Tool / Field inspections
Permit-based inspection calendar
Plan the next three fixed-interval routine inspections and, separately, one confirmed storm inspection. Supply the rule from your permit; this tool does not choose it.
Worksheet
Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.
Your worksheet result
Worked example
If the confirmed routine interval is 14 days after April 1, plan for April 15. A qualifying event on April 14 at 16:20 with a 24-hour elapsed window creates a separate April 15 time limit.
See the result for the example inputs
- Schedule basis supplied by operator: Training permit EX-14 §4B, east grading area: every 14 calendar days plus 24 elapsed hours after a qualifying event.
- Last completed routine walk: 2026-04-01. Next routine planning dates (assuming each walk occurs on the date shown):
- Routine 1: 2026-04-15 • site calendar date
- Routine 2: 2026-04-29 • site calendar date
- Routine 3: 2026-05-13 • site calendar date
- Separate storm inspection: 2026-04-14T16:20-05:00 + 24 elapsed hours = 2026-04-15 21:20 UTC. Convert UTC to site time on the due date.
- No storm walk resets the routine dates here. Recheck the permit for overlapping inspections, nonworking hours, multi-day storms, snowmelt, changed site conditions or stricter local terms.