SWPPP inspection field sheet
Blank working copy · not an agency form. Match your permit’s inspection, reporting, certification and retention requirements. Use additional sheets for multiple outfalls or issues.
Use your browser’s Print command to take this sheet to the field or save it as a PDF.
Visit and inspection basis
Project, operator and location Permit authority and coverage ID Local finish time (HH:MM) Inspectors, titles and qualification reference Inspection frequency and permit clauseName the schedule that applies to the area walked, not just the reason for today’s walk. Inspection basis · Routine / Rain event / Snowmelt discharge / Follow-up
Weather and trigger evidenceFor an event, enter readings, times, units and gauge/station. For snowmelt, also describe discharge. Site / inspection date: ______________________________
Route, findings and follow-up
Phase, areas checked and control IDsUse the map revision and the route actually walked. Identify material storage, exits and control locations. Control findings and observed noncomplianceOne line per location: control ID, whether it worked, what you saw, and any photo or action ID. Include spill or leak risks and places needing a new or changed control. Stabilized and exposed areasIdentify the area, cover and condition. For a paused area include when work stopped and when cover began or was completed. If none applied to this walk, say why. Discharge points, receiving waters and sediment observationsOne line per outlet: map ID, flowing, dry or not observed; visible color, solids, sheen, erosion or deposits; and downstream observations visible from a safe location. Uninspected areas, hazards and follow-upIf the entire route was checked, say so; do not mark an inaccessible point dry. Maintenance, corrective actions and attachmentsLink the control to its action ID, immediate steps, owner, due time and photo or log. For repeated maintenance, record earlier fixes and why the chosen response fits.