How to approach it
- Trace surface slope, storm drains and ditches to navigable waters or adjoining shorelines without counting dikes or other manmade barriers as protection. Save the drainage sketch and the basis for your determination.
- Review the three years before the intended certification date, or since becoming subject if operating less than three years. Record incident dates, quantities reaching water or shoreline, how they were estimated, and the evidence for any natural-disaster, war or terrorism exclusion.
- Look for a single discharge over 1,000 US gal or two each over 42 US gal within any rolling 12 months. A calendar-year break does not reset the test. If the destination or amount is unknown, do not check “no qualifying events.” These are not emergency notification thresholds.
Worked example
In November and the following February, 58 and 47 gal reached the same creek. Neither event alone exceeded 1,000 gal, but both exceeded 42 gal in a single 12-month period. A separate 200 gal loss fully recovered indoors contributes no gallons to that water total.
Next step
Keep cleanup records and receiving-water estimates with the eligibility file. For an active release, use the incident response and notification procedures immediately; do not wait to complete this screen.