Which containers belong in the oil inventory?

Start with every location that stores or uses oil, not just the tank farm. A 55 US gal drum counts at exactly 55; twenty 5 gal pails do not become a 100 gal container. Classify each item before adding its shell capacity.

How to approach it

  1. Walk each operating area. Record the identifier, location, oil, number of identical units, shell gallons and evidence for each capacity. Include used oil, vegetable oil, standby equipment and oil-filled operating equipment unless an exclusion applies.
  2. Put bunkered, partially buried and vaulted tanks in the aboveground column. Keep completely buried tanks separate and verify whether all technical requirements of 40 CFR part 280 or a state program approved under part 281 cover the tank before excluding it.
  3. Record exclusions individually. A vehicle’s motive-power fuel tank is different from a storage tank that supplies vehicles. An empty seasonal tank is not necessarily permanently closed. Put disputed items in an unresolved column.

Worked example

A depot has four 275 gal oil totes, four 55 gal used-oil drums and twenty 5 gal pails. The totes and drums total 1,320 gal, exactly the ordinary aboveground cutoff. One more 55 gal drum takes it to 1,375 gal. Check the buried total and location test separately.

Next step

Take the counted aboveground total, buried total and largest single aboveground shell into the pathway screen; keep the exclusion register with the site map.