Wetlands & crossings
Measure impacts and compare crossing alternatives.
Tools
Aquatic impact quantity worksheet
Separate temporary-only and permanent footprints on one mapped feature. Reconcile shared ground without counting it twice.
Open tool Tool / Wetlands & crossingsWetland permit application packet checker
Identify the office to contact and prepare a cover note with the proposed work, exhibits, and questions the reviewer still needs answered.
Open tool Tool / Wetlands & crossingsCrossing alternatives comparison
Compare two designs on the same crossing. See which footprints shrink, which grow and which measurements are still missing.
Open toolGuides
How do I measure impact where a temporary mat overlaps permanent fill?
Measure both work footprints inside the aquatic resource, then measure their intersection. Keep the gross temporary area for construction planning, but subtract the overlap when reporting temporary-only area. A unique disturbance footprint is not necessarily a permanent loss.
Open guide Guide / Wetlands & crossingsWhat does a desktop wetland screen tell me that a delineation or JD does not?
A desktop screen tells you where to investigate. A delineation maps resources using site evidence. A Corps approved jurisdictional determination (JD) addresses federal jurisdiction for the area it describes. None of these is permission to build.
Open guide Guide / Wetlands & crossingsWhich drawings let a reviewer reconstruct my wetland impact table?
Use a vicinity map to locate the site, a scaled plan to show the footprint, and sections to show what changes vertically. Carry one feature ID from plan to section to quantity table.
Open guide Guide / Wetlands & crossingsWhy does one crossing raise both Section 404 and Section 401 questions?
Section 404 addresses discharges of dredged or fill material into waters of the United States. Section 401 addresses water quality certification for a federal license or permit for an activity that may result in a discharge. A certification is not a fill permit.
Open guide Guide / Wetlands & crossingsIs a pre-construction notification the same thing as a nationwide permit?
No. A nationwide permit (NWP) is a general permit for a described category of activities. A pre-construction notification (PCN) supplies project information for district review when the applicable terms or conditions require it. Filing the notice does not by itself authorize work.
Open guide Guide / Wetlands & crossingsHow can a design log show avoidance rather than just mitigation promises?
Show where an option moves work out of a resource, then show how the remaining work becomes smaller or less harmful. Compensation addresses residual effects; it does not replace that comparison.
Open guide Guide / Wetlands & crossingsWhat should I survey before proposing a replacement culvert?
Survey the crossing and the stream on both sides, not just the pipe diameter. Reviewers need to see the existing barrier, proposed bed profile and the temporary work needed to install the replacement.
Open guide Guide / Wetlands & crossingsWhere do I send a wetland permit application: the Corps or the state?
Start with the discharge location, not the applicant’s address. The Corps generally handles federal fill permits; Michigan and New Jersey handle Section 404 for assumed waters, but the Corps retains others. Independent wetland, shoreline or buffer approvals may apply even where no federal fill permit is needed.
Open guide Guide / Wetlands & crossingsCan I use an older verification letter after the design or schedule changes?
Read the letter with its referenced plan, permit edition and conditions. The verified activity and relevant dates matter; the presence of a letter or a date on an old plan does not settle whether revised work is covered.
Open guide