CleanPermit
Tool / State filing desks

Texas construction stormwater lookup

Find the official search for a permit number, operator, street or county. After searching, enter what you found to get the next verification step. No live records are retrieved here.

Already have the street or operator name?

Go straight to the TCEQ construction-record search. Use the finder below if you have a different identifier or need to distinguish a neighboring phase from your project.

TCEQ · Search construction records by street, operator or county

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Use a public identifier or distinctive part of the name. For a county, use its name without “County”.

Worked example

With only a road name, search TCEQ’s Construction Notice of Intent records by Street Name. If a nearby phase is terminated, check the current operator and phase rather than reusing its number.

See the result for the example inputs
  1. Open TCEQ Advanced Search. Choose Construction Notice of Intent (TXR15), set authorization status to ALL, and use “Cedar Ridge Road” in Site Name on Authorization or Street Name. Run Construction Waiver (TXRCW) separately if relevant: https://www2.tceq.texas.gov/wq_dpa/index.cfm?fuseaction=home.permit_info_search
  2. For applications, use the Application status instead of filtering authorizations. A pending application is not an issued authorization.
  3. Compare the operator, site identifier, street and phase against the signed notice. Keep the candidates separate until that match is documented.
Next on this task

Guides for this worksheet

All state filing desks resources →