Guide / Industrial stormwater

Check what leaves the dumpster, not just its lid

Covered, nonleaking waste containers are different from exposed industrial waste. Inspect the bottom seam, drain plugs, pad and pickup area. An open scrap pile beside a sound container is a separate source.

How to approach it

  1. Check the lid during normal operations and after pickup. Look for pooled liquid under seams and debris around the wheels.
  2. Identify industrial refuse, metal chips and residues, including material that falls out when the bin is tipped.
  3. Replace or shelter leaking containers, relocate uncovered scrap and remove escaped material. Verify the new arrangement with staff on pickup day.

Worked example

A machine shop closes its chip-bin lid every night, but oily turnings spill during Friday’s bin exchange. The overlooked exposure is on the pad after pickup, not under the closed lid.

Next step

Walk from the bin pad to the first inlet and document what you find.