Industrial stormwater no exposure certification checklist

Check industrial materials and activities across the whole facility, including planned changes. See what blocks certification or where to file if the official checklist also checks out. This is not the certification form.

Ready to certify, or still checking the yard?

If a loading area, waste pad or roof drain is unchecked, start with the walkthrough. If the inventory is complete, confirm the issuing program and use its certification process—not this worksheet.

EPA: Stormwater permitting authority by location

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Use the program for the facility and operator. If unsure, choose “Not yet confirmed”.
Follow a delivery from the trailer to storage. Look for spilled powder, wet pallet staging and wind-driven rain.
Check lids, seams and the pad after pickup. Covered, nonleaking dumpsters do not protect loose material on the ground.
Inspect outdoor equipment, raw stock and maintenance work. A drum left outside under the federal sealed-container exception must be secured, sound, nonleaking and without operational taps or valves.
Follow deposits from roof vents to drains and check truck routes, winter storage and planned work. A finished product that can wash away, such as rock salt, is not protected by the federal final-product exception.

Worked example

The day shift unloads indoors. The afternoon pickup leaves metal turnings on the waste pad, and nobody has checked the roof drains.

See the result for the example inputs
  1. Exposure found. Do not certify facility-wide no exposure on these facts.
  2. Waste and scrap storage: Contain loose scrap and replace leaking bins; remove residue from the pad.
  3. Still to verify — Remaining areas and shifts: Follow deposits from roof vents to drains and check truck routes, winter storage and planned work. A finished product that can wash away, such as rock salt, is not protected by the federal final-product exception.
  4. An existing certification does not protect newly exposed discharges. Contact the issuer immediately about coverage and reporting.