CleanPermit
Tool / Field inspections

Permit-based inspection calendar

Plan the next three fixed-interval routine inspections and, separately, one confirmed storm inspection. Supply the rule from your permit; this tool does not choose it.

Worksheet

Your entries are calculated in this browser, not sent to CleanPermit. Print the result if you need a copy.

Identify the actual permit, site area, frequency and any storm clause. Do not enter a proposed rule.
Use only a fixed interval that applies to this site area. Not for calendar-month or business-day rules.
For a confirmed event use YYYY-MM-DDTHH:MM with numeric UTC offset, e.g. 2026-04-14T16:20-05:00. Use the trigger defined in your permit, not the forecast time.
Enter whole elapsed hours only for a confirmed event. Otherwise enter a dash (– or -).

Worked example

If the confirmed routine interval is 14 days after April 1, plan for April 15. A qualifying event on April 14 at 16:20 with a 24-hour elapsed window creates a separate April 15 time limit.

See the result for the example inputs
  1. Schedule basis supplied by operator: Training permit EX-14 §4B, east grading area: every 14 calendar days plus 24 elapsed hours after a qualifying event.
  2. Last completed routine walk: 2026-04-01. Next routine planning dates (assuming each walk occurs on the date shown):
  3. Routine 1: 2026-04-15 • site calendar date
  4. Routine 2: 2026-04-29 • site calendar date
  5. Routine 3: 2026-05-13 • site calendar date
  6. Separate storm inspection: 2026-04-14T16:20-05:00 + 24 elapsed hours = 2026-04-15 21:20 UTC. Convert UTC to site time on the due date.
  7. No storm walk resets the routine dates here. Recheck the permit for overlapping inspections, nonworking hours, multi-day storms, snowmelt, changed site conditions or stricter local terms.
Next on this task

Guides for this worksheet

All field inspections resources →