What does a desktop wetland screen tell me that a delineation or JD does not?

A desktop screen tells you where to investigate. A delineation maps resources using site evidence. A Corps approved jurisdictional determination (JD) addresses federal jurisdiction for the area it describes. None of these is permission to build.

How to approach it

  1. Compare imagery, soils, terrain and inventory layers. Note coverage and image dates; a blank map polygon is not evidence of dry ground.
  2. Have a qualified practitioner document field boundaries and methods, including wetland vegetation, soils and hydrology under the appropriate regional methods. Retain data sheets, photographs and survey limits.
  3. Ask the district which product answers your question. A boundary concurrence addresses location, not jurisdiction. A preliminary JD is advisory and does not establish that a feature is nonjurisdictional; an approved JD is the formal determination.

Worked example

An inventory map is blank beside a proposed loading bay, but a low swale is visible on the grading survey. Put the swale in the field study area instead of labeling it upland.

Next step

Send the district the study boundary and the decision you need before commissioning a specific type of request.