How to approach it
- Identify the rule that applies to the installation. Bulk storage sizing is not the same as the general containment test for transfer areas or oil-filled operating equipment.
- Start with net space, not a vendor’s nominal berm rating. Subtract displacement and existing water, then compare the remaining space to the largest shell plus the site’s precipitation volume.
- Check other applicable codes, permits, owner standards and access requirements separately. An additional percentage requirement does not replace the federal volume and precipitation check.
Worked example
A 1,000 gal tank sits in a berm with 1,100 gal available before rain. Two inches of rain over a 160 ft² catchment adds about 199 gal. The site needs about 1,199 gal for that scenario, leaving a 99 gal shortfall despite the 110% rating.
Next step
Document both the released oil and the rain load in gallons. If either quantity is unknown, do not close the containment review.