How to approach it
- Have the design team identify any load-supporting members in the scope.
- Mark the affected areas on the plans and match them to the inspection.
- Confirm the classification with the receiving program rather than relying on the name of the building permit.
Worked example
A retail remodel removes one load-bearing column and keeps the façade. The owner asks for the demolition notice route rather than treating the whole job as an interior renovation.
Next step
Send the structural scope and inspection coverage to the air-program contact.