Does the small-residential exclusion cover this project?

The federal facility definition excludes residential buildings with four or fewer dwelling units, but a unit count alone does not settle coverage. An installation, former regulated use, or larger redevelopment can change the result. State and local rules may cover a home the federal rule excludes.

How to approach it

  1. List each building’s current and previous use and its dwelling-unit count.
  2. Identify the full site, related structures, project purpose, and whether the buildings are under common ownership or operational control.
  3. Give these facts to the air program and ask it to confirm both federal coverage and any separate local residential notice.

Worked example

A developer plans to demolish three duplexes on one site for a shopping center. The project team describes the entire controlled site to the regulator instead of treating each duplex as a separate exemption.

Next step

Keep the full site plan and the agency’s applicability response with the file.