How to approach it
- Show site coordinates, access, waterbody names and a north arrow. On the site plan, label existing resource boundaries, their source and the date they were mapped.
- Distinguish existing and proposed features. Hatch temporary work separately from permanent fill; dimension what lies inside each resource and label section cut lines.
- At each cut, show existing ground or streambed, proposed grade, reference elevation and datum, material and thickness. Note scale, units and revision on each sheet; test readability at submission size.
Worked example
Table row W-3 lists 32 yd³ of rock. Section B–B shows the keyed toe below the bank surface; the plan ties B–B to the shaded 40 ft bank segment. A reviewer can now check what the estimate includes.
Next step
Have someone trace one table row back to its plan and section without the designer’s help.