State filing desks
Find the right records, forms and agency contacts.
Tools
Texas construction stormwater lookup
Find the official search for a permit number, operator, street or county. After searching, enter what you found to get the next verification step. No live records are retrieved here.
Open tool Tool / State filing desksFlorida construction NOI filing prep
Turn a start, expiration or takeover date into a filing target. Check the pollution prevention plan, receiving system and separate approvals.
Open tool Tool / State filing desksCalifornia SMARTS packet builder
Prepare the next handoff for a traditional project under the statewide 2022 construction permit. Match a technical or signing role to the actual filing status.
Open toolGuides
How do I look up a Texas construction stormwater record?
Start with the site-specific authorization, if available. TXR150000 identifies the statewide permit. An RN identifies a site and a CN identifies a customer; neither is itself an authorization.
Open guide Guide / State filing desksTexas small site notice or Notice of Intent?
Texas separates the site notice posted in the field from the Notice of Intent (NOI) filed with TCEQ. The ordinary small-site notice route does not require an NOI, but site size alone does not select the route.
Open guide Guide / State filing desksWhat happens to Texas stormwater records when a lot is sold?
A deed changes ownership, not the name on an NOI authorization. Separate an unfinished lot changing operators from a completed home being handed to its buyer. Keep common areas and remaining lots in view.
Open guide Guide / State filing desksWhat is the difference between a Florida CGP and an ERP?
The construction generic permit (CGP) addresses stormwater discharges during construction. Environmental Resource Permitting (ERP) addresses a different question, such as authorization for the proposed stormwater system or work affecting wetlands. One approval does not establish the other.
Open guide Guide / State filing desksWhat goes into a Florida construction NOI packet?
Build the packet around the actual operator, the mapped work and a stormwater pollution prevention plan ready to implement. DEP’s NOI asks for the plan location; a draft plan is not ready to certify.
Open guide Guide / State filing desksWho gets the Florida construction notice when runoff enters a drain?
Trace the conveyance, not just the city boundary. A publicly operated ditch, inlet or pipe may be part of a municipal separate storm sewer system (MS4). The operator receiving runoff may be a county or district rather than the city.
Open guide Guide / State filing desksWhere do I find a California WDID and proof of coverage?
A SMARTS Application ID tracks an application. A Waste Discharge Identification number (WDID) is issued after the registration is processed. A saved draft, fee payment or submitted application is not the same record.
Open guide Guide / State filing desksWho prepares, implements and signs a California stormwater packet?
The Qualified SWPPP Developer (QSD) develops the plan. The Qualified SWPPP Practitioner (QSP) oversees its implementation in the field. A Legally Responsible Person (LRP) or properly authorized representative handles SMARTS certification. Technical qualifications and signing authority are separate.
Open guide Guide / State filing desksHow do I close a California construction stormwater record?
Use a Notice of Termination (NOT) for the correct active WDID. A last day of grading, sale or submitted request does not by itself end the statewide permit obligations.
Open guide