CleanPermit
Tool / Demolition notices

Compare asbestos quantities by unit

Total inspection entries within each unit and compare each subtotal with its federal threshold.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Enter one amount per line, or use a comma followed by a space (140, 120). Do not use thousands separators. Use 0 for verified none, or “unknown” for an incomplete total.
Enter one amount per line, or use a comma followed by a space (140, 120). Do not use thousands separators. Use 0 for verified none, or “unknown” for an incomplete total.
Only material already off components whose length or area could not previously be measured. Enter one amount per line, or use a comma followed by a space (140, 120). Do not use thousands separators. Use 0 for verified none, or “unknown” for an incomplete total.

Worked example

Two pipe runs of 140 and 120 linear feet total 260 linear feet. That meets the pipe threshold exactly; a separate 70 square feet of panel material stays in the area column.

See the result for the example inputs
  1. At least one entered subtotal meets the federal RACM quantity test.
  2. Pipe material: 260 linear ft — meets or exceeds the 260 linear ft benchmark.
  3. Other components: 70 sq ft — below the 160 sq ft benchmark.
  4. Off-component material: 0 cu ft — below the 35 cu ft benchmark.
  5. Use these comparisons for RACM only: for renovation, count what the work will disturb. One met threshold is enough for the federal quantity test. Never add different units. Covered demolition still requires notice below all three; local triggers and annual aggregation can also apply.
Next on this task

Guides for this worksheet

All demolition notices resources →