Potential-to-emit workbook
Build a one-pollutant worksheet from maximum hourly rates. Compare full-year capacity with a documented hours scenario, unit by unit.
Worksheet
Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.
Your worksheet result
Worked example
At 1.5 lb/h, a curing oven emits 6.57 short tons at 8,760 hours, or 2.25 short tons at a documented 3,000-hour cap.
See the result for the example inputs
- VOC worksheet — Oven 1 and independent flash-off station; no control credit.
- OV-1: 1.5 lb/h = 1.5 lb/h × 3000 h/yr ÷ 2,000 lb/short ton = 2.25 short tons/yr. At 8,760 h: 6.57 short tons/yr. Rate basis: Rated feed × maximum VOC content; uncontrolled. Hours basis: limit: Illustrative permit condition A4; rolling 12 months.
- FL-1: 0.4 lb/h = 0.4 lb/h × 8760 h/yr ÷ 2,000 lb/short ton = 1.752 short tons/yr. At 8,760 h: 1.752 short tons/yr. Rate basis: Maximum material balance; uncontrolled. Hours basis: full year.
- At 8,760 h/year on the entered rate basis: 8.322 short tons/yr of VOC. Entered hours scenario: 4.002 short tons/yr.
- These totals assume all listed rates can occur together. No extra control reduction was applied. Verify maximum rates, enforceability of all credited restrictions and controls, and omitted units with the permitting authority before using either total as PTE.
Guides for this worksheet
Potential to emit versus actual emissions
Actual emissions describe what happened during a stated period. Potential to emit (PTE) asks how much the source could emit under its physical and operational design, considering only limits that qualify under the applicable program. A quiet year changes the first number, not necessarily the second.
Open guide Guide / Air & equipmentConvert pounds per hour to short tons per year
Multiply an emission rate in pounds per hour by operating hours per year, then divide by 2,000 pounds per US short ton. The conversion is simple; choosing a rate and time period that belong together is the important part.
Open guide Guide / Air & equipmentChoose an emission factor that fits the process
An emission factor relates pollutant mass to an activity such as heat input or material processed. EPA notes that AP-42 factors generally describe averages across sources, not guaranteed maximums, permit limits, or proof of compliance.
Open guide Guide / Air & equipmentWhen can an hours limit change a PTE estimate?
A production forecast, staffing plan, or verbal promise is not an enforceable operating restriction. Under Part 70, a restriction counted as part of design must meet the definition in § 70.2. Practical enforceability also depends on whether compliance can be determined from the terms and records.
Open guide