Construction coverage
Screen acreage and document who controls the work.
Tools
Disturbed acreage calculator
Measure distinct disturbance on your site, then check it against one acre with any additional ground in the same plan of development or sale.
Open tool Tool / Construction coverageOperator-role worksheet
Record who can change the plans and who can direct compliance work, one entity and phase at a time.
Open tool Tool / Construction coverageDrainage and outfall path worksheet
Follow one drainage area from disturbed ground to its site exit and downstream destination. Keep unknown connections visible.
Open toolGuides
Do I need a SWPPP for less than one acre?
Possibly. For a lot under one acre, first ask how much land the whole common plan of development or sale will ultimately disturb. If that total reaches one acre, a construction stormwater discharge can require coverage even for a small lot. Where the EPA Construction General Permit (CGP) applies, an operator seeking coverage prepares a SWPPP before filing a Notice of Intent. If the entire plan is smaller, check for an agency designation and separate local requirements rather than assuming an exemption.
Open guide Guide / Construction coverageDo staging yards and access roads count as disturbed land?
Look at what happens to the ground, not what the plan calls the space. Stripping a temporary equipment pad or grading a new haul road changes the footprint even if it is restored later. Using existing pavement without altering it presents a different acreage question; materials stored there can still affect runoff.
Open guide Guide / Construction coverageHow do you measure overlapping phases without counting land twice?
Measure the ground disturbed at least once over the plan’s life. This combined footprint differs from both the sum of all phase totals and the largest area exposed at one time. Keep those figures separate: temporary stabilization or a repeat excavation changes the work history, not the location of the ground.
Open guide Guide / Construction coverageWho is the operator when the owner, builder and contractor differ?
Under EPA’s construction permit, either of two kinds of control matters: authority to change construction plans and specifications, or day-to-day authority over the activities needed to meet permit conditions. More than one entity can have control. A job title, inspection assignment or promise to pay a fee does not settle the question.
Open guide Guide / Construction coverageWhere does runoff go after it enters a storm drain?
An inlet is a waypoint, not proof of the receiving water. Follow each drainage area through its site discharge point, pipes, ditches or ponds to the water that receives the discharge. A municipal separate storm sewer system (MS4) can carry runoff well beyond the nearest stream.
Open guide Guide / Construction coverageWhat is the difference between a SWPPP, an NOI and authorization?
The Stormwater Pollution Prevention Plan (SWPPP) describes site conditions, controls and who will implement them. A Notice of Intent (NOI) is an operator’s filing for general permit coverage. Authorization is the effective coverage under the issuing agency’s rules. A finished plan or submission receipt is not the same thing as an effective authorization.
Open guide Guide / Construction coverageWhat evidence supports a small construction waiver?
A dry forecast or short grading schedule is not a waiver. First check whether the issuing authority offers one and which rules apply to the whole common plan. EPA Appendix C describes distinct low rainfall erosivity, approved TMDL and equivalent-analysis routes for small construction; the evidence for one does not establish another.
Open guide Guide / Construction coverageWhat should a construction stormwater site map show?
A useful site map lets a new inspector locate disturbed ground, follow runoff and find the control that protects each discharge point. An architectural plot plan alone rarely answers those questions. EPA CGP Part 7.2.4 provides a detailed list; use the applicable permit’s list as the final check.
Open guide Guide / Construction coverageWhat changes when the footprint, operator or receiving water changes?
Keep three records in view: what changed in the field, what the current SWPPP shows and what the operator reported on its NOI. Updating one does not automatically update the others. Replacing an operator is different from correcting the same entity’s name.
Open guide