CleanPermit
Guide / Air & equipment

Aggregate hazardous air pollutants without double counting

Track each listed hazardous air pollutant (HAP) across independent releases, then combine nonoverlapping HAP totals. Under the usual federal section 112 major-source definition, 10 short tons/yr of one HAP and 25 short tons/yr combined are separate, inclusive screens: either can matter. Neither is an exemption test.

How to approach it

  1. Agree on the source boundary, inventory period and emissions basis before adding. Review common control and contiguous source areas, applicable special aggregation rules, and any lower pollutant-specific threshold.
  2. Match chemical names and synonyms to the EPA list and its modifications. Use CAS numbers where available and follow category definitions where there is no single CAS; identify overlap between group totals and individually reported constituents.
  3. Use emitted mass by stream rather than purchased mass unless the documented balance supports that assumption. Reconcile alternate estimates for the same release rather than adding both.

Worked example

A booth emits 6,000 lb/yr of toluene and a separate cleaning line emits 2,000 lb/yr of methylbenzene (the same substance). That is 4 short tons/yr of toluene. A further 1,000 lb/yr of methanol makes 4.5 short tons/yr combined; a second estimate from the booth stack adds nothing unless it covers a distinct release.

Next step

Give the reviewer a species-by-stream table with identifiers, listed-group definitions, and separate actual and potential inventories.

Next on this task

Use the worksheet

All air & equipment resources →