CleanPermit
Guide / State filing desks

Where do I find a California WDID and proof of coverage?

A SMARTS Application ID tracks an application. A Waste Discharge Identification number (WDID) is issued after the registration is processed. A saved draft, fee payment or submitted application is not the same record.

How to approach it

  1. Use the SMARTS public report “Search for Owners/Operators or Facilities/Sites” or open the linked record in your SMARTS account. Match the owner, location and construction project.
  2. If there is only an Application ID, check the certified submission, fee and linked-user messages for unresolved items. Ask the Water Boards about the existing record rather than starting another application.
  3. Once a WDID is issued, use the Print tab for the Notice of Intent Receipt Letter. Compare the WDID, owner and location and check current status; keep the dated letter with the site records.

Worked example

A bid packet contains an Application ID and a fee receipt. The coordinator locates the submission but cannot find an issued WDID. They report “application submitted; WDID not verified,” not “active.”

Next step

Resolve discrepancies with the Water Boards. For construction subject to the statewide permit, do not use the draft or fee receipt to release work before the WDID is issued.

Next on this task

Use the worksheet

All state filing desks resources →