How to approach it
- Describe the project purpose in terms of the need being met. Compare feasible locations, layouts and construction approaches on the same base map, including a no-build baseline where useful.
- Document both the reason for changing or rejecting an option and the evidence: site restrictions, logistics, cost assumptions, access or safety. Compare equivalent resource types, units and study limits.
- For the retained concept, tie each minimization measure to a revised measurement or a construction detail. Discuss residual effects and any compensation with the reviewing authority; do not subtract proposed credits from the physical footprint.
Worked example
Moving a lift station uphill avoids W-1 entirely. Narrowing its access into W-2 reduces the remaining footprint from 800 to 500 ft². Those are two different design decisions worth recording separately.
Next step
Attach before-and-after drawings to the alternatives log so that another reviewer can reproduce each change.