CleanPermit
Guide / Oil storage & SPCC

When can an operator use EPA’s Tier I template?

The Appendix G template is an option for a covered Tier I qualified facility, not a blank form any small business can sign. Under the ordinary screen, total aboveground capacity must be at most 10,000 US gal, every individual aboveground container at most 5,000 US gal, and the discharge-history test must be met.

How to approach it

  1. Confirm applicability, shell totals and the three-year discharge evidence before downloading EPA’s template. A farm must check its separate statutory path. Verify that state rules permit self-certification.
  2. Visit the facility. Fill in the container list and locations, potential drainage paths, controls, inspection and test schedules, response contacts and training assignments. Verify each statement against actual conditions rather than copying a completed example.
  3. Check the certifications under §112.6(a), including management commitment, implementation and no prohibited deviations. An equivalent alternative to Appendix G needs a cross-reference to the requirements. Do not sign a template that does not describe the site.

Worked example

A covered yard with two 5,000 gal tanks and clean qualifying history is exactly at both Tier I caps. Replacing them with a single 10,000 gal tank keeps the total unchanged but moves the ordinary screen to Tier II, which calls for a full plan rather than Appendix G alone.

Next step

Have the owner/operator review the completed plan against the site, commit resources and implement it. The worksheet and eligibility result are not a signed plan.

Next on this task

Use the worksheet

All oil storage & spcc resources →