Who prepares, implements and signs a California stormwater packet?

The Qualified SWPPP Developer (QSD) develops the plan. The Qualified SWPPP Practitioner (QSP) oversees its implementation in the field. A Legally Responsible Person (LRP) or properly authorized representative handles SMARTS certification. Technical qualifications and signing authority are separate.

How to approach it

  1. Have the QSD reconcile the risk assessment, site map, SWPPP and applicable post-construction plans with the disturbance limits and drainage design.
  2. Identify the QSP responsible for implementation, inspections and monitoring. Keep a documented path for field changes and follow-up. A QSD can perform QSP duties; a QSP qualification alone does not qualify the practitioner as a QSD.
  3. Identify the LRP and any duly authorized representative (DAR) linked to the project. A data entry person can assemble uploads but cannot certify. Verify authority, then retain the certification and application reference.

Worked example

The consultant preparing the SWPPP has a QSD credential but only data entry access in SMARTS. They upload the plan and ask the linked LRP or authorized DAR to review and certify, while the QSP receives the current field copy.

Next step

Write down the name for each role, the current plan revision, where field records go and who will certify. Do not use another person’s sign-in.