Guide / Oil storage & SPCC

Which containers belong in the oil inventory?

Start with every location that stores or uses oil, not just the tank farm. A 55 US gal drum counts at exactly 55; twenty 5 gal pails do not become a 100 gal container. Classify each item before adding its shell capacity.

Open guide
Guide / Oil storage & SPCC

Use shell capacity, not today’s oil level

Storage capacity is what the shell can hold, not the delivery limit, dipstick reading or amount left after a shift. A low-fill policy does not reduce the capacity entered in the inventory or the largest-tank containment check.

Open guide
Guide / Oil storage & SPCC

What discharge evidence changes the plan path?

Two decisions need different evidence: could oil reasonably reach water, and how much oil actually reached water in past events? A dry incident record does not rule out a future path to water. A large release kept on land is not automatically a disqualifying discharge.

Open guide
Guide / Oil storage & SPCC

Subtract what occupies space inside a berm

Length × width × wall height is gross space. Water and solids already inside share that space with a release. Count the volume of surviving equipment below the overflow elevation, not the nameplate capacity of every tank in the enclosure.

Open guide
Guide / Oil storage & SPCC

Is 110% containment always enough?

No. For stationary bulk oil storage under §112.8(c)(2), or animal fats and vegetable oils under §112.12(c)(2), the federal test is the entire capacity of the largest single container plus sufficient freeboard for precipitation. Ten percent is not a universal federal rain allowance or a substitute for checking the actual basin.

Open guide
Guide / Oil storage & SPCC

Turn a rainfall depth into a freeboard reserve

Freeboard is capacity kept available for precipitation, not an arbitrary strip of unused wall. Storm depth in inches divided by 12, multiplied by contributing square feet, gives cubic feet of water. Multiply by about 7.48052 for US gallons.

Open guide
Guide / Oil storage & SPCC

When can an operator use EPA’s Tier I template?

The Appendix G template is an option for a covered Tier I qualified facility, not a blank form any small business can sign. Under the ordinary screen, total aboveground capacity must be at most 10,000 US gal, every individual aboveground container at most 5,000 US gal, and the discharge-history test must be met.

Open guide
Guide / Oil storage & SPCC

Why farms need a separate SPCC screen

A farm under §112.2 is a tract devoted to producing crops or raising animals (including fish) that produced and sold, or normally would have produced and sold, at least $1,000 in agricultural products during a year. WRRDA §1049 changes the aboveground capacity and certification decisions for these operations.

Open guide
Guide / Oil storage & SPCC

What to update when a tank changes

Treat a replacement, move, new foundation or piping change as a reason to revisit the site’s discharge potential. Under §112.5(a), a change in design, construction, operation or maintenance that materially affects that potential triggers a plan amendment; do not wait for the five-year review.

Open guide