CleanPermit
Guide / Industrial stormwater

Is the lab result above a benchmark or an effluent limit?

Read the heading on the permit table before interpreting the number. Under EPA’s 2021 permit, a benchmark exceedance is not itself a numeric effluent limit violation, but can require additional action. Exceeding an applicable enforceable numeric limit on its stated comparison basis is a violation.

How to approach it

  1. Match the outfall, pollutant, units and sample type; confirm whether the criterion is a single-event value or an average.
  2. For a benchmark, apply the permit’s trigger rules, then document the required review, controls, monitoring and deadlines.
  3. For a numeric limit, evaluate the applicable period and promptly follow noncompliance reporting and corrective-action instructions; do not wait for a benchmark review.

Worked example

A coordinator sees 0.18 mg/L in the lab report and 0.15 mg/L in a worksheet. If 0.15 is an averaging-based benchmark, a single comparison does not establish a limit violation. If it is the applicable daily maximum, it is a different response. These are illustrative numbers, not standards.

Next step

Attach the permit table row to the lab report so the next reviewer sees which response applies.

Next on this task

Use the worksheet

All industrial stormwater resources →