CleanPermit
Guide / Industrial stormwater

No exposure certification or no discharge: which record do you need?

No exposure asks what stormwater touches across the facility. No discharge asks where the water goes. A building can release clean roof drainage and still be a no-exposure candidate; an uncovered yard cannot claim no exposure just because its basin looks empty.

How to approach it

  1. For exposure, inventory material handling, storage, equipment and waste, including deposits left after work ends.
  2. For discharge, trace surface flow, pipes, overflow structures and storm sewer connections. Verify where they lead rather than stopping at the fence.
  3. Take drainage evidence to the issuer if relying on no discharge. For no exposure, verify the entire facility against the issuer’s certification; one clean outfall is not enough. This industrial exclusion does not cover construction stormwater.

Worked example

A print shop keeps ink, deliveries and spent rags inside. Its downspout connects to a city storm sewer: that connection rules out calling the roof drainage “retained on site,” but it does not by itself expose ink to rain.

Next step

If the facility meets the criteria, have an authorized signer file a No Exposure Certification (NEC). Use NeT-MSGP where EPA issues the permit or the state program’s instructions where it does not. Keep the receipt with the site inventory.

Next on this task

Use the worksheet

All industrial stormwater resources →