, war or terrorism exclusion.",
        "Look for a single discharge over 1,000 US gal or two each over 42 US gal within any rolling 12 months. A calendar-year break does not reset the test. If the destination or amount is unknown, do not check “no qualifying events.” These are not emergency notification thresholds."
      ],
      "example": "In November and the following February, 58 and 47 gal reached the same creek. Neither event alone exceeded 1,000 gal, but both exceeded 42 gal in a single 12-month period. A separate 200 gal loss fully recovered indoors contributes no gallons to that water total.",
      "next": "Keep cleanup records and receiving-water estimates with the eligibility file. For an active release, use the incident response and notification procedures immediately; do not wait to complete this screen.",
      "sources": [
        {
          "name": "40 CFR 112.1 — General applicability",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.1"
        },
        {
          "name": "40 CFR 112.3 — Plan preparation and eligibility",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.3"
        },
        {
          "name": "EPA — Is my facility a qualified facility?",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/my-facility-qualified-facility-under-spcc-rule"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-berm-displacement/",
      "slug": "spcc-berm-displacement",
      "title": "Subtract what occupies space inside a berm",
      "answer": "Length × width × wall height is gross space. Water and solids already inside share that space with a release. Count the volume of surviving equipment below the overflow elevation, not the nameplate capacity of every tank in the enclosure.",
      "steps": [
        "Choose a failure scenario and the lowest escape elevation. Measure inside dimensions from the actual floor; for sloping ground or unequal walls, obtain a survey or elevation-volume calculation instead of treating the area as a full box.",
        "For intact tanks, foundations, supports and pipes, determine the volume physically below the overflow level. Do not remove overlapping volumes twice, and document your assumption about the failed tank. Recheck other release scenarios if the controlling displacement could change.",
        "Convert cubic feet to US gallons (1 ft³ ≈ 7.48052 gal), subtract displaced gallons and measured standing liquid, then reserve precipitation. Compare what remains with the entire shell of the largest tank served."
      ],
      "example": "An intact vertical tank 4 ft in diameter sits on an 8 × 4 ft pad. At a 2 ft overflow height, a 0.5 ft solid pad displaces 16 ft³ and the tank above it displaces π × 2² × 1.5 ≈ 18.85 ft³. Enter 34.85 ft³ (about 261 gal) for these obstructions, not the tank’s shell gallons. Do not count the overlapping pad height again.",
      "next": "Retain the sketch with object dimensions, elevations and the failed-tank assumption. Revisit the calculation when equipment is added inside the berm.",
      "sources": [
        {
          "name": "40 CFR 112.8 — Onshore bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-B/section-112.8"
        },
        {
          "name": "EPA — Secondary containment worksheets",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/secondary-containment-calculation-worksheets"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-one-hundred-ten-percent/",
      "slug": "spcc-one-hundred-ten-percent",
      "title": "Is 110% containment always enough?",
      "answer": "No. For stationary bulk oil storage under §112.8(c)(2), or animal fats and vegetable oils under §112.12(c)(2), the federal test is the entire capacity of the largest single container plus sufficient freeboard for precipitation. Ten percent is not a universal federal rain allowance or a substitute for checking the actual basin.",
      "steps": [
        "Identify the rule that applies to the installation. Bulk storage sizing is not the same as the general containment test for transfer areas or oil-filled operating equipment.",
        "Start with net space, not a vendor’s nominal berm rating. Subtract displacement and existing water, then compare the remaining space to the largest shell plus the site’s precipitation volume.",
        "Check other applicable codes, permits, owner standards and access requirements separately. An additional percentage requirement does not replace the federal volume and precipitation check."
      ],
      "example": "A 1,000 gal tank sits in a berm with 1,100 gal available before rain. Two inches of rain over a 160 ft² catchment adds about 199 gal. The site needs about 1,199 gal for that scenario, leaving a 99 gal shortfall despite the 110% rating.",
      "next": "Document both the released oil and the rain load in gallons. If either quantity is unknown, do not close the containment review.",
      "sources": [
        {
          "name": "40 CFR 112.8 — Onshore bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-B/section-112.8"
        },
        {
          "name": "40 CFR 112.12 — Animal fats and vegetable oil bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-C/section-112.12"
        },
        {
          "name": "EPA — Sufficient freeboard for precipitation",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/what-are-specifications-bulk-storage-secondary"
        },
        {
          "name": "EPA — Secondary containment worksheets",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/secondary-containment-calculation-worksheets"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-precipitation-freeboard/",
      "slug": "spcc-precipitation-freeboard",
      "title": "Turn a rainfall depth into a freeboard reserve",
      "answer": "Freeboard is capacity kept available for precipitation, not an arbitrary strip of unused wall. Storm depth in inches divided by 12, multiplied by contributing square feet, gives cubic feet of water. Multiply by about 7.48052 for US gallons.",
      "steps": [
        "Document an appropriate local design storm and its source. EPA describes a 25-year, 24-hour event as appropriate for most facilities, not a mandatory nationwide value. For a site covered by NOAA’s Precipitation Frequency Data Server, select its location and read the precipitation depth at the selected duration and recurrence interval, not an intensity in inches per hour. Save the table with the site coordinates and date.",
        "Trace the catchment. Include roofs or adjoining pavement draining inward, without double-counting overlapping footprints. A roof does not justify a zero rain reserve if wind-driven rain or run-on still enters.",
        "Compare the calculated gallons with the space remaining after the release and displacement. Maintain drainage controls and inspection records; do not credit an open drain or assume pumping will occur during the storm."
      ],
      "example": "A 240 ft² basin also receives runoff from 60 ft² of adjacent paving. Four inches over 300 ft² is 100 ft³, or about 748 gal. Counting only the basin would understate the reserve by about 150 gal.",
      "next": "Put the storm source, catchment sketch and drainage assumptions alongside the calculation so the next inspection can verify them.",
      "sources": [
        {
          "name": "EPA — Sufficient freeboard for precipitation",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/what-are-specifications-bulk-storage-secondary"
        },
        {
          "name": "EPA — Secondary containment worksheets",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/secondary-containment-calculation-worksheets"
        },
        {
          "name": "40 CFR 112.8 — Onshore bulk storage",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-B/section-112.8"
        },
        {
          "name": "NOAA — Precipitation Frequency Data Server",
          "url": "https://hdsc.nws.noaa.gov/pfds/"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-tier-one-template/",
      "slug": "spcc-tier-one-template",
      "title": "When can an operator use EPA’s Tier I template?",
      "answer": "The Appendix G template is an option for a covered Tier I qualified facility, not a blank form any small business can sign. Under the ordinary screen, total aboveground capacity must be at most 10,000 US gal, every individual aboveground container at most 5,000 US gal, and the discharge-history test must be met.",
      "steps": [
        "Confirm applicability, shell totals and the three-year discharge evidence before downloading EPA’s template. A farm must check its separate statutory path. Verify that state rules permit self-certification.",
        "Visit the facility. Fill in the container list and locations, potential drainage paths, controls, inspection and test schedules, response contacts and training assignments. Verify each statement against actual conditions rather than copying a completed example.",
        "Check the certifications under §112.6(a), including management commitment, implementation and no prohibited deviations. An equivalent alternative to Appendix G needs a cross-reference to the requirements. Do not sign a template that does not describe the site."
      ],
      "example": "A covered yard with two 5,000 gal tanks and clean qualifying history is exactly at both Tier I caps. Replacing them with a single 10,000 gal tank keeps the total unchanged but moves the ordinary screen to Tier II, which calls for a full plan rather than Appendix G alone.",
      "next": "Have the owner/operator review the completed plan against the site, commit resources and implement it. The worksheet and eligibility result are not a signed plan.",
      "sources": [
        {
          "name": "EPA — Is my facility a qualified facility?",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/my-facility-qualified-facility-under-spcc-rule"
        },
        {
          "name": "40 CFR 112.6 — Qualified facility plans",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.6"
        },
        {
          "name": "EPA — Tier I plan template and examples",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/tier-i-qualified-facility-spcc-plan-template"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-farm-differences/",
      "slug": "spcc-farm-differences",
      "title": "Why farms need a separate SPCC screen",
      "answer": "A farm under §112.2 is a tract devoted to producing crops or raising animals (including fish) that produced and sold, or normally would have produced and sold, at least $1,000 in agricultural products during a year. WRRDA §1049 changes the aboveground capacity and certification decisions for these operations.",
      "steps": [
        "Map each parcel and identify its tanks. For the farm aggregate, §1049(c)(1) excludes individual containers of 1,000 gal or less on separate parcels and containers holding FDA-approved livestock-feed ingredients. The separate container-level exception in §1049(c)(2) also tests a 2,500 gal parcel aggregate; do not treat every separate parcel as wholly exempt.",
        "Under the published farm thresholds, aggregate below 2,500 US gal is exempt; over 2,500 but under 6,000 gal with no reportable history also screens exempt. At exactly 2,500 or 6,000 gal, get EPA regional confirmation because the statute uses strict inequalities. Do not substitute the ordinary 1,320 gal cutoff.",
        "Above 6,000 but below 20,000 gal, with no tank over 10,000 gal and no reportable history, self-certification may be available. Where a plan is required, a tank over 10,000 gal, aggregate at least 20,000 gal, or reportable history points to a PE. Verify history against the amended statute, not an older fact sheet."
      ],
      "example": "A qualifying orchard has two 7,500 gal tanks on the main tract. With a route to water, no counted buried storage and no qualifying discharge history, its 15,000 gal aboveground total can fit the farm self-certification path. That does not make it an Appendix G Tier I facility.",
      "next": "Retain the farm-status basis, parcel inventory and discharge review. For mixed facilities, uncertain parcels or exact boundaries, confirm the path with the EPA region before signing.",
      "sources": [
        {
          "name": "WRRDA §1049 as amended — farm thresholds and exclusions",
          "url": "https://uscode.house.gov/us/usc/119-121/t33/s1361/#miscellaneous-note"
        },
        {
          "name": "EPA — SPCC for agriculture",
          "url": "https://www.epa.gov/oil-spills-prevention-and-preparedness-regulations/spill-prevention-control-and-countermeasure-spcc"
        },
        {
          "name": "40 CFR 112.2 — Definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.2"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Oil storage & SPCC",
      "url": "https://cleanpermit.com/guides/spcc-tank-changes/",
      "slug": "spcc-tank-changes",
      "title": "What to update when a tank changes",
      "answer": "Treat a replacement, move, new foundation or piping change as a reason to revisit the site’s discharge potential. Under §112.5(a), a change in design, construction, operation or maintenance that materially affects that potential triggers a plan amendment; do not wait for the five-year review.",
      "steps": [
        "Compare before and after: total counted shells, largest tank, discharge direction, delivery point, containment and precipitation reserve. Mark new piping and valves on the diagram and update inspection or response procedures.",
        "For a material change, prepare the amendment within six months of the change and implement it as soon as possible, no later than six months after preparation. Track those as two separate dates. Maintain safe controls for current operations.",
        "Recheck plan eligibility and who must certify technical amendments under §§112.5(c) and 112.6. Keep the signed review and change record; the separate at-least-five-year plan review still applies."
      ],
      "example": "A yard replaces a 4,000 gal tank with a 6,000 gal tank beside its 3,000 gal tank. Total rises from 7,000 to 9,000 gal; with otherwise qualifying history it now screens Tier II instead of Tier I. Recalculate the berm for the 6,000 gal release and update the plan format.",
      "next": "Assign an owner to the amendment, field work and implementation date. Preserve the prior inventory so the change in tank size and plan path is auditable.",
      "sources": [
        {
          "name": "40 CFR 112.5 — Amending a plan",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.5"
        },
        {
          "name": "40 CFR 112.6 — Qualified facility plans",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.6"
        },
        {
          "name": "40 CFR 112.3 — Plan preparation and eligibility",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112/subpart-A/section-112.3"
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/tools/asbestos-notice-authority/",
      "slug": "asbestos-notice-authority",
      "title": "Find the asbestos demolition notification form for your job site",
      "sources": [
        {
          "name": "California Air Resources Board — find the air district",
          "url": "https://ww2.arb.ca.gov/our-work/programs/asbestos-neshap-program/renovation-or-demolition-locations"
        },
        {
          "name": "California Air Resources Board — non-delegated district form",
          "url": "https://ww2.arb.ca.gov/our-work/programs/asbestos-neshap-program/asbestos-neshap-notification-renovation-or-demolition"
        },
        {
          "name": "South Coast AQMD — Rule 1403 notification web application",
          "url": "https://www.aqmd.gov/home/rules-compliance/compliance/asbestos-demolition-removal/r1403-web-app"
        },
        {
          "name": "MassDEP — AQ 06 construction/demolition notice",
          "url": "https://www.mass.gov/how-to/file-an-aq-06-constructiondemolition-notification"
        },
        {
          "name": "MassDEP — AQ 04 asbestos removal notice",
          "url": "https://www.mass.gov/how-to/file-an-aq-04-anf-001-asbestos-removal-notification"
        },
        {
          "name": "EPA — state asbestos contacts",
          "url": "https://www.epa.gov/asbestos/state-asbestos-contacts"
        },
        {
          "name": "EPA — regional asbestos NESHAP contacts",
          "url": "https://www.epa.gov/stationary-sources-air-pollution/asbestos-national-emission-standards-hazardous-air-pollutants#additional-resources"
        },
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        }
      ],
      "summary": "Get official filing links for Massachusetts and selected California routes. Elsewhere, find the NESHAP contact who can confirm the form. There is no single filing portal for every U.S. job.",
      "example": "A Massachusetts warehouse with abatement before demolition uses the AQ 06 instructions for the demolition notice and the AQ 04 instructions for the separate removal notice. Both lead to eDEP, not a downloadable form to mail.",
      "sample": {
        "place": "Massachusetts",
        "job": "Demolition"
      },
      "fields": [
        {
          "key": "place",
          "label": "Where is the job site?",
          "type": "select",
          "options": [
            "California",
            "California — confirmed South Coast AQMD",
            "California — confirmed non-delegated air district",
            "Massachusetts",
            "Other U.S. location",
            "Tribal jurisdiction or boundary uncertain"
          ],
          "help": "Use the location of the building, not the contractor. In California choose a confirmed district only after checking the exact address; some counties span two districts."
        },
        {
          "key": "job",
          "label": "What is planned?",
          "type": "select",
          "options": [
            "Demolition",
            "Renovation",
            "Classification uncertain"
          ]
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/tools/asbestos-material-quantity-worksheet/",
      "slug": "asbestos-material-quantity-worksheet",
      "sources": [
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        }
      ],
      "title": "Compare asbestos quantities by unit",
      "summary": "Total inspection entries within each unit and compare each subtotal with its federal threshold.",
      "example": "Two pipe runs of 140 and 120 linear feet total 260 linear feet. That meets the pipe threshold exactly; a separate 70 square feet of panel material stays in the area column.",
      "sample": {
        "pipe": "140, 120",
        "surface": "70",
        "detached": "0"
      },
      "fields": [
        {
          "key": "pipe",
          "type": "textarea",
          "label": "Pipe material (linear ft)",
          "help": "Enter one amount per line, or use a comma followed by a space (140, 120). Do not use thousands separators. Use 0 for verified none, or “unknown” for an incomplete total."
        },
        {
          "key": "surface",
          "type": "textarea",
          "label": "Other components (sq ft)",
          "help": "Enter one amount per line, or use a comma followed by a space (140, 120). Do not use thousands separators. Use 0 for verified none, or “unknown” for an incomplete total."
        },
        {
          "key": "detached",
          "type": "textarea",
          "label": "Off-component material (cu ft)",
          "help": "Only material already off components whose length or area could not previously be measured. Enter one amount per line, or use a comma followed by a space (140, 120). Do not use thousands separators. Use 0 for verified none, or “unknown” for an incomplete total."
        }
      ]
    },
    {
      "kind": "tools",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/tools/asbestos-notice-milestones/",
      "slug": "asbestos-notice-milestones",
      "sources": [
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        },
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "MassDEP — AQ 06 filing and holiday-count instructions",
          "url": "https://www.mass.gov/doc/instructions-aq-06-constructiondemolition-notification/download"
        },
        {
          "name": "EPA Region 1 — exceptions to advance notice",
          "url": "https://www.epa.gov/system/files/documents/2022-08/less-than-10-day-notification-9-14-2017.pdf"
        }
      ],
      "title": "Asbestos notice deadline planner",
      "summary": "Work backward from a proposed start, or check the different steps for a date change, annual notice or urgent project.",
      "example": "For planned covered work starting January 11, 2027, ten federal working days back is December 28, 2026. If the receiving program excludes January 1 and December 25, the comparison date moves to December 24. Confirm its filing cutoff separately.",
      "sample": {
        "event": "Planned covered work",
        "anchor": "2027-01-11",
        "calendar": "Also compare agency-excluded weekdays",
        "exclusions": "2027-01-01, 2026-12-25"
      },
      "fields": [
        {
          "key": "event",
          "label": "Notice situation",
          "type": "select",
          "options": [
            "Planned covered work",
            "Earlier start on an existing notice",
            "Later start on an existing notice",
            "Annual planned nonscheduled renovations",
            "Government-ordered demolition",
            "Emergency renovation"
          ]
        },
        {
          "key": "anchor",
          "label": "Reference date",
          "type": "date",
          "help": "Use the proposed start for planned or earlier work; the originally notified start for a delay; December 31 of the preceding year for an annual notice. No date needed for urgent cases."
        },
        {
          "key": "calendar",
          "label": "Calendar to compare",
          "type": "select",
          "options": [
            "Federal NESHAP weekdays",
            "Also compare agency-excluded weekdays"
          ]
        },
        {
          "key": "exclusions",
          "label": "Agency-excluded dates, if comparing calendars",
          "type": "textarea",
          "help": "List every applicable closure the agency says does not count, as YYYY-MM-DD separated by commas or spaces. Federal NESHAP counts weekday holidays."
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/demolition-notice-with-no-asbestos/",
      "slug": "demolition-notice-with-no-asbestos",
      "title": "The inspection found no asbestos. Is demolition notice still required?",
      "answer": "Yes, for an ordinary demolition of a facility covered by the federal rule. A no-asbestos finding changes which provisions apply; it does not cancel the demolition notice.",
      "steps": [
        "Confirm that the inspection covered the whole demolition footprint, including later changes to the plans.",
        "Use the demolition notice for the site address. Under § 61.145(a)(2), the notice still identifies the owner/operator, building size, floors, age, uses, inspection method, quantities and demolition dates. Record what the inspector found; an inaccessible space is not a negative finding.",
        "Describe what the team will do if unexpected regulated material is found. Keep the inspection, filed notice and proof of delivery together; a building permit is not proof of air-agency filing."
      ],
      "example": "A warehouse inspection covers the full building and reports no asbestos. The owner uses the below-threshold/no-asbestos demolition notice route under § 61.145(a)(2), measured back from demolition.",
      "next": "Find the receiving agency and its demolition form.",
      "sources": [
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "EPA — Asbestos NESHAP overview and residential projects",
          "url": "https://www.epa.gov/asbestos/overview-asbestos-national-emission-standards-hazardous-air-pollutants-neshap"
        },
        {
          "name": "EPA — state asbestos contacts",
          "url": "https://www.epa.gov/asbestos/state-asbestos-contacts"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/demolition-or-renovation-notice/",
      "slug": "demolition-or-renovation-notice",
      "title": "Is partial demolition a renovation?",
      "answer": "Not necessarily. Under the federal definitions, wrecking or taking out any load-supporting structural member is demolition, even if most of the building stays. Alterations without that structural change generally fall under renovation. Intentional burning of a facility also counts as demolition.",
      "steps": [
        "Have the design team identify any load-supporting members in the scope.",
        "Mark the affected areas on the plans and match them to the inspection.",
        "Confirm the classification with the receiving program rather than relying on the name of the building permit."
      ],
      "example": "A retail remodel removes one load-bearing column and keeps the façade. The owner asks for the demolition notice route rather than treating the whole job as an interior renovation.",
      "next": "Send the structural scope and inspection coverage to the air-program contact.",
      "sources": [
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        },
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/inspection-before-quantity-thresholds/",
      "slug": "inspection-before-quantity-thresholds",
      "title": "Do small quantities mean an inspection is unnecessary?",
      "answer": "No. For an affected facility under § 61.145(a), the thorough inspection comes before the applicability decision. The renovation quantity test concerns regulated asbestos-containing material (RACM) expected to be disturbed, not a guess about the whole building.",
      "steps": [
        "Give the qualified inspector the current affected-area plans, including preparatory work.",
        "Request the report’s material classifications, quantities, locations and scope limitations. Include nonfriable materials in the inspection review.",
        "Have the project professional relate the findings to the planned disturbance; then evaluate federal and local notice triggers."
      ],
      "example": "A report covers 90 square feet of affected ceiling but excludes a newly added service chase. The owner requests review of the chase instead of treating 90 square feet as the full project estimate.",
      "next": "Resolve inspection gaps before entering the final quantity totals.",
      "sources": [
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "EPA — Asbestos NESHAP overview and residential projects",
          "url": "https://www.epa.gov/asbestos/overview-asbestos-national-emission-standards-hazardous-air-pollutants-neshap"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/linear-area-volume-asbestos-quantities/",
      "slug": "linear-area-volume-asbestos-quantities",
      "title": "Which materials go in the linear, area and volume boxes?",
      "answer": "Use linear feet for pipe material and square feet for other facility components. Cubic feet apply only to material off facility components when its length or area could not previously be measured. A container’s capacity is not a substitute for available original measurements.",
      "steps": [
        "Keep each inspection entry in its original dimensional basis and identify which entries are RACM affected by this work.",
        "Sum like units across the applicable project. Compare each subtotal independently with 260 linear feet, 160 square feet or 35 eligible cubic feet.",
        "Equality meets the threshold. Never add feet to square feet or treat an unknown quantity as zero."
      ],
      "example": "Two affected ceiling areas of 85 and 75 square feet total 160 square feet and meet the area threshold. Another 40 linear feet on pipes stays in the pipe subtotal; the project is not “200 feet.”",
      "next": "Enter the inspection entries in the quantity worksheet.",
      "sources": [
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/residential-asbestos-notice-scope/",
      "slug": "residential-asbestos-notice-scope",
      "title": "Does the small-residential exclusion cover this project?",
      "answer": "The federal facility definition excludes residential buildings with four or fewer dwelling units, but a unit count alone does not settle coverage. An installation, former regulated use, or larger redevelopment can change the result. State and local rules may cover a home the federal rule excludes.",
      "steps": [
        "List each building’s current and previous use and its dwelling-unit count.",
        "Identify the full site, related structures, project purpose, and whether the buildings are under common ownership or operational control.",
        "Give these facts to the air program and ask it to confirm both federal coverage and any separate local residential notice."
      ],
      "example": "A developer plans to demolish three duplexes on one site for a shopping center. The project team describes the entire controlled site to the regulator instead of treating each duplex as a separate exemption.",
      "next": "Keep the full site plan and the agency’s applicability response with the file.",
      "sources": [
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        },
        {
          "name": "EPA — Asbestos NESHAP overview and residential projects",
          "url": "https://www.epa.gov/asbestos/overview-asbestos-national-emission-standards-hazardous-air-pollutants-neshap"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/count-asbestos-notice-working-days/",
      "slug": "count-asbestos-notice-working-days",
      "title": "Which weekdays and holidays count?",
      "answer": "For the federal asbestos rule, working days are Monday through Friday, including holidays on those days. Do not assume the state’s clock matches: MassDEP’s AQ 06 instructions, for example, exclude holidays.",
      "steps": [
        "Identify the applicable notice category and first relevant activity. Ordinary planned work, annual notifications and urgent cases have different triggers.",
        "For an ordinary federal 10-working-day comparison, move backward from the work date without counting the work date itself.",
        "Check the receiving program’s calendar and submission method. A closed office may count as a federal working day but be unavailable for hand delivery."
      ],
      "example": "For a Monday, January 11, 2027 start, counting ten federal working days back gives Monday, December 28, 2026. If a separate ten-day clock excludes January 1 and December 25, that comparison gives Thursday, December 24.",
      "next": "Record the governing calendar, delivery cutoff and receipt alongside the planning date.",
      "sources": [
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        },
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "MassDEP — AQ 06 filing and holiday-count instructions",
          "url": "https://www.mass.gov/doc/instructions-aq-06-constructiondemolition-notification/download"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/amend-asbestos-notice-start-date/",
      "slug": "amend-asbestos-notice-start-date",
      "title": "What if the start moves earlier or later?",
      "answer": "For work covered by § 61.145(b)(3)(iv), a delay and an acceleration follow different rules. Do not just edit the crew calendar. Work must not begin on a date other than the one in the written updated notice.",
      "steps": [
        "For a delay, call the agency as soon as possible before the original start; provide the written new date as soon as possible before and no later than the original start.",
        "For an earlier start, provide written notice at least ten federal working days before the new start of the covered activity. Check local filing rules too.",
        "Link the update to the original notice. Review other changes as well: the federal rule calls for updating as necessary, including when the affected asbestos amount changes by at least 20 percent."
      ],
      "example": "A demolition originally noticed for April 12 moves to April 19. The filer calls before April 12, submits the written revision no later than April 12, and gives the owner the revised date and filing record.",
      "next": "Reconcile the owner’s, contractor’s and agency’s copies of the schedule.",
      "sources": [
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/ordered-demolition-emergency-renovation-notice/",
      "slug": "ordered-demolition-emergency-renovation-notice",
      "title": "When is an ordered demolition or emergency renovation different?",
      "answer": "A qualifying ordered demolition requires a state or local government order based on structural unsoundness and danger of imminent collapse. Emergency renovation is a separate category for a sudden, unexpected event requiring immediate action for specified safety, equipment or financial reasons. Neither is a general waiver.",
      "steps": [
        "For an ordered demolition, obtain the order and identify the issuing official, authority, order date and ordered start date.",
        "For an emergency renovation, record the event time, why an immediate response is necessary and the estimated RACM affected by the response.",
        "Contact the agency immediately. The qualifying federal branch calls for notice as early as possible before, but no later than the following working day. Confirm the local route and retain proof."
      ],
      "example": "A fire official acting for the city orders demolition because a wall is unsound and in danger of imminent collapse. The owner includes the order with the notice. A contractor’s request to meet a tenant deadline would not establish the same basis.",
      "next": "Give the authority the order or event facts instead of using the ordinary planner as a waiver.",
      "sources": [
        {
          "name": "40 CFR § 61.141 — definitions",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.141"
        },
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "EPA Region 1 — exceptions to advance notice",
          "url": "https://www.epa.gov/system/files/documents/2022-08/less-than-10-day-notification-9-14-2017.pdf"
        }
      ]
    },
    {
      "kind": "guides",
      "topic": "Demolition notices",
      "url": "https://cleanpermit.com/guides/owner-handoff-asbestos-notice-records/",
      "slug": "owner-handoff-asbestos-notice-records",
      "title": "What should the owner get back from the filer?",
      "answer": "Ask for a record that connects the inspected scope, the notice actually sent, its delivery, and the dates the team is using. Hiring a filer does not make an owner or operator’s obligations disappear.",
      "steps": [
        "Assign a named person to confirm recipients, submit notices and monitor changes; record how the owner can reach them.",
        "Ask for the actual form, not a draft: match its owner/operator, site address, inspection, quantities and start/finish dates to the work order. Collect the attachments, submission ID and dated delivery evidence. In Massachusetts the AQ 06 instructions link to the Asbestos Project Lookup to confirm submission.",
        "Keep each amendment with the earlier version. Reconcile dates, site address and scope with the field team; distinguish a submission receipt from a permit or permission to start."
      ],
      "example": "The contractor sends an owner an email saying “filed.” The owner obtains the actual form and portal receipt, spots that the notice lists the original start, and asks the filer to document the date revision before scheduling the crew.",
      "next": "Name the person who will notify all parties if scope, quantities or dates change again.",
      "sources": [
        {
          "name": "40 CFR § 61.145 — applicability, notices and updates",
          "url": "https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-61/subpart-M/section-61.145"
        },
        {
          "name": "MassDEP — AQ 06 construction/demolition notice",
          "url": "https://www.mass.gov/how-to/file-an-aq-06-constructiondemolition-notification"
        },
        {
          "name": "MassDEP — AQ 04 asbestos removal notice",
          "url": "https://www.mass.gov/how-to/file-an-aq-04-anf-001-asbestos-removal-notification"
        }
      ]
    }
  ]
}