Industrial stormwater

Trace exposure, drainage and sampling decisions.

Work it out

Tools

Read up

Guides

Guide / Industrial stormwater

No exposure certification or no discharge: which record do you need?

No exposure asks what stormwater touches across the facility. No discharge asks where the water goes. A building can release clean roof drainage and still be a no-exposure candidate; an uncovered yard cannot claim no exposure just because its basin looks empty.

Open guide
Guide / Industrial stormwater

Does the loading dock keep materials out of the rain?

A canopy is useful only if it actually protects transfers and residue from precipitation and run-on. Walk the gap between the trailer and dock, and the route pallets take while staff free up indoor space.

Open guide
Guide / Industrial stormwater

Check what leaves the dumpster, not just its lid

Covered, nonleaking waste containers are different from exposed industrial waste. Inspect the bottom seam, drain plugs, pad and pickup area. An open scrap pile beside a sound container is a separate source.

Open guide
Guide / Industrial stormwater

What if two kinds of industrial work share one yard?

A facility’s primary business does not erase other covered industrial activities. Identify who operates each activity, which drainage area it uses and what the applicable permit calls a co-located activity.

Open guide
Guide / Industrial stormwater

Identify a sector from what the facility actually does

Match the facility’s process to the classification used in the issuing permit. In EPA’s 2021 permit, Appendix D pairs four-digit SIC or activity codes with sectors and subsectors. A corporate NAICS code alone is not that match.

Open guide
Guide / Industrial stormwater

Map the route from a work area to receiving water

A useful site map lets a new sampler follow water from an activity through controls to a numbered discharge point. An inlet is only one step along that route.

Open guide
Guide / Industrial stormwater

When can one outfall represent another?

Similar-looking pipes are not enough. The permit must allow representative monitoring for the requirement in question, and you need evidence that the runoff is substantially identical.

Open guide
Guide / Industrial stormwater

Is the lab result above a benchmark or an effluent limit?

Read the heading on the permit table before interpreting the number. Under EPA’s 2021 permit, a benchmark exceedance is not itself a numeric effluent limit violation, but can require additional action. Exceeding an applicable enforceable numeric limit on its stated comparison basis is a violation.

Open guide
Guide / Industrial stormwater

Which changes should reopen a no-exposure review?

Recheck before moving materials outside, changing transfer routes, adding a shift or modifying drainage. No exposure depends on conditions continuing at the entire facility, not just on the date of the last certification.

Open guide