Find the asbestos demolition notification form for your job site

Get official filing links for Massachusetts and selected California routes. Elsewhere, find the NESHAP contact who can confirm the form. There is no single filing portal for every U.S. job.

Which agency takes the notice?

Start with the project location, not the contractor’s address. If the finder only returns a contact, ask which office and form cover that site before sending notice. A directory entry is not proof of filing.

EPA — state asbestos contacts

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Use the location of the building, not the contractor. In California choose a confirmed district only after checking the exact address; some counties span two districts.

Worked example

A Massachusetts warehouse with abatement before demolition uses the AQ 06 instructions for the demolition notice and the AQ 04 instructions for the separate removal notice. Both lead to eDEP, not a downloadable form to mail.

See the result for the example inputs
  1. Open MassDEP AQ 06 for the construction/demolition notice. Submit online via the eDEP link in the instructions. MassDEP says an applicable AQ 06 demolition filing satisfies the corresponding EPA notification; do not send a duplicate to EPA. Abatement is a separate AQ 04 (ANF-001) notice.
  2. https://www.mass.gov/how-to/file-an-aq-06-constructiondemolition-notification
  3. https://www.mass.gov/how-to/file-an-aq-04-anf-001-asbestos-removal-notification
  4. For a covered facility, a negative asbestos inspection does not cancel demolition notice. Bring the inspection method and findings, demolition start and finish, and the contingency if unexpected RACM is found.
  5. Confirm accepted delivery, due date, fee and revision procedure. Keep the submitted version and dated receipt. This lookup does not file a notice.