Prepare the next handoff for a traditional project under the statewide 2022 construction permit. Match a technical or signing role to the actual filing status.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Worked example

A QSP preparing termination gathers the final inspection, dated photos and final site map. The LRP or authorized DAR certifies the request; approval is a separate step.

See the result for the example inputs
  1. QSP: document field conditions, installed controls, inspections and follow-up. Send discrepancies to the QSD and unresolved items to the discharger.
  2. Open the active WDID and select File NOT. Choose the termination reason; for a completed traditional site assemble the final map, QSP final inspection, stabilization photos, and applicable long-term maintenance and finalized post-construction plans.
  3. Route the evidence to the LRP or authorized DAR for certification. Submission is a request; track Regional Water Board approval and keep meeting permit and accrued fee obligations.
  4. A QSD or QSP qualification does not confer signing authority. Confirm who is linked as LRP or authorized DAR.