Air permit equipment change worksheet

Compare existing and proposed equipment. Get separate questions for the air construction permit decision and the operating permit file.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Enter 0 only for a new unit.
For planning only; an expected schedule is not an enforceable limit.
List relevant conditions, or enter “not yet identified”.
Identify the source of the ratings, fuel/materials, controls, and any other affected units.

Worked example

Replacing a 70-gal/h booth with a 95-gal/h booth adds 25 gal/h of nameplate capacity. That is not a 25 lb/h emissions increase; the reviewer also needs composition, capture and operating data.

See the result for the example inputs
  1. Replacement: Coating bay CB-2, east fabrication hall. Equipment: Coating or solvent process.
  2. Nameplate comparison: 70 → 95 gal/h material throughput; change +25 gal/h material throughput. This is capacity, not a pollutant emission rate.
  3. Expected schedule: 2400 h/yr (planning assumption only). Basis and open questions: Vendor spray delivery ratings. Solventborne coating, same booth filters; old booth removal timing not confirmed.
  4. Permit file to retrieve: Operating permit, coating table; construction file under review.
  5. Document when the old unit will be disconnected, whether both could run at once, and how retirement will be verified. Do not subtract its emissions automatically.
  6. Request as-applied coating and thinner composition, cleaning usage, maximum application rate, capture evidence, and the destination of used solvent.
  7. Construction permit: send the project scope, before/after pollutant rates, and proposed installation date. Ask which work counts as beginning construction, whether major or minor New Source Review applies, and what authorization must be in hand before that work.
  8. Operating permit: mark the affected unit list, limits, monitoring and reporting conditions in the issued Title V permit. Ask whether a notice or revision is needed, when to file it, and whether the change must wait for approval.
  9. Before startup: check the construction authorization itself for operating limits, control checks, initial tests and notifications. Record the authority’s answer and due date for each; neither this worksheet nor a pending application is permission to build.