How to approach it
- Watch an entire unloading cycle, including the wait before storage. Check both the first and last pallets.
- Look for rain blowing under the roof, meltwater entering from the yard and forklift tracks carrying spilled material outside.
- Change where goods wait, repair covers or seals and remove residue. Recheck under the conditions that caused the exposure.
Worked example
Bagged pigment stays dry during unloading, but a torn bag leaves a blue trail past the canopy edge. Moving the staging line indoors alone does not solve the residue already in the gutter.
Next step
Record the gap, the cleanup and a wet-weather check before using the dock as evidence of no exposure.