Where do I send a wetland permit application: the Corps or the state?

Start with the discharge location, not the applicant’s address. The Corps generally handles federal fill permits; Michigan and New Jersey handle Section 404 for assumed waters, but the Corps retains others. Independent wetland, shoreline or buffer approvals may apply even where no federal fill permit is needed.

How to approach it

  1. Locate the work, access and discharge points. Ask the relevant offices about independent wetland and buffer rules, floodplain or shoreland review, and whether local approvals are separate.
  2. Pin the proposed discharge on the Corps regulatory office map. In Michigan start with EGLE’s joint application in MiEnviro; in New Jersey ask NJDEP Land Resource Protection which checklist and which waters apply. In Florida the federal Section 404 inquiry currently goes to the Corps; the state ERP is separate.
  3. Record the office, named water, plan revision, application route and reference number for each review. For a federal permit, check the Section 401 certification separately. Ask what the joint process forwards rather than filing the same exhibits twice.

Worked example

A federal letter addresses the wetland in a proposed driveway footprint. It says nothing about the equipment turnaround in a locally regulated buffer. Keep the turnaround on the local review map.

Next step

Request written confirmation of each office’s scope and record which parts of the plan its response actually covers.