SPCC qualified facility screen
Find the next federal SPCC plan path for an onshore, non-transportation-related oil facility. The screen keeps unknowns open and applies a separate farm branch.
Worksheet
Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.
Your worksheet result
Worked example
A service yard with 8,200 gal aboveground, a largest tank of 6,000 gal, a route to a creek and no qualifying discharges screens toward Tier II—not the Tier I template.
See the result for the example inputs
- Tier II candidate: the largest aboveground container exceeds 5,000 US gal. Prepare a full plan under §112.6(b); Appendix G alone is not sufficient.
- Self-certification is optional. Confirm state limits, site conditions and whether any measures require PE involvement. No plan is certified by this screen.
Guides for this worksheet
When can an operator use EPA’s Tier I template?
The Appendix G template is an option for a covered Tier I qualified facility, not a blank form any small business can sign. Under the ordinary screen, total aboveground capacity must be at most 10,000 US gal, every individual aboveground container at most 5,000 US gal, and the discharge-history test must be met.
Open guide Guide / Oil storage & SPCCWhy farms need a separate SPCC screen
A farm under §112.2 is a tract devoted to producing crops or raising animals (including fish) that produced and sold, or normally would have produced and sold, at least $1,000 in agricultural products during a year. WRRDA §1049 changes the aboveground capacity and certification decisions for these operations.
Open guide Guide / Oil storage & SPCCWhat discharge evidence changes the plan path?
Two decisions need different evidence: could oil reasonably reach water, and how much oil actually reached water in past events? A dry incident record does not rule out a future path to water. A large release kept on land is not automatically a disqualifying discharge.
Open guide