CleanPermit
Guide / State filing desks

How do I look up a Texas construction stormwater record?

Start with the site-specific authorization, if available. TXR150000 identifies the statewide permit. An RN identifies a site and a CN identifies a customer; neither is itself an authorization.

How to approach it

  1. Read the posted notice or acknowledgment. Copy the number, exact operator name, physical location and project phase.
  2. For a number, use Water Quality General Permits Search. For a name or street, open Advanced Search, select Construction Notice of Intent (TXR15), authorization status ALL, and enter part of the street, site or permittee name. Narrow by city or county; repeat with Construction Waiver (TXRCW) or application status if appropriate.
  3. If the operator name changed, use Central Registry to recover the RN or CN and search again. For an EPA-issued construction permit, such as in Texas Indian country, use EPA Permit Lookup instead.
  4. Compare the returned construction record, location, operator, dates and status. Note whether it is an application or an authorization. Keep the dated record with the field notice.

Worked example

Two phases share “Cedar Ridge” in their name. The result for Phase I lists a different operator and entrance from the Phase II notice. Search the Phase II operator’s CN and match the RN rather than using the first result.

Next step

If no entry matches, ask for the signed notice and filing acknowledgment, if applicable. Under the small-site notice option there may be no NOI to find.

Next on this task

Use the worksheet

All state filing desks resources →