CleanPermit
Guide / Industrial stormwater

Map the route from a work area to receiving water

A useful site map lets a new sampler follow water from an activity through controls to a numbered discharge point. An inlet is only one step along that route.

How to approach it

  1. Start with the property outline, contours and known pipes. Draw drainage boundaries and arrows; distinguish incoming runoff from site drainage.
  2. Label each industrial area, pollutant source, control, outlet, sampling point and receiving water or municipal storm sewer. Flag unknown downstream connections.
  3. Walk the arrows during safe wet conditions. Reconcile field observations with utility records; date the revised map and match IDs to field sheets.

Worked example

A plan sends both roof leaders north, but water from the east leader crosses the scrap pad before entering a trench drain. Redrawing that arrow changes which source the south outfall inspection needs to cover.

Next step

Have someone who did not draw the map locate one sampling point without directions.

Next on this task

Use the worksheet

All industrial stormwater resources →