Who can inspect the site and who can sign the report?

Field competence and signature authority are two different checks. Under the EPA CGP the operator must use a qualified inspector, while the report signature must meet Appendix G. A training certificate alone is not a delegation of signature authority.

How to approach it

  1. Check the permit’s training and qualification standard before assigning the walk. For EPA coverage review Parts 4.1 and 6.3; retain evidence of the actual inspector’s qualifications.
  2. List everyone who performed the inspection and their title. Check the operator’s legally authorized signatory or the applicable written authorization, its scope and any filing requirements before routing the report.
  3. Have the authorized person review the findings, attachments and required certification. Preserve the signed version and record later corrections as revisions rather than overwriting the original.

Worked example

A trained subcontract inspector can record a failed check dam. Unless separately authorized under the permit, that inspector does not certify the report simply because the superintendent is away.

Next step

Place the training reference and current signing authorization in the site file, and identify a qualified backup before the next walk.