Wetland permit application packet checker

Identify the office to contact and prepare a cover note with the proposed work, exhibits, and questions the reviewer still needs answered.

Need an office or a project packet?

If you need a federal contact, pin the project location on the Corps office map. Use this checklist to prepare drawings and questions, including whether a state office handles the application. A map pin is not a wetland determination.

USACE · Find the regulatory office by address or map pin

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

For Tribal lands or an uncertain boundary, select that option rather than the surrounding state.
Give a project label, county/state and nearest public crossing or coordinates.
A role or organization is enough for this draft; add official contact details in the agency form.
Name the resource. Include dimensions, duration, material, and temporary versus permanent impacts; mark unmeasured quantities unknown.
List the actual files or sheets; for example: W-2 survey, sheet C-4 rev B, impact table dated June 4.

Worked example

For a Michigan road crossing, start with EGLE’s joint application. If mats are on sheet C-4 but missing from the impact table, identify that sheet and the missing quantity before handing the packet to the signer.

See the result for the example inputs
  1. Draft cover note — Mill Road crossing, Ingham County, MI (example). Requested review: State or joint application.
  2. Applicant / signer: Example road department; signer to confirm
  3. Start with Michigan EGLE Water Resources Division. Use the EGLE/USACE Joint Permit Application through MiEnviro. Ask whether the water is state-assumed or Corps-retained; the joint application supports simultaneous review where needed: https://www.michigan.gov/egle/about/organization/water-resources/joint-permit-application
  4. Receiving office / agency file: not confirmed — record the office and file number, if assigned, before submitting.
  5. Proposed work: Restore road access at W-2. Place 400 ft² of permanent approach fill. Temporary mat limits are on C-4; temporary-only area and duration not yet confirmed.
  6. Exhibit list: W-2 field survey; plan C-4 rev B; restoration sequence rev B.
  7. Marked assembled by preparer: Resource boundaries and site location; Construction and restoration sequence.
  8. Missing: Impact and fill quantities — Cross-reference temporary and permanent areas to drawing IDs. Keep stream length, fill volume and excavation volume in separate columns.
  9. Draft: Existing and proposed drawings — Attach readable plan and section sheets showing the same footprint IDs, access areas and revision date.
  10. Draft: Purpose and design alternatives — State the need without prescribing one design; record the changes tested and the impact each would avoid.
  11. Not checked: Agency forms and local instructions — Identify the receiving office and current submittal instructions. Verify forms, signatures and certification contacts for this location.
  12. Ask the receiving office for the current joint or state form and fee schedule. Record who forwards it to the Corps, if anyone, and which decisions require separate requests. Do not send a duplicate federal application by default.
  13. Before signing: check the office checklist, applicant or agent authority, and whether a federal permit needs Section 401 certification or waiver. Record any independent state, Tribal or local decision. This cover note is not a signed application or permission to work.
Next on this task

Guides for this worksheet

Guide / Wetlands & crossings

Which drawings let a reviewer reconstruct my wetland impact table?

Use a vicinity map to locate the site, a scaled plan to show the footprint, and sections to show what changes vertically. Carry one feature ID from plan to section to quantity table.

Open guide
Guide / Wetlands & crossings

What does a desktop wetland screen tell me that a delineation or JD does not?

A desktop screen tells you where to investigate. A delineation maps resources using site evidence. A Corps approved jurisdictional determination (JD) addresses federal jurisdiction for the area it describes. None of these is permission to build.

Open guide
Guide / Wetlands & crossings

Why does one crossing raise both Section 404 and Section 401 questions?

Section 404 addresses discharges of dredged or fill material into waters of the United States. Section 401 addresses water quality certification for a federal license or permit for an activity that may result in a discharge. A certification is not a fill permit.

Open guide
Guide / Wetlands & crossings

Is a pre-construction notification the same thing as a nationwide permit?

No. A nationwide permit (NWP) is a general permit for a described category of activities. A pre-construction notification (PCN) supplies project information for district review when the applicable terms or conditions require it. Filing the notice does not by itself authorize work.

Open guide
Guide / Wetlands & crossings

Where do I send a wetland permit application: the Corps or the state?

Start with the discharge location, not the applicant’s address. The Corps generally handles federal fill permits; Michigan and New Jersey handle Section 404 for assumed waters, but the Corps retains others. Independent wetland, shoreline or buffer approvals may apply even where no federal fill permit is needed.

Open guide
Guide / Wetlands & crossings

Can I use an older verification letter after the design or schedule changes?

Read the letter with its referenced plan, permit edition and conditions. The verified activity and relevant dates matter; the presence of a letter or a date on an old plan does not settle whether revised work is covered.

Open guide

All wetlands & crossings resources →