Which changes should reopen a no-exposure review?

Recheck before moving materials outside, changing transfer routes, adding a shift or modifying drainage. No exposure depends on conditions continuing at the entire facility, not just on the date of the last certification.

How to approach it

  1. Compare the proposed work and routes to the last walkthrough, including snow storage, waste pickup and temporary staging.
  2. Keep the planned activity protected, or obtain required permit coverage before the resulting discharge. Do not wait for the renewal date.
  3. If exposure is unexpected, stop or contain the source where safe, document what happened and contact the permitting authority promptly about coverage and reporting.

Worked example

During a roof repair, a warehouse plans to move damaged-goods sorting to the parking lot for two weeks. Its certification still has years left, but the sorting move calls for a new exposure check before the first pallet goes outside.

Next step

Add a stormwater review to the work order and assign a person to verify the temporary layout.