How to approach it
- Draw a boundary around the units contributing to this pollutant. Identify shared exhausts so the same release is not counted at both the process and the stack.
- For actuals, match production, fuel or material records to the period and use emission data representative of those operations. Explain missing records rather than treating them as zero.
- For PTE, assemble maximum feasible throughput, emitting modes and hours. Flag any bottleneck, control or permit limit separately with evidence of its effect and enforceability.
Worked example
A line emitted VOC at an estimated 2 lb/h for 900 recorded hours: 1,800 lb, or 0.9 short ton actual. Its maximum rate is 3 lb/h. With no qualifying restriction and continuous capacity, 3 × 8,760 ÷ 2,000 gives 13.14 short tons/yr, not 0.9.
Next step
Put the records-based inventory and the maximum-capacity worksheet side by side; label the basis of every rate.