CleanPermit
Guide / Air & equipment

Choose an emission factor that fits the process

An emission factor relates pollutant mass to an activity such as heat input or material processed. EPA notes that AP-42 factors generally describe averages across sources, not guaranteed maximums, permit limits, or proof of compliance.

How to approach it

  1. Start with the permit or inventory instructions: they may specify a test, material balance, or factor. Compare any candidate factor with source-specific performance data.
  2. Match the pollutant, process, fuel, operating load, measurement boundary, and control status. Record the table, version, units and limitations. Do not apply a removal percentage to a factor already measured after control.
  3. Cancel the activity units explicitly. If a permit decision depends on a maximum rather than an average, ask what maximum-rate evidence is acceptable.

Worked example

An illustrative uncontrolled factor of 0.08 lb/MMBtu times 15 MMBtu/h yields 1.2 lb/h. Multiplying that factor by 15 cubic feet/h would leave mismatched units; obtain the fuel heating value first. The example factor is not a recommended value.

Next step

Attach the exact factor entry and the activity data, not just a link to the AP-42 homepage.

Next on this task

Use the worksheet

All air & equipment resources →