Build a one-pollutant worksheet from maximum hourly rates. Compare full-year capacity with a documented hours scenario, unit by unit.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Count independent emissions once. Do not list both a stack and the same emissions at its inlet.
One line per unit: unit ID | rate | lb/h or kg/h | hours/year | rate source and control basis | hours basis. Enter “full year” for 8760 hours; for fewer hours use “limit: condition; averaging period” for a restriction assumed enforceable. Do not enter expected shifts.

Worked example

At 1.5 lb/h, a curing oven emits 6.57 short tons at 8,760 hours, or 2.25 short tons at a documented 3,000-hour cap.

See the result for the example inputs
  1. VOC worksheet — Oven 1 and independent flash-off station; no control credit.
  2. OV-1: 1.5 lb/h = 1.5 lb/h × 3000 h/yr ÷ 2,000 lb/short ton = 2.25 short tons/yr. At 8,760 h: 6.57 short tons/yr. Rate basis: Rated feed × maximum VOC content; uncontrolled. Hours basis: limit: Illustrative permit condition A4; rolling 12 months.
  3. FL-1: 0.4 lb/h = 0.4 lb/h × 8760 h/yr ÷ 2,000 lb/short ton = 1.752 short tons/yr. At 8,760 h: 1.752 short tons/yr. Rate basis: Maximum material balance; uncontrolled. Hours basis: full year.
  4. At 8,760 h/year on the entered rate basis: 8.322 short tons/yr of VOC. Entered hours scenario: 4.002 short tons/yr.
  5. These totals assume all listed rates can occur together. No extra control reduction was applied. Verify maximum rates, enforceability of all credited restrictions and controls, and omitted units with the permitting authority before using either total as PTE.