CleanPermit
Guide / Air & equipment

Evaluate a coating or solvent substitution

A lower VOC label does not establish a lower HAP rate or compliance with the existing permit. Compare the old and new systems as applied, including thinning, hardeners and cleanup, on the same production basis.

How to approach it

  1. Obtain dated safety and technical data sheets plus supplier composition or test data. Check whether each value is as supplied, as mixed, per gallon of material, or on a less-water/exempt-compounds basis.
  2. For an ingredient mass balance, multiply gallons by product density and ingredient weight fraction. Identify retained, recovered or destroyed material only with support; assess VOC and each listed HAP separately. A Method 24 result is not HAP speciation.
  3. Check the application rate required for equivalent production, mix ratios, cleanup frequency, approved materials, control performance and permit notification or approval conditions.

Worked example

At 100 gal/month, 8 lb/gal and 5% toluene by weight, the old mix contains 40 lb/month of toluene. A substitute at 120 gal/month, 9 lb/gal and 2% contains 21.6 lb/month. Those are input masses, and estimates of emitted mass only if the toluene all evaporates with no recovery or control.

Next step

For a substitution on unchanged equipment, enter the same nameplate rating on both sides of the change worksheet. Attach the as-applied VOC and HAP comparison; zero capacity change does not mean zero emissions change.

Next on this task

Use the worksheet

All air & equipment resources →