Industrial stormwater outfall sampling planner

Plan a field visit, calculate a collection window from your permit, and decide what to record if you cannot collect.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Use one ID from your current permit or site map, such as OF-02.
HH:MM. Only needed for an observed discharge; use the outfall start, not the first raindrop.
Only for an observed discharge. Copy the window from your applicable permit and method; do not guess.

Worked example

Discharge starts at OF-02 at 23:50. For this example the permit calls for collection within 30 minutes, so the window closes at 00:20 the next day.

See the result for the example inputs
  1. OF-02: collect as soon as the permit directs. From 23:50, the entered 30-minute window ends at 00:20 the next day.
  2. Confirm that this event qualifies and that the permit measures the window from discharge onset. Record storm and discharge start times separately, plus sample time and collector.
  3. Benchmark: obtain the analyte list, units and lab bottles for this point. Compare results on the schedule and averaging basis in the permit.
  4. Use lab-supplied containers and preservation instructions. Record custody, transport conditions and lab receipt against the method’s holding time.