CleanPermit
Tool / Oil storage & SPCC

SPCC secondary containment calculator for a rectangular berm

Check a flat, rectangular berm around stationary aboveground bulk oil storage. Compare measured space with the largest tank release plus rain, and see the gallons short or left over. This is not the sizing test for a transfer rack or production site.

Is gross berm volume enough?

Compare the largest tank release with the usable space after obstructions, standing liquid and the design rainfall. Use the measured geometry below for a rectangular enclosure; EPA also provides worksheets for other configurations.

EPA — Secondary containment worksheets

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Measure wall to wall inside the berm; do not subtract tank widths here if you enter their displacement below.
Use a level, rectangular footprint.
Measure floor to the lowest overflow point, not the tallest wall.
Include surviving tank portions, foundations and supports that occupy space in the release scenario. Enter 0 only if verified.
Enter measured existing liquid, or 0 if dry.
Use storm depth in inches, not an hourly rate. Record the source, location, duration and recurrence interval in the plan file. Zero assumes precipitation and run-on are excluded.
Typically the inside footprint plus any run-on or roof area draining into it; do not count the same area twice.
For this shared containment area, not the volume normally delivered.

Worked example

A 20 × 15 ft berm with 2 ft of usable height has about 4,488 gal gross. Subtract 40 ft³ of obstructions, 100 gal of standing water and 3 in of rain over 300 ft²: about 3,528 gal remains for a 3,500 gal release.

See the result for the example inputs
  1. Volume margin: 28.052 US gal beyond the entered release and rainfall. Verify the berm, drainage controls and assumptions in the field.
  2. Gross: 20 ft × 15 ft × 2 ft = 600 ft³ = 4,488.312 US gal. Less 299.221 gal displacement and 100 gal standing liquid leaves 4,089.091 gal before rain.
  3. Rain reserve: 3 in ÷ 12 × 300 ft² × 7.481 gal/ft³ ≈ 561.039 US gal. Available for oil: 3,528.052 US gal; largest tank: 3,500 US gal.
  4. Required gross space: 3,500 gal oil + 561.039 gal rain + 299.221 gal displaced + 100 gal standing liquid = 4,460.26 US gal. Measured gross space: 4,488.312 US gal.
  5. After the full tank release, space remains for about 3.15 in of rain over the entered catchment (not wall height). Compare with the documented storm depth of 3 in.
  6. Assumes vertical sides, a flat floor, no leakage or pumping credit, and 1 ft³ = 1,728/231 US gal. Use site-specific engineering for sloped floors, irregular walls or connected cells. This is a volume check, not design certification.
Next on this task

Guides for this worksheet

All oil storage & spcc resources →