Tool / Air & equipment
Hazardous air pollutant inventory
Combine annual emitted mass by chemical identity, flag repeated emission streams, and identify the largest individual total.
Worksheet
Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.
Your worksheet result
Worked example
Toluene emitted by a booth (800 lb/yr) and an independent wash station (0.3 short ton/yr) adds to 1,400 lb/yr. Two copies of the booth entry need reconciliation, not addition.
See the result for the example inputs
- Estimated actual emissions — Fabrication building, calendar year 2025.
- Toluene (108-88-3): 1400 lb/yr = 0.7 short tons/yr.
- Methanol (67-56-1): 240 lb/yr = 0.12 short tons/yr.
- Largest individual entry: Toluene, 0.7 short tons/yr. Combined entered HAP: 0.82 short tons/yr.
- No repeated stream/identifier pairs found. Verify each identity against the EPA list, resolve any overlap between individual substances and listed groups, and confirm the source boundary. These sums do not establish major- or area-source status.