How to approach it
- List actual processes separately; note whether the same operator controls them and their stormwater controls.
- Check each activity against the issuer’s sector and eligibility tables. Distinguish an independent operation from an incidental task.
- Overlay confirmed activities on drainage areas. Build the outfall monitoring list from applicable sector, receiving-water and site-specific conditions.
Worked example
A sawmill receives logs at the west gate. Its operator also buys and processes outside scrap on an east pad. The mill’s timber classification is not an answer for the separate scrap business or its east drain.
Next step
Give the issuer your activity list and marked-up map if the two operations overlap.