Drainage and outfall path worksheet
Follow one drainage area from disturbed ground to its site exit and downstream destination. Keep unknown connections visible.
Worksheet
Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.
Your worksheet result
Worked example
Runoff from the south pad enters inlet I-4. A utility sketch shows pipe P-6 but not its outlet. Keep the receiving water unknown until the connection is checked.
See the result for the example inputs
- Route: South pad, DA-2 → South curb inlet I-4 → Pipe P-6; outlet not shown → receiving water: Unknown.
- Trace status: Partially traced. Evidence and next check: Utility sketch sheet 3; request downstream as-built from storm sewer owner.
- Ask the system owner for the downstream asset map. Match inlet and outfall IDs; a property-line inlet is not automatically the final outfall.
- Keep the unresolved part dashed on the map. Do not substitute the nearest mapped water or interpret an incomplete trace as no discharge.
Guides for this worksheet
Where does runoff go after it enters a storm drain?
An inlet is a waypoint, not proof of the receiving water. Follow each drainage area through its site discharge point, pipes, ditches or ponds to the water that receives the discharge. A municipal separate storm sewer system (MS4) can carry runoff well beyond the nearest stream.
Open guide Guide / Construction coverageWhat should a construction stormwater site map show?
A useful site map lets a new inspector locate disturbed ground, follow runoff and find the control that protects each discharge point. An architectural plot plan alone rarely answers those questions. EPA CGP Part 7.2.4 provides a detailed list; use the applicable permit’s list as the final check.
Open guide