How to approach it
- Read the manufacturer’s plate or tank record for shell gallons. Identify separate containers rather than adding today’s delivery tickets. If the plate is illegible, obtain a drawing or verified capacity before using the number.
- Keep current contents in the operating log, separate from the SPCC capacity register. Include in-service, standby and seasonal containers even when they are temporarily empty.
- Remove a permanently closed tank from the counted register only with evidence of the §112.2 closure conditions: remove liquid and sludge, disconnect and blank piping, close and lock non-vent valves, and post a dated closure sign.
Worked example
A shop normally stops filling its 2,000 gal tank at 1,500 gal. The gauge shows 380 gal today. Enter 2,000 gal for the screen and the bulk storage containment comparison; keep 380 gal for the operational record.
Next step
Replace fill estimates in the inventory with documented shell ratings and rerun any earlier calculation that used working volume.