CleanPermit
Guide / Field inspections

How do I record an outfall that is unsafe to reach?

Do not enter floodwater or an unstable bank to fill a box. Document the specific area you could not inspect and the reason; the limitation is not evidence that the outlet was dry, clear or compliant.

How to approach it

  1. Name the map location, time and physical hazard (for example, an overtopped crossing). Record what was visible from a safe location, with its viewpoint, and what remained out of view.
  2. Inspect other areas that can safely be reached. EPA Parts 4.5 and 4.7 address unsafe areas and recording the reason and location. Check your permit for follow-up or notification instructions.
  3. Notify the site lead of unresolved conditions and assign a safe reassessment. If pollution is observed elsewhere, act on that evidence without waiting for access to the outfall.

Worked example

“09:15, OF-2: crossing overtopped. From upper road saw flow into culvert, not the outlet face. West ditch inspected; foreman to reevaluate access at noon.” Do not write “OF-2: no discharge.”

Next step

Add the access limitation to the report and keep the subsequent observation dated separately.

Next on this task

Use the worksheet

All field inspections resources →